Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KS.V ·

Klondike Silver Corp. closes Private Placement and Provides Exploration Update

Financings Exploration Programs

Suite 804 – 750 West Pender Street T: 604.682.2928

Vancouver, B.C., V6C 2T7 Canada F: 604.685.6905

www.KlondikeSilver.com TSX.V: KS / FSE: K1SN

Klondike Silver Corp. closes Private Placement and Provides Exploration Update

December 12, 2018 - Vancouver, Canada – Klondike Silver Corp. ( the “Company”) (TSX.V:KS) is

pleased to announce the closing of the private placement first announced August 21. Total gross

proceeds are $1,051,750. Tranche one closed September 7 for gross proceeds of $840,000 and tranche

two closed December 10 for gross proceeds for $ 211,750. The net proceeds will be used for advancing

properties and for general working capital. Cash compensation totaled $78,500. All Units are subject to

a four-month hold period from the date of issuance. Completion of the Private Placement is subject to

the approval of the TSX Venture Exchange.

Klondike Silver also announces the first phase of drifting will be finished shortly. The next step is the

creation of a drill station. Exploration drilling will commence in January 2019.

About Klondike Silver

Klondike Silver’s Royalty Free ZINC SILVER LEAD land package (100 km 2) is located in the S LOCAN

MINING CAMP (Southeast British Columbia – 138 km North of Teck’s Zinc Silver Lead smelter (Trail B.C.)).

Based on the British Columbia MINFILE mineral database, sixty eight (68) of the one hundred and seventy three

(173) past producing Zinc Silver Lead mines in the Slocan Mining Camp are located in the Klondike Silver land

package. Klondike Silver has created the first real opportunity to invest in and properly explore a sizeable portion

of one of the most historic mining camps in British Columbia. Klondike likes to think of the Slocan as the last

best under explored Zinc S ilver Lead camp in Canada. For additional information please visit the company

website www.klondikesilver.com.

The scientific and technical disclosure in this news release has been reviewed and approved by David Makepeace,

P.Eng., Senior Geologist – Environmental Engineer for Micon International Limit ed, who is an independent

consultant to the Company and Qualified Person as defined in NI 43-101.

CONTACT INFORMATION

Corporate Inquiries:

Dale Dobson: (604) 682-2928

Email: [email protected]

On Behalf of the Board of Directors

Klondike Silver Corp.

"Thomas Kennedy"

Thomas Kennedy

CEO, President and Director

This news release contains certain forward looking statements which involve known and unknown risks, delays, and uncertaintie s

not under the control of Klondike Silver Corp. which may cause actual results, performance or achievements of Klondike Silver

Corp. to be materially different from the results, performance or expectation implied by these forward looking statements. By t heir

nature, forward looking statements involve risk and uncertainties because they relate to events and depend on factors that wi ll or

2

Suite 804 – 750 West Pender Street T: 604.682.2928

Vancouver, B.C., V6C 2T7 Canada F: 604.685.6905

www.KlondikeSilver.com TSX.V: KS / FSE: K1SN

may occur in the future. Actual results may vary depending upon exploration activities, industry production, commodity demand

and pricing, currency exchange rates, and, but not limited to, general economic factors.

Neither the TSX Venture Exchange n or its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.