Kobo Resources Identifies Multiple High-Priority Gold Targets at its Kotobi Project in Côte d’Ivoire

Exploration Programs

Page 1 of 10

PRESS RELEASE NOVEMBER 13, 2025

Kobo Resources Identifies Multiple High-Priority Gold Targets at its

Kotobi Project in Côte d’Ivoire

Initial Trenching Returns up to 4.0 m at 3.10 g/t Au and 4.0 m at 2.68 g/t Au

within Strong Geochemical Anomalies

• First-pass exploration confirms four robust gold-in-soil anomalies across the 301.8 km²

Kotobi Project, including values exceeding 1,400 ppb Au

• Trenching at the Kotobi 1 target intersects up to 4.0 m at 3.10 g/t Au, confirming a bedrock

source to strong surface anomalies and supporting follow-up trenching and drilling

• Aggressive mechanised trenching and follow-up drilling planned for early 2026

QUEBEC CITY, QC – Kobo Resources Inc. ("Kobo” or the "Company") (TSX.V: KRI) is pleased to report

the results of its first phase grassroots exploration program on its 100% owned Kotobi Licence (the “Kotobi

Project”) covering a 301.8 km2 area. The Kotobi Project is situated 20 km east of Bongouanou in central

eastern Cote d’Ivoire and is underlain by folded Birimian-aged volcano-sediment and meta-sediment units.

Main structures are oriented ENE-WSE to ESE-WNW.

The Company considers this area to be highly prospective for gold mineralisation and originally selected

the Kotobi Project area based on the extensive alluvial artisanal gold diggings in the main drainage

channels in northern parts of the permit.

Edward Gosselin, CEO and Director of Kobo commented: “ Our first phase of work at Kotobi has

established a clear foundation for a new exploration pipeline within our Côte d’Ivoire portfolio. I am very

encouraged by these results, which outline four well-defined geochemical anomalies with gold-in-soil

concentrations exceeding 500 ppb Au along significant strike lengths. Our systematic exploration

approach is successfully outlining multiple areas with significant potential on the property.”

He continued: “The compelling gold mineralisation intersected in the initial trenches at the Kotobi 1 Target

suggest that the current soil geochemical anomalies have a bedrock source containing economic gold

grades. We will be starting an aggressive mechanised trenching program to better understand the

geological controls to gold mineralisation at surface before starting drilling which is expected to begin in

early 2026.”

Soil Geochemistry and Initial Trench Results

Four highly anomalous gold targets have been outlined from the soil geochemistry completed to-date

(referred to as Kotobi 1, Kotobi 2, Kotobi 3, and Kotobi 4). The locations of the individual targets are

shown in Figure 1.

Figure 1: Current Soil Geochemical Sampling Coverage with Geophysical Interpretation – Kotobi

Project

Page 2 of 10

Kotobi 1 Target

Page 3 of 10

Soil sampling on a 25 metre (“m”) by 25 m grid at the Kotobi 1 target has defined a 700-m long NNW

trending anomaly located approximately 150 m west of the interpreted contact between metasediments and

a granodiorite intrusion (Figure 2). The peak gold in soil concentrations reach 1,420 ppb Au.

Figure 2: Kotobi 1 Target Soil Geochemistry and Trenching

Three trenches (KTR014, KTR015 and KTR016) manually excavated along a 350-m strike intersected gold

mineralisation in KTR014 and KTR016. Trench KTR014 intersected 4.0 m at 2.68 g/t Au with a 1-m wide

Page 4 of 10

sub-vertical quartz vein assaying 9.64 g/t Au. Trench KTR016 returned a broad low-grade zone of 18.0 m

at 0.88 g/t* Au including 4.0 m at 3.10 g/t Au and 1.0 m at 10.20 g/t Au (Figure 2 & Table 1).

Table 1: Trench Intersections at the Kotobi 1 Target

Trench

ID From (m) To (m) Interval Au (g/t) Target

KTR014

38 47 9 1.30* Kotobi 1

incl. 41 45 4 2.68 Kotobi 1

incl. 44 45 1 9.64 Kotobi 1

KTR015 No significant mineralised intersections Kotobi 1

KTR016

14 32 18 0.88* Kotobi 1

incl. 23 27 4 3.10 Kotobi 1

incl. 25 26 1 10.20 Kotobi 1

Notes:

* Signifies a greater than 3.0 m interval with <0.30 g/t Au grades included in calculated interval.

Kotobi 2 & 3 Targets

The Kotobi 2 Target is situated 2 km south-east of Agoua Village with peak gold in soil concentrations of

430 ppb Au contained within a 400 m2 area (Figure 4). Kotobi 3 Target is situated 3 km east of the Brou

Akpaoussou Village with peak gold in soil concentrations of 610 ppb Au. There are anomalous gold values

scattered across a 1,400 m strike that require more detailed infill sampling.

The distance between the Kotobi 2 and Kotobi 3 Targets is approximately 6.3 km and the two targets may

be controlled by the same apparent NE trending structure (Figure 3). There are anomalous soil values in

between the two areas which will be the focus of more detailed infill sampling.

Figure 4: Kotobi 2 & Kotobi 3 Targets Soil Geochemistry

Page 5 of 10

Kotobi 4 Target

Page 6 of 10

The Kotobi 4 Target is located 2.4 km west of Assouakro Village in northern parts of the Kotobi Project

licence. It is situated in an area where there is significant artisanal alluvial gold mining activity. The anomaly

is strong, robust and well developed. The anomaly extends along an 800-m strike and is up to 150-m wide.

Peak gold in soil concentrations reach 780 ppb Au (Figure 4).

Figure 4: Kotobi 4 Target Soil Geochemistry

Kotobi Project Background

The Kotobi Project is situated within the Birimian Dimbokro-Abengourou Belt of the Boaulé-Mossi Domain

within the West African Craton. The geology comprises folded Birimian-aged volcano-sediment and meta-

sediments. Lithologies on the Kotobi Project licence are predominantly meta-sandstones and siltstones

with several small intrusions emplaced along the principal faults. The main structures are oriented ENE-

WSE to ESE-WNW (Figure 5).

The Company considers the area to be highly prospective for gold mineralisation. It originally selected the

Kotobi Project area based on the extensive alluvial artisanal gold diggings in the main drainage channels

in northern parts of the permit.

A drone UAV magnetic survey was completed across the licence in 2023 by MWH Geosurveys International

Inc. The geophysical data was reprocessed and interpreted by Paterson, Grant & Watson (PGW – Toronto)

Page 7 of 10

in 2023. PGW selected two main targets to focus initial exploration. The gold mineralisation intersected in

trenches detailed in this press release are located within PGW’s top priority target area.

Since commencing exploration, the Company has assayed 7,356 soil samples, 46 termite mound samples,

95 samples from 9 shallow pits, 79 rock chip samples and 385 channel samples in 13 surface exposures

and in 3 manually dug trenches across one of the initial soil anomalies.

There have been several phases of soil sampling on the property. The southern parts of the Kotobi Project

has been sampled on a 400 m by 50 m grid. More recently sampling has occurred in northern parts of the

property on an 800 m by 50 m grid with infill sampling on 100 m by 5 0m grids, and in some areas down to

25 m by 25 m grids to better define the soil anomalies. The extent of soil sampling completed on the Kotobi

Project licence to date is shown in Figure 2.

Figure 5: Interpreted Geology Map of the Kotobi Licence

Page 8 of 10

Sampling, QA/QC, and Analytical Procedures