Highlights

• Assays reported for a further 17 drill holes for 5,556m of diamond drilling.

• Results received are consistent and confirm mineralisation in the Target areas with Cu grades in line

with and in some cases above the average mineral resource estimate (“MRE”):

• Best intercepts received are as follows:

• HM96: 40m @ 0.37% Cu (4 to 44m)

116m @ 0.36% Cu (228 to 344m)

• HM76: 50m @ 0.33% Cu (102 to 152m)

7m @ 0.37% Cu (216 to 223m)

• HM78: 36m @ 0.33% Cu (86 to 122m)

• HM79: 96m @ 0.31% Cu (74 to 170m)

• HM81: 12m @ 0.49% Cu (182 to 194m)

• HM83: 34m @ 0.35% Cu (10 to 44m)

• HM84: 38m @ 0.33% Cu (4 to 42m)

• Hm86: 30m @ 0.33% Cu (68 to 98m)

92m @ 0.32% Cu (252 to 344m)

• HM91: 52m @ 0.36% Cu (18 to 70m)

46m @ 0.34% Cu (126 to 172m)

• HM100: 30m @ 0.33% Cu (180 to 210m)

10m @ 0.48% Cu (374 to 384m)

• Four additional man portable rigs have arrived in Namibia and are in transit to the site and will

commence drilling in October , bringing the total rig count to eight rigs on the resource drill

program and 2 rigs on Geotech drilling.

• Relogging and geological interpretation focussed on lithology, structure and modelling of Mo and

Au by-products was completed and is currently being used for updated models.

Vancouver, B.C., Canada – October 28, 2025 – Koryx Copper Inc. (“Koryx” or the "Company") (TSX-V: KRY) is

pleased to announce assay results from 17 drill holes (5,556m) received as part of the Phase 2 and 3 drill

program for its 2025 exploration and project development strategy on the wholly-owned Haib Copper Project

(“Haib” or the “Project”) in southern Namibia. Haib is an advanced-stage Cu/Mo/Au project that is envisaged

to produce a copper concentrate via a conventional crushing/milling/flotation metallurgical process, with the

potential for additional copper production via heap leaching.

Heye Daun, Koryx Copper’s President and CEO commented: “The recent batch of 17 assay results represents

a good spread of locations across the entire mineralised system, and from each of the four defi ned Target

areas. Encouragingly, the holes continue to yield consistently positive results and support the mineral resource

at Haib. The site geological team has made notable progress with building an updated geological model, having

completed the relogging of all available drill core, updated the database, and under the guidance of our expert

consultants, have reinterpreted the entire lithological and structural model for the deposit.

We are now in tegrating all this information and with this updated geological model we now have a much

better understanding of the controls and distribution of copper and molybdenum grade. The new model also

allows the geologists to improve, and more accurately estimate, the overall mineral resource. These updated

models are currently being reviewed with the intention of updating and publishing the updated MRE before

the end of 2025, aiming to realise the upside from the drill results received since the previous estimate in August

2024”.

- 2 -

Figure 1: Plan view indicating the seventeen recent drill hole locations. The holes indicated in blue are shown on the long

section below

Figure 2. Long section looking northeast showing ten selected holes of the reported 17 hole intersections relative to the

model for Cu mineralization

- 3 -

Discussion of Drill Results

Target 1 Results:

Recent results at Target 1 have further refined the mineralisation model. HM78 and HM79, drilled northwards

from the Volstruis River, confirmed the shallow -dipping copper mineralisation with results consistent with

expectations. However, HM99, drilled north of HM79 on the same section l ine, returned lower grades,

indicating that mineralisation does not extend as far north as previously modelled —likely due to an

unrecognised fault. HM80, located 40m west of HM79, confirmed the expected narrowing of mineralis ation

near the Quartz Vein boundary with Target 2, showing it occurs further south than predicted and suggesting

a small reduction in tonnage. HM84, drilled 150m east of HM78, successfully closed sample spacing and

delivered results in line with the current model, strengthening confidence in continuity.

Target 2 Results

Drilling at Target 2 continues to confirm strong copper mineralisation. HM83, drilled northwards from the

Volstruis River, outlined the northern limit of the zone with 34m of well -developed near -surface copper,

including 8m at 0.64% Cu, and a second minera lised interval from 64m to 80m. Grades taper off below 80m,

helping define the depth extent of mineralisation in this area. HM100, drilled centrally, successfully closed

spacing and returned results in line with expectations, further strengthening confiden ce in continuity across

the target.

