KORE Mining Launches Preliminary Economic Assessment FOR Long Valley GOLD Project
TSXV - KORE OTCQX - KOREF
KORE MINING LAUNCHES PRELIMINARY ECONOMIC ASSESSMENT FOR
LONG VALLEY GOLD PROJECT
Vancouver, BC August 1 8, 2020 - KORE Mining Ltd. (TSXV: KORE | OTCQ X: KOREF) (“ KORE” or the
“Company”) has commenced work on a Preliminary Economic Assessment (“PEA”) of the Long Valley
project (“Project” or “Long Valley”) located in Mono County , California. Engineering is well advanced,
with results expected in late Q3 2020.
Scott Trebilcock, President and CEO stated, “Long Valley is a large, shallow gold deposit with great oxide
heap leach metallurgy. The Long Valley PEA will come as an important milestone for KORE as we
continue to extract value out of our advanced heap leach projects in the United States. The Imperial PEA
was a significant catalyst for KORE and we expect the Long Valley PEA will continue to demonstrate the
quality of our world-class assets.”
Mr. Trebilcock continued, “ The Long Valley PEA will also demonstrate why KORE is allocating capital to
the Long Valley deposit, which remains open for exploration in shallow oxides and for new sulphide
discoveries. KORE has the funding to advance our assets , deliver catalysts and take advantage of the
strong gold market.”
The PEA will scope an open pit mine with heap leach processing of oxide and transition materials. The
Project is expected to benefit from nearby skilled labour, major highways and power infrastructure. Long
Valley has extensive oxide metallurgical testing which showed the oxide and transition materials are
amenable to heap leaching and has the potential for high recoveries. The shallow nature of the deposit
will enable full compliance with California’s stringent reclamation requirements including backfilling in the
PEA.
The current mineral resource estimate is 1,247,000 ounces of Indicated gold and 486,000 ounces of
Inferred gold from 66.8 million tonnes of 0.58 grams per tonne and 23.6 million tonnes of 0.65 grams per
tonne, respectively. The mineral re source consists of oxide, transition and sulphides. The estimate was
prepared by Neil Prenn, P.E., and Steven Weiss, C.P.G. of Mine Development Associates with an effective
date of November 15, 2019. More information is available in the technical report filed on www.sedar.com
and on KORE’s website at www.koremining.com.
Long Valley was historically assayed almost exclusively for gold . The limited silver assays on the project
showed up to 10 times the gold grade in silver. This represents a future upside for the project that will
not be included in the PEA , but will likely be incorporated in future resource updates and reported with
new drilling.
On January 30, 2020 and March 24, 2020 , KORE announced results from several rounds of ground
geophysics, soil sampling and rock sampling at Long Valley. The work generated multiple drill targets to
grow shallow oxide mineralization, opening the deposit to growth on-strike and laterally. The geophysics
also generated clear sulphide feeder structure drill targets to make new discoveries at depth and open a
new frontier for exploration at the Project. Sulphide potential is further highlighted by the fact that 44%
of historic drill holes ended in gold mineralization exceeding the cut-off grade of the deposit, with bottom
hold grades as high as 4.8 grams per tonne.
2
Permitting for drill testing highest priority targets is underway.
About Long Valley Gold Project
Long Valley is a 100% owned gold project located in Mono County, California – see Figure 1. Within the
Project, is the Long Valley deposit, an intact epithermal gold deposit (“Deposit”) with a shallow, large 2.5
by 2 kilometer oxide gold footprint. A total of 896 holes have been drilled on the Project, the majority
being completed by reverse circulation with lesser core, rotary and air track. The average depth of drilling
is less than 90 meters below surface. Figure 1 shows the claims, drill collar locations and mineralized area.
About KORE Mining Ltd.
KORE is 100% owner of a portfolio of advanced gold exploration and development assets in California and
British Columbia. KORE, supported by strategic investors Eric Sprott and Macquarie Bank; and insiders,
including management and Board, own 64% of the basic shares outstanding. Further information on KORE
and its assets can be found on the Company’s website at www.koremining.com and at www.sedar.com,
or by contacting us as [email protected] or by telephone at (888) 407-5450.
On behalf of KORE Mining Ltd
”Scott Trebilcock”
Chief Executive Officer
(888) 407-5450
Investor Relations
Arlen Hansen, KIN Communications
1-888-684-6730
Technical information with respect to the Imperial deposit and project contained in this news release
has been reviewed and approved by Marc Leduc, P.Eng., who is KORE’s designated qualified person
under National Instrument 43-101 for the purposes of this news release.
