Koryx Copper Receives Additional Encouraging Drill Results at the Haib Copper Project, Southern Namibia

Drill Results

Koryx Copper Inc.

Suite 888, 700 West Georgia Street,

Vancouver. BC, V7Y 1G5

Canada

Koryx Copper Receives Additional Encouraging Drill Results

at the Haib Copper Project, Southern Namibia

Highlights

• Completed a further 6 diamond drill holes for 1,808 m out of a planned 37 holes in Phase 2

• Results received generally have higher Cu grade than average MRE over large intercepts and include:

• HM73: 88m @ 0.41% Cu (12 to 100m)

228m @ 0.34% Cu (270 to 498m)

• HM68: 46m @ 0.38% Cu (96 to 142m)

14m @ 0.52% Cu (172 to 186m)

60m @ 0.39% Cu (202 to 262m)

• HM74: 46m @ 0.36% Cu (2 to 48m)

22m @ 0.34% Cu (96 to 118m)

• HM69: 8m @ 0.97% Cu (40 to 48m)

14m @ 0.46% Cu (142 to 156m)

• HM70: 4m @ 0.40% Cu (32 to 36m)

46m @ 0.41% Cu (134 to 180m)

• HM71: 8m @ 0.39% Cu (34 to 42m)

6m @ 0.35% Cu (64 to 70m)

• Mo and Au assaying continues to show by-product credits which will be incorporated into the next

MRE update and will contribute to a higher average Cu equivalent grade.

• Extensive surface mapping and drill-core relogging ongoing with the assistance of a highly credible

international porphyry consultant, aiming to improve our geological understanding and core logging

consistency which will assist in improved drill targeting and mineral resource modelling.

• Drilling progressing well with 2 quality drill contractors on site with 2 track-mounted drill rigs each.

• A further 4 man-portable drill rigs are being mobilized to enable safe drilling in the deep valleys and

steep terrain of the project area. 2 of the 4 rigs expected on-site by end-July 2025, with 2 additional

rigs forecast to arrive in October.

• 11,100m of the planned 28,000m drill target for 2025 has been completed to date.

Vancouver, B.C., Canada – July 7, 2025 – Koryx Copper Inc. (“Koryx” or the "Company") (TSX-V: KRY) is pleased

to announce assay results from six drill holes (1,808 m) received as part of the Phase 2 drill program for its

2025 exploration and project development strategy on the wholly-owned Haib Copper Project (“Haib” or the

“Project”) in southern Namibia. Haib is an advanced-stage copper/molybdenum/gold project that is envisaged

to produce a clean copper concentrate via a conventional crushing/milling/flotation metallurgical process,

with the potential for additional copper production via heap leaching.

Heye Daun, Koryx Copper’s President and CEO commented: "Our geological understanding keeps improving

and with the aid of Dr. Warren Pratt, our international ly renowned consultant, we are very encouraged by

what we are seeing, namely not only confirmation of the previously identified higher grade zones, but also

indications of additional higher grade mineralization along previously unappreciated east-west and northwest-

southeast structures related to breccias and shear zones . These near-surface, higher-grade intersections are

very important as they may not only improve the grade of the overall mineral resource estimate, but they also

have the potential to serve as a shallow, higher grade starter pit along this structure. With the arrival of the

first two man-portable drill rigs expected in late-July, we will be able to drill test the continuity of these higher-

grade structures at greater depths , in the topographically more challenging areas of the deposit, which is

something we very much look forward to.”

- 2 -

Figure 1: Plan view indicating the six recent drill hole result locations

Figure 2. Long section looking northeast showing the six reported drill hole intersection depths relative to the model for Cu

mineralization

- 3 -

Discussion of Drill Results

Target 2 Results

HM73 was drilled along the southwestern edge of Target 2 to test the downward extension of breccias mapped

on surface. Excellent results were obtained with on -surface higher grade mineralization shown to be

horizontally wider by some 50m. Currently this shallow mineralization has been modelled to 100m below

surface but based on the greater width likely extends to greater depths. A second deeper higher-grade zone

was shown to extend closer to surface by ~150m and up to about 100m below topography, while t he main

Target 2 deeper higher-grade mineralization was shown to be some 50m wider than previously modelled.

Transition Area between Target 3 and Target 2 Results

HM70 was drilled on the southern edge of the Target 3 and Target 2 transition area and has resulted in the

expansion of the higher-grade zone south-westwards by as much as 100m. This result shows the potential to

extend the wireframe in this gap area to increase tonnage at grades consistent with the Target 2 and Target 3

areas.