Target 3 Results

Drilling at Target 3 has provided further definition of mineralisation controls and boundaries. HM86, drilled

near the northeastern edge, confirmed copper within porphyritic andesites, with grades increasing at a

shallower depth than predicted by the model. HM87, located 90m east of HM86 where Target 3 overlaps with

Target 2, returned lower than expected grades, with the anticipated broad >0.2% Cu zone absent—likely due

to faulting or a local change in dip towards the northeast. HM93, drilled along the northern edge, refined the

position of the shear zone that defines the mineralisation boundary, showing it to be slightly further south

than modelled. HM96, drilled in the west, successfully closed spacing in this area with results consistent with

expectations, strengthening confidence in continuity.

Target 4 Results

Drilling at Target 4 has confirmed extensions of mineralisation and highlighted areas of potential tonnage gain.

HM76, drilled between Targets 2 and 4 along the Volstruis River, intersected strong copper and molybdenum

mineralisation, including >200 ppm Mo over 160m with multiple samples exceeding 2,000ppm. HM81, drilled

down dip, correlated well with HM76 at depth, confirming continuity of the deeper Cu -Mo zones. HM82,

drilled north of HM76 across the river structure, returned low near -surface grades but s howed increasing

copper and scattered high-grade molybdenum at depth. Infill holes HM91 and HM94, drilled in the centre of

the target, generally aligned with the model, though HM91 revealed a 46m zone averaging 0.34% Cu outside

the current high-grade domain, indicating wider-than-expected mineralisation, while HM94 returned slightly

lower-than-forecast copper due to porphyritic andesite dominance as opposed to breccia, which is more

typical here. HM95, on the eastern edge, intersected deeper copper zones beyond the model, representing a

potential tonnage increase.

- 4 -

Table of Significant Intersections

Hole# Zone From (m) To (m) Width (m)1 Cu (%) Mo (%) Au (g/t)

HM76

Entire Hole 1 223 221 0.24 0.015 0.017

Main 1 22 21 0.34 0.004 0.016

Main 102 152 50 0.33 0.022 0.024

Including 124 136 12 0.47 0.062 0.029

Main 174 202 28 0.31 0.013 0.018

Main 216 223 7 0.37 0.005 0.03

HM78

Entire Hole 0 369 369 0.21 0.001 0.026

Main 60 62 2 3.75 0.002 0.184

Main 86 122 36 0.33 0.001 0.039

Main 240 250 10 0.31 0.004 0.041

HM79

Entire Hole 0 270 270 0.2 0.001 0.03

Main 2 6 4 0.55 0.004 0.026

Main 74 170 96 0.31 0.002 0.044

Including 102 110 8 0.78 0.011 0.057

HM80 Entire Hole 0 260 260 0.14 0.001 0.027

Main 0 14 14 0.36 0 0.068

HM81 Entire Hole 0 220 220 0.19 0.012 0.015

Main 182 194 12 0.49 0.011 0.033

HM82

Entire Hole 0 506 506 0.12 0.004 0.016

Main 206 212 6 0.41 0.004 0.028

Main 250 268 18 0.31 0.01 0.035

HM83

Entire Hole 0 195 195 0.19 0.001 0.011

Main 10 44 34 0.35 0.002 0.017

Including 28 36 8 0.64 0.005 0.026

Main 64 80 16 0.41 0.002 0.019

HM84

Entire Hole 0 240 240 0.23 0.002 0.024

Main 4 42 38 0.33 0.001 0.034

Including 12 20 8 0.46 0.002 0.043

Main 82 88 6 0.37 0.001 0.035

HM86

Entire Hole 0 425 425 0.19 0.001 0.017

Main 68 98 30 0.33 0.002 0.03

Including 76 82 6 0.62 0.004 0.073

Including 94 96 2 0.58 0.002 0.032

Main 184 216 32 0.3 0.001 0.028

Including 214 216 2 0.59 0.003 0.033

Main 252 344 92 0.32 0.002 0.021

HM87 Entire Hole 0 615 615 0.09 0.001 0.025

HM91

Entire Hole 0 246 246 0.2 0.002 0.017

Main 18 70 52 0.36 0.005 0.019

Including 20 26 6 0.69 0.002 0.02

Including 46 58 12 0.61 0.001 0.018

Main 126 172 46 0.34 0.004 0.019

HM93 Entire Hole 0 320 320 0.08 0.001 0.01

Main 106 116 10 0.3 0.001 0.009

- 5 -

Hole# Zone From (m) To (m) Width (m)1 Cu (%) Mo (%) Au (g/t)