This news release does not constitute an offer to sell or a solicitation of an offer to sell any KORE common
shares in the United States.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Cautionary Statement Regarding Forward-Looking Information
This news release contains forward- looking statements relating to the future operations of the Company and other statements
that are not historical facts. Forward-looking statements are often identified by terms such as "will", "may", "should", "anticipate",
"expects", “intends”, “indicates” and similar expressions. All statements other than statements of h istorical fact, included in this
release, including, without limitation, statements regarding the future plans and objectives of the Company are forward- looking
statements. Forward -looking statements in this news release include, but are not limited to, s tatements with respect to: the
potential gold structures at the District deposits, next steps and timing regarding follow-up programs at the District, results of the
PEA, including future Project opportunities, future operating and capital costs, closure c osts, AISC, the projected NPV, IRR,
timelines, permit timelines, and the ability to obtain the requisite permits, economics and associated returns of the Imperial
Project, the technical viability of the Imperial Project, the market and future price of and demand for gold, the environmental
impact of the Imperial Project, and the ongoing ability to work cooperatively with stakeholders, including the local levels o f
government. Such forward -looking statements, and any assumptions upon which they are based, are made in good faith and
3
reflect our current judgment regarding the direction of our business. Management believes that these assumptions are
reasonable. Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the
actual results, performance or achievements of the Company to be materially different from any future results, performance or
achievements expressed or implied by the forward-looking information.
Such factors include, among others: risks related to exploration and development activities at the Company’s projects, and factors
relating to whether or not mineralization extraction will be commercially viable; risks related to mining operations and the hazards
and risks normally encountered in the exploration, development and production of minerals, such as unusual and unexpected
geological formations, rock falls, seismic activity, flooding and other conditions involved in the extraction and removal of
materials; uncertainties regarding regulatory matters, including obtaining permits and complying with laws and regulations
governing exploration, development, production, taxes, labour standards, occupational health, waste disposal, toxic substance s,
land use, environmental protection, site safety and other matters, and the potential for existing laws and regulations to be
amended or more stringently implemented by the relevant authorities; uncertainties regarding estimating mineral resources,
which estimates may require revision (either up or down) based on actual production experience; risks relating to fluctuating
metals prices and the ability to operate the Company’s projects at a profit in the event of declining metals prices and the need to
reassess feasibility of a particular project that estima ted resources will be recovered or that they will be recovered at the rates
estimated; risks related to title to the Company’s properties, including the risk that the Company’s title may be challenged or
impugned by third parties; the ability of the Company to access necessary resources, including mining equipment and crews, on a
timely basis and at reasonable cost; competition within the mining industry for the discovery and acquisition of properties f rom
other mining companies, many of which have greater financial, technical and other resources than the Company, for, among other
things, the acquisition of mineral claims, leases and other mineral interests as well as for the recruitment and retention of qualified
employees and other personnel; access to sui table infrastructure, such as roads, energy and water supplies in the vicinity of the
Company’s properties; and risks related to the stage of the Company’s development, including risks relating to limited financial
resources, limited availability of additional financing and potential dilution to existing shareholders; reliance on its mana gement
and key personnel; inability to obtain adequate or any insurance; exposure to litigatio n or similar claims; currently unprofitable
operations; risks regarding the ability of the Company and its management to manage growth; and potential conflicts of interest.
In addition to the above summary, additional risks and uncertainties are describe d in the “Risks” section of the Company’s
management discussion and analysis for the year ended December 31, 2019 prepared as of April 27, 2020 available under the
Company’s issuer profile on www.sedar.com.
Forward-looking statements contained herein are m ade as of the date of this news release and the Company disclaims any
obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as
may be required by applicable securities laws. There can be no assurance that forward- looking information will prove to be
accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly,
readers should not place undue reliance on forward-looking information.
The Imperial PEA is preliminary in nature, it includes inferred mineral resources that are considered too speculative geologically
to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is
no certainty that the Imperial PEA will be realized. There is no certainty that all or any part of the mineral resource will be converted
into mineral reserve. It is uncertain if further exploration will allow improving the classification of the Indicated or Inferred mineral
resource. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
Cautionary Note Regarding Mineral Resource Estimates: Information regarding mineral resource estimates has been prepared
in accordance with the requirements of Canadian securities laws, which differ from the requirements of United States Securiti es
and Exchange Commission (“SEC”) Industry Guide 7. In October 2018, the SEC approved final rules requiring comprehensive and
detailed disclosure requirements for issuers with material mining operations. The provisions in Industry Guide 7 and Item 102 of
Regulation S-K, have been replaced with a new subpart 1300 of Regulation S -K under the United States Securities Act and will
become mandatory for SEC registrants after January 1, 2021. The changes adopted are intended to align the SEC’s disclosure
requirements more closely with global standards as embodied by the Committee for Mineral Reserves International Reporting
Standards (CRIRSCO), including Canada’s NI 43 -101 and CIM Definition Standards. Under the new SEC rules, SEC registrants will
be permitted to disclose “mineral resources” even though they reflect a lower level of certainty than mineral reserves. Additionally,
under the New Rules, mineral resources must be classified as “measured”, “indicated”, or “inferred”, terms which are defined in
and required to be disclosed by NI 43 -101 for Canadian issuers and are not recognized under SEC Industry Guide 7. An “Inferred
Mineral Reso urce” has a lower level of confidence than that applying to an “Indicated Mineral Resource” and must not be
converted to a Mineral Reserve. It is reasonably expected that the majority of “Inferred Mineral Resources” could be upgraded to
“Indicated Mineral Resources” with continued exploration. Accordingly, the mineral resource estimates and related information
may not be comparable to similar information made public by United States companies subject to the reporting and disclosure
requirements under the United States federal laws and the rules and regulations thereunder, including SEC Industry Guide 7.
4
Figure 1 – Claim Maps with Resource Footprint and Geology