Target 4 Results

HM68 and HM69 were drilled in the east of Target 4 to test the possible extension to surface of deeper

mineralization recorded here by the historical drilling. These holes confirm that this mineralization extends

close to surface and is wider on surface by some 40m. HM71 and HM74 were drilled east of HM68 and HM69

by some 50m and 100m respectively. HM71 was positioned further north and appears to have missed the

wider area of the main mineralization zone but intercepted narrow , good grades on the periphery of the

wireframe. HM74 has successfully intersected good minerali zation from s urface which is expected to

marginally increase the grade of the Target 4 area . The holes in the Target 4 area demonstrate the value of

drilling inclined holes to better model the Haib mineralization, and further holes are currently being drilled in

this area.

Surface Mapping

Koryx geological consultant Dr. Warren Pratt’s extensive expertise in porphyry and orogenic related

mineralization systems makes him ideal for working on the deformed Haib porphyry copper deposit. Dr. Pratt’s

recent visit to the Project focused on surface mapping in conjunction with Koryx geologists, to augment the

more detailed logging of core implemented earlier this year. The surface mapping aimed to create strong

surface control of lithology, structure and veining to assist with the ongoing revision of the geological model.

The mapping has confirmed the strong shallow -northeast dipping control of the higher -grade copper

mineralization in the Target 1 area. In addition, the mapping has highlighted similar northeast dipping

structures in the Target 2 area which had not been recognised previously, particularly south of the prominent

east-west creek (Volstruis River) that passes through the middle of the Haib deposit.

Indications are that these shallow northeast dipping structures are shear zones which are associated with

breccias, or the contacts of breccias, and host higher grade copper mineralization, which is observable in the

core assays where they have been inters ected. The recent mapping confirms the Company’s earlier

interpretations that there are strong structural controls and remobilization of primary porphyry copper

mineralization at Haib. These structures represent excellent drill targets to define high grade copper

mineralization using southwest oriented drill holes, in many cases in the opposite directions to existing drill

holes but using the same drill pads.

Mapping is ongoing, focusing on the Target 3 and Target 4 areas.

- 4 -

Table of Significant Intersections

Hole# Zone From (m) To (m) Width (m)1 Cu (%) Mo (%) Au (g/t)

HM68

Entire Hole 0 305 305 0.20 0.005 0.017

Main 96 142 46 0.38 0.008 0.018

Including 100 104 4 0.86 0.000 0.021

Including 110 114 4 0.59 0.004 0.017

Including 138 142 4 0.55 0.007 0.014

Main 172 186 14 0.52 0.006 0.024

Including 176 182 6 0.76 0.003 0.034

Main 202 262 60 0.39 0.010 0.043

HM69

Entire Hole 0 204 204 0.20 0.013 0.009

Main 40 48 8 0.97 0.006 0.003

Including 44 46 2 1.23 0.001 0.003

Main 62 78 16 0.29 0.018 0.014

Main 142 156 14 0.46 0.004 0.022

HM70

Entire Hole 0 216 216 0.22 0.005 0.021

Main 32 36 4 0.40 0.003 0.033

Main 134 180 46 0.41 0.007 0.033

Including 140 144 4 0.66 0.008 0.042

Including 162 170 8 0.57 0.005 0.046

Main 196 206 10 0.30 0.004 0.029

HM71

Entire Hole 0 113 113 0.17 0.010 0.010

Main 34 42 8 0.39 0.001 0.013

Main 64 70 6 0.35 0.004 0.010

HM73

Entire Hole 0 758 758 0.24 0.008 0.021

Main 12 100 88 0.41 0.016 0.030

Including 16 26 10 0.97 0.006 0.060

Main 178 188 10 0.31 0.051 0.029

Main 270 498 228 0.34 0.007 0.021

Including 290 296 6 0.64 0.003 0.032

Including 328 334 6 0.59 0.004 0.029

Including 460 466 6 0.53 0.001 0.013

HM74

Entire Hole 0 210 210 0.20 0.022 0.019

Main 2 48 46 0.36 0.005 0.023

Main 96 118 22 0.34 0.010 0.023

1. Widths are interval widths and not true widths. True widths of the mineralization are unknown. The reported intervals are calculated using the

following parameters:

a. Only Cu (%) was used to determine the intervals

b. The target composite grade is ≥0.30% Cu.

c. Composites start and end with samples ≥0.30% Cu.

d. Grades between 0.20% and 0.30% are included in interval but generally constitute <40% of the interval.

e. Consecutive samples between 0.20% and 0.30% should be fewer than 5 samples (10m).

f. Grades below 0.20% are included but generally constitute <20% of the interval.

g. Consecutive grades <0.2% should be fewer than 2 samples (4m).

- 5 -

Drill Program Discussion

Koryx has appointed 2 highly professional and independent contractors to complete 28,000m of diamond core

drilling over the course of 2025. Each contractor has 2 track mounted drill rigs on site, and for the year to date,

a total of 11,100m has been drilled.