HM94 Entire Hole 0 389 389 0.14 0.008 0.014

Main 148 166 18 0.32 0.044 0.014

HM95

Entire Hole 0 223 223 0.2 0.005 0.01

Main 20 26 6 0.56 0.001 0.031

Main 38 48 10 0.31 0.001 0.016

Main 168 174 6 0.31 0.016 0.003

Main 202 223 21 0.31 0.014 0.011

HM96

Entire Hole 0 441 441 0.22 0.003 0.013

Main 4 44 40 0.37 0.005 0.017

Including 12 18 6 0.51 0.007 0.019

Including 34 40 6 0.61 0.002 0.028

Main 228 344 116 0.36 0.004 0.02

Including 270 276 6 0.57 0.001 0.036

Including 282 290 8 0.54 0.002 0.027

Including 302 308 6 1.27 0.006 0.041

HM99

Entire Hole 0 202 201 0.16 0.002 0.047

Main 130 132 2 2.09 0.027 0.027

Main 168 170 2 0.91 0.016 0.069

HM100

Entire Hole 2 413 411 0.21 0.004 0.014

Main 180 210 30 0.33 0.007 0.022

Including 182 186 4 0.66 0.016 0.027

Main 338 346 8 0.3 0.001 0.019

Main 374 384 10 0.48 0.008 0.029

Including 382 384 2 1.27 0.028 0.072

1. Widths are interval widths and not true widths. The reported intervals are calculated using the following parameters:

a. Only % Cuwas used to determine the intervals

b. The target composite grade is ≥0.30% Cu.

c. Composites start and end with samples ≥0.30% Cu.

d. Grades between 0.20% and 0.30% are included in interval but generally constitute <40% of the interval.

e. Consecutive samples between 0.20% and 0.30% should be fewer than 5 samples (10m).

f. Grades below 0.20% are included but generally constitute <20% of the interval.

g. Consecutive grades <0.2% should be fewer than 2 samples (4m).

Resource Modelling Update

The large batch of results reported above have been extremely useful in providing the information to further

define the structural complexity of the system , as well as updating both the lithological and mineralisation

models, particularly in areas where significant faulting has been encountered. The full set of multielement

assays and gold assays have now been added to the database for review and statistical analysis during the

remainder of October, with the intention of producing an updated MRE by the end of the year.

The MRE update is expected to demonstrate the upside from the successful drilling campaigns on the copper

resource and significant increase in the number of molybdenum assays for estimate, as well as the potential

inclusion of gold for the first time as a discreet model.

The increased density of drill results throughout all areas of the mineralised system is also expected to improve

the resource classification in the new block model by converting Inferred material to the Indicated category.

The team expects that with a better understanding of the Inferred material that is expected to remain

following the update, a detailed drill plan can then be developed to target converting the resource to Indicated

category in preparation for the pre-feasibility study publication in 2026.

- 6 -

While the logging and core interpretation used to update the new geological models and MRE will assist with

guiding the future drill planning in the different Target areas, with the arrival of four new drill rigs in October

the team are looking forward to accelerating the drill program to execute the remaining program in the first

half of 2026.

RSU Issuance

The Company has approved the grant of up to an aggregate of 4,135,000 restricted share units (each, an

“RSU”) to certain key executives, officers, consultants and directors of the Company pursuant to the

Company’s Omnibus Plan, of which 1/2 of the RSUs wil l vest 12 months from the date of issuance, and then

one-quarter each after 18 and 24 months. Each RSU represents the right to receive, once vested, one common

share in the capital of the Company for every RSU held, or the cash equivalent thereof based on the fair market

value of the shares of the Company calculated in accordance with the terms of the Omnibus Plan.

The grant of RSUs is subject to any necessary regulatory approvals and requirements of the Exchange.

Quality Control

All drill core was logged, photographed, and cut in half with a diamond saw. Half of the core was bagged and

sent to ALS Laboratories Ltd. in Johannesburg, South Africa for analysis (SANAS Accredited Testing Laboratory,

No. T0387) and ActLabs in Canada, while the other half was quartered with one quarter archived and stored

on site for verification and reference purposes while the other quarter will be used for metallurgical test work.

