Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KS.V ·

Drilling Update

Exploration Programs

KLONDIKESILVER.com

KS : TSX.V K1SN : FSE

804 – 750 West Pender St. Vancouver, B.C. Canada, V6C 2T7 T: 604.682.2928

DRILLING UPDATE

June 5, 2019 - Vancouver, Canada – Klondike Silver Corp. (the “Company”) (TSX.V: KS)

announces that the Company has received assay results from the first three Diamond Drill Holes (DDH).

The following are the important intersections within the Main Lode and parallel structures.

Hole Important Intersections Element

Number From To Length Silver Lead Zinc

(m) (m) (m) (g/t) (%) (%)

K-1128 19.15 19.71 0.56 2.3 0.08 0.23

43.83 44.35 0.52 2.5 0.10 0.05

46.79 47.09 0.30 1.0 0.02 0.09

47.55 48.59 1.04 1.6 0.21 0.28

50.11 50.41 0.30 3.5 0.55 0.90

51.63 52.24 0.61 2.5 0.06 0.21

66.78 67.04 0.26 1.1 0.08 0.12

68.62 69.80 1.18 1.5 0.05 0.06

K-1130 4.57 5.40 0.83 1.3 0.03 0.08

53.04 53.34 0.30 2.8 0.03 0.05

65.67 65.94 0.27 5.1 0.26 2.01

78.13 78.39 0.27 1.4 0.01 0.01

K-1131 95.10 95.40 0.30 1.5 0.03 0.09

All DDHs continue to intersect the Main Lode and parallel structures, as predicted in the 3D geological

model and continue to intersect mineralization with those structures. The drill is presently drilling the

sixth (6th) DDH of the original 13-hole drill pattern.

The core is being split by a diamond saw. Half of the sample is sent for assay and the remainder is

placed back in the core box. The assay samples are being sent to ActLabs in Kamloops , B.C., an

accredited laboratory (ISO/IEC 17025, Lab 790).

All samples are crushed to 80% passing 2 mm and then a 250 g riffle split is pulverized to 95% passing

105 µm (lab code: RX1) . A 0.25 g sample of the resulting pulp is di ssolved in 4- acid (near total)

digestion process. The solution is analyzed for 37 elements with an ICP -OES instrument (lab code:

1F2). If individual sample (s) obtain a silver assay result above 100 ppm (g/t) with the 1F2 method, the

sample(s) are re -assayed for silver using a new 30 g of the sample pulp utilizing the fire assay with a

gravimetric finish (lab code: 8 -Ag). If individual sample(s) obtain a lead a nd/or zinc assay result (s)

above 5,000 ppm (0.5%) with the 1F2 method, the sample(s) are re -assayed for those elements using

sodium peroxide fusion (total digestion) and then re -run in an ICP -OES instrument (lab code: 8 -

Peroxide ICP-OES).

A series of QA/QC samples have been added to the sample stream at regular intervals.

2

KLONDIKESILVER.com

KS : TSX.V K1SN : FSE

804 – 750 West Pender St. Vancouver, B.C. Canada, V6C 2T7 T: 604.682.2928

Klondike’s Silvana Mine Zinc Silver Lead project is located in South Eastern B.C., 138 km north of

the Trail B.C. smelter.

Tom Kennedy says: “We are very encouraged with the drill program results so far. Not only have we

continually intersected the Main Lode in all the drill holes but we now have some encouraging assay

results that we are on the right track to advance this exciting project”.

The scientific and technical disclosur e in this news release has been reviewed and approved by David

Makepeace, P.Eng., Senior Geologist – Environmental Engineer for Micon International Limited, who is

an independent consultant to the Company and Qualified Person as defined in NI 43-101.

On Behalf of the Board of Directors Contact Information

Klondike Silver Corp. Corporate Inquiries:

"Thomas Kennedy" Dale Dobson: (604) 682-2928

Thomas Kennedy, B.Comm., J.D. Email: [email protected]

CEO, Director

This news release contains certain forward looking statements which involve known and unknown risks, delays, and

uncertainties not under the control of Klondike Silver Corp. which may cause actual results, performance or achievements of

Klondike Silver Corp. to be materially different from the results, performance or expectation implied by these forward

looking statements. By their nature, forward lookin g statements involve risk and uncertainties because they relate to events

and depend on factors that will or may occur in the future. Actual results may vary depending upon exploration activities,

industry production, commodity demand and pricing, currenc y exchange rates, and, but not limited to, general economic

factors.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.