KORE Mining Generates Additional Drill Targets at Long Valley GOLD Project
1
TSXV - KORE OTCQB - KOREF
KORE MINING GENERATES ADDITIONAL DRILL TARGETS AT LONG VALLEY GOLD PROJECT
Vancouver, BC March 24, 2020 ‐ KORE Mining Ltd. (TSXV: KORE | OTCQB: KOREF) (“KORE” or the
“Company”) is pleased to announce completion of ground geophysics at the Long Valley gold project
(“Long Valley” or “Project”) which generated additional oxide and potential feeder structure drill targets.
This completes the drill targeting geophysics and sampling program announced January 30, 2020.
Highlights
Completed additional 17.9 line km geophysical surveys
Confirmed continuity of potential north‐south feeder structures now more than 3.5 km in length
and untested by drilling
Expanded undrilled near surface oxide drill targets aligned with potential feeder structures and
current resource
Next step: initial drill program to test highest priority areas
Scott Trebilcock, President and CEO of KORE, stated, “KORE has completed targeting work and is excited
about the Long Valley deposit’s growth potential.” Mr. Trebilcock continued, “Given the large‐scale oxide
targets and clear “feeder structure” targets, our next step is to permit a drill program focused on the
highest priority targets.”
In H2 2019 and early 2020, the KORE exploration team re‐logged 232 of 896 drill holes, conducted
geological mapping, collected rock and soil samples and ran two lines of Induced Polarization (“IP”) and
ground magnetic geophysics coinciding with the re‐logged holes and soil sampling lines. The work
confirmed a new exploration strategy, testing it against known mineralization and generated drill targets.
See news release from January 30, 2020 for results including cross‐sections.
The team has now conducted a total of 23.2 line km of ground induced polarization IP and magnetic
geophysics. The work successfully extended the new exploration strategy across the southern project
claims or about 3.5 km of strike. Figure 1 shows the location of the IP geophysics surveys.
Figure 2 is a plan map of chargeability from the IP geophysics. Areas interpreted as hosting near‐surface
oxide mineralization are characterized by a chargeability low. At least three north‐south trending, open‐
ended, and parallel chargeability anomalies extend through the property. The defined anomaly surface
area is approximately the same size area as the current Long Valley resource. Figure 2 also shows
interpreted faults and "feeder structures" from the resistivity survey.
Figure 3 is a 3D perspective of the resistivity sections. Areas interpreted as potential “feeder structures”
are characterized as linear resistivity highs. At least five north‐south trending, open‐ended, and parallel
resistivity anomalies extend through the property. The potential strike of the anomalies is 3.5 km or more.
Next Steps
The next step is for KORE to drill some of the highest priority targets in both potential feeder structure
sulphides and surficial oxide anomalies. Timing of the drilling is subject to permitting and seasonality.
KORE is engaging with regulatory authorities for a Phase 1 drilling program to test the Company’s new
geological interpretations.
2
About Long Valley Project
Long Valley is 100% owned epithermal gold project located in Mono County California. The Long Valley
deposit is an intact epithermal gold deposit (“Deposit”) with a large 2.5 by 2 kilometer oxide gold footprint.
A total of 896 holes have been drilled on the Project, the majority being completed by reverse circulation
with lesser core, rotary and air track. Figure 1 shows the claims and mineralized area.
The current mineral resource estimate is 1,247,000 ounces of Indicated gold and 486,000 ounces of
Inferred gold from 66.8 million tonnes of 0.58 grams per tonne and 23.6 million tonnes of 0.65 grams per
tonne, respectively. The mineral resource consists of oxide, transition and sulphides. The estimate was
prepared Neil Prenn, P.E., and Steven Weiss, C.P.G. of Mine Development Associates with an effective
date of November 15, 2019. More information is available in the technical report filed on SEDAR at
www.sedar.com and on KORE’s website at www.koremining.com.
About Long Valley Deposit
The Long Valley deposit is an intact low sulphidation epithermal gold/silver deposit, hosted within a
melange of fine to coarse volcanogenic sedimentary lithologies. Mineralization at Long Valley has
developed due to a combination of deep‐rooted fault structures and a resurgence of rhyolite within an
active caldera. The Hilton Creek Fault structure transects and served as a fluid conduit for interaction with
the underlying hydrothermal system, while the rhyolite resurgence caused brittle fracturing of sediments
and created voids or traps for mineralization and gold deposition. The combination of these factors yields
strongly altered kaolin and quartz‐hematite zones that are the primary host for gold mineralization.
About KORE
KORE is 100% owner of a portfolio of advanced gold exploration and development assets in California and
British Columbia. KORE is supported by strategic investors Eric Sprott and Macquarie Bank who, together
with the management and Board own 66% of the basic shares outstanding. Further information on KORE
and its assets can be found on the Company’s website at www.koremining.com or by contacting us as
[email protected] or by telephone at (888) 407‐5450.
On behalf of KORE Mining Ltd
”Scott Trebilcock”
Chief Executive Officer
(888) 407‐5450
Technical information contained in this news release has been reviewed and approved by Marc Leduc,
P.Eng. who is KORE’s qualified person (under National Instrument 43‐101) for the purposes of this news
release.
This news release does not constitute an offer to sell or a solicitation of an offer to sell any KORE common
shares in the United States.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Cautionary Statement Regarding Adjacent Properties and Forward‐Looking Information
This news release contains forward‐looking statements relating to the future operations of the Company
and other statements that are not historical facts. Forward‐looking statements are often identified by
terms such as "will", "may", "should", "anticipate", "expects" and similar expressions. All statements other
3
than statements of historical fact, included in this release, including, without limitation, statements
regarding the future plans and objectives of the Company are forward‐looking statements. Such forward‐
looking statements, and any assumptions upon which they are based, are made in good faith and reflect
our current judgment regarding the direction of our business. Management believes that these
assumptions are reasonable. Forward looking information involves known and unknown risks,
uncertainties and other factors which may cause the actual results, performance or achievements of the
Company to be materially different from any future results, performance or achievements expressed or
implied by the forward‐looking information.
Such factors include, among others: risks related to exploration and development activities at the
Company’s projects, and factors relating to whether or not mineralization extraction will be commercially
viable; risks related to mining operations and the hazards and risks normally encountered in the
exploration, development and production of minerals, such as unusual and unexpected geological
formations, rock falls, seismic activity, flooding