The drilling contractors are mobilizing a further 4 man-portable drill rigs to site. The man-portable drill rigs will

allow for safe drilling of holes located in the deep valleys and steep terrain of the project area. Two man -

portable drill rigs are expected on-site by end-July 2025, with the remaining 4 man-portable drill rigs forecast

to arrive on site in October.

Koryx remains confident in its ability to complete the 2025 plan of 28,000m before the end of the year, and to

complete the total drill plan (55,000m) in H2 2026.

Quality Control

All drill core was logged, photographed, and cut in half with a diamond saw. Half of the core was bagged and

sent to ALS Laboratories Ltd. in Johannesburg, South Africa for analysis (SANAS Accredited Testing Laboratory,

No. T0387), while the other half was quartered with one quarter archived and stored on site for verification

and reference purposes while the other quarter will be used for metallurgical test work. 33 elements are

analyzed by Induced Coupled Plasma (ICP) utilizing a 4 -acid digestion and gold is assayed for using a 30g fire

assay method. Duplicate samples, blanks, and certified standards are included with every batch and are

actively used to ensure proper quality assurance and quality control (“ QA/QC”) The QA/QC frequency is 1 in

20 for each of blanks, duplicates and standards.

Qualified Person

Mr. Dean Richards Pr.Sci.Nat., MGSSA – BSc. (Hons) Geology is the Qualified Person for the Haib Copper

Project and has reviewed and approved the scientific and technical information in this news release and is a

registered Professional Natural Scientist with the South African Council for Natural Scientific Professions (Pr.

Sci. Nat. No. 400190/08) .Mr. Richards is independent of the Company and its mineral properties and is a

Qualified Person for the purposes of National Instrument 43-101.

About Koryx Copper Inc.

Koryx Copper Inc. is a Canadian copper development Company focused on advancing the 100% owned Haib

Copper Project in Namibia whilst also building a portfolio of copper exploration licenses in Zambia. Haib is a

large, advanced (PEA-stage) copper/molybdenum porphyry deposit in southern Namibia with a long history of

exploration and project development by multiple operators. More than 80,000m of drilling has been

conducted at Haib since the 1970’s with significant exploration programs led by companies includi ng

Falconbridge (1964), Rio Tinto (1975) and Teck (2014). Extensive metallurgical testing and various technical

studies have also been completed at Haib to date.

Additional studies are underway aiming to demonstrate Haib as a future long-life, low-cost, low-risk open pit,

sulphide flotation copper project with the potential for additional copper production from heap leaching. Haib

has a current mineral resource of 414Mt @ 0.35% Cu for 1,459Mt of contained copper in the Indicated

category and 345Mt @ 0.33% Cu for 1136Mt of contained copper in the Inferred category (0.25% Cu cut-off).

Mineralization at Haib is typical of a porphyry copper deposit and it is one of only a few examples of a

Paleoproterozoic porphyry copper deposit in the world and one of only two in southern Africa (both in

Namibia). Due to its age, the deposit has been subjected to multiple metamorphic and deformation events

- 6 -

but still retains many of the classic mineralization and alteration features typical of these deposits. The

mineralization is dominantly chalcopyrite with minor bornite and chalcocite present and only minor secondary

copper minerals at surface due to the arid environment.

Further details of the Haib Copper Project are available in the corresponding technical report titled, "NI 43 -101

Technical Report – August 2024 Mineral Resource Estimate for the Haib Copper Project, Namibia" dated effective

August 31, 2024 (the "Technical Report"). The Technical Report and other information is available on the Company's

website at https://koryxcopper.com and under the Company's profile on SEDAR+ at www.sedarplus.ca.

ON BEHALF OF THE BOARD OF DIRECTORS

"Heye Daun"

President, CEO and Director

Additional information is also available by contacting the Company:

Julia Becker

Corporate Communications

[email protected]

+1-604-785-0850

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward-Looking Information

This press release contains "forward-looking information" within the meaning of applicable Canadian securities

legislation. Forward-looking information includes, without limitation, statements regarding the use of proceeds

from the Company's recently completed financings and the future or prospects of the Company. Generally, forward-

looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does

not expect ", "is expected ", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not

anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results

"may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are

necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently

subject to business, market, and economic risks, uncertainties, and contingencies that may cause actual results,

performance, or achievements to be materially different from those expressed or implied by forward-looking

statements. Although the Company has attempted to identify important factors that could cause actual results to

differ materially from those contained in forward-looking information, other factors may cause results not to be as

anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate, as

actual results and future events could differ materially from those anticipated in such statements. Accordingly,

readers should not place undue reliance on forward-looking information. Other factors which could materially

affect such forward-looking information are described in the risk factors in the Company's most recent annual

management discussion and analysis. The Company does not undertake to update any forward-looking information,

except in accordance with applicable securities laws.