33 elements are analyzed by Induced Coupled Plasma (ICP) utilizing a 4-acid digestion and gold is assayed for

using a 30g fire assay method. Duplicate samples, blanks, and certified standards are included with every batch

and are actively used to ensure proper quality assurance and quality control (“QA/QC”) The QA/QC frequency

is 1 in 20 for each of blanks, duplicates and standards.

Qualified Person

Mr. Dean Richards Pr.Sci.Nat., MGSSA – BSc. (Hons) Geology is the Qualified Person for the Haib Copper

Project and has reviewed and approved the scientific and technical information in this news release and is a

registered Professional Natural Scientist with the South African Council for Natural Scientific Professions (Pr.

Sci. Nat. No. 400190/08) .Mr. Richards is independent of the Company and its mineral properties and is a

Qualified Person for the purposes of National Instrument 43-101.

About Koryx Copper Inc.

Koryx Copper Inc. is a Canadian copper development Company focused on advancing the 100% owned Haib

Copper Project in Namibia whilst also building a portfolio of copper exploration licenses in Zambia. Haib is a

large, advanced (PEA-stage) copper/molybdenum porphyry deposit in southern Namibia with a long history of

exploration and project development by multiple operators. More than 80,000m of drilling has been

conducted at Haib since the 1970’s with significant exploration programs led by companies includi ng

Falconbridge (1964), Rio Tinto (1975) and Teck (2014). Extensive metallurgical testing and various technical

studies have also been completed at Haib to date.

Additional studies are underway aiming to demonstrate Haib as a future long-life, low-cost, low-risk open pit,

sulphide flotation copper project with the potential for additional copper production from heap leaching. Haib

has a current mineral resource of 511Mt @ 0.33% Cu and 51 ppm Mo for 1,668kt of contained copper and

25.9kt contained Mo in the Indicated category and 308.9Mt @ 0.3 1% Cu and 40 ppm Mo for 949Mt of

contained copper and 12.4kt contained Mo in the Inferred category (0.15% Cu cut-off).

Mineralization at Haib is typical of a porphyry copper deposit and it is one of only a few examples of a

Paleoproterozoic porphyry copper deposit in the world and one of only two in southern Africa (both in

- 7 -

Namibia). Due to its age, the deposit has been subjected to multiple metamorphic and deformation events

but still retains many of the classic mineralization and alteration features typical of these deposits. The

mineralization is dominantly chalcopyrite with minor bornite and chalcocite present and only minor secondary

copper minerals at surface due to the arid environment.

Further details of the Haib Copper Project are available in the corresponding technical report titled, "NI 43 -101

Technical Report – August 2024 Mineral Resource Estimate for the Haib Copper Project, Namibia" dated effective

August 31, 2024 (the "Technical Report"). The Technical Report and other information is available on the Company's

website at https://koryxcopper.com and under the Company's profile on SEDAR+ at www.sedarplus.ca.

- 8 -

On behalf of the Board of Directors

"Heye Daun"

President, CEO and Director

Additional information is also available by contacting the Company:

Julia Becker

Corporate Communications

[email protected]

+1-604-785-0850

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward-Looking Information

This press release contains "forward-looking information" within the meaning of applicable Canadian securities

legislation. Forward-looking information includes, without limitation, statements regarding the use of proceeds

from the Company's recently completed financings and the future or prospects of the Company. Generally, forward-

looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does

not expect ", "is expected ", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not

anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results

"may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are

necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently

subject to business, market, and economic risks, uncertainties, and contingencies that may cause actual results,

performance, or achievements to be materially different from those expressed or implied by forward-looking

statements. Although the Company has attempted to identify important factors that could cause actual results to

differ materially from those contained in forward-looking information, other factors may cause results not to be as

anticipated, estimated, or intended. There can be no assurance that such information will prove to be accurate, as

actual results and future events could differ materially from those anticipated in such statements. Accordingly,

readers should not place undue reliance on forward-looking information. Other factors which could materially

affect such forward-looking information are described in the risk factors in the Company's most recent annual

management discussion and analysis. The Company does not undertake to update any forward-looking information,

except in accordance with applicable securities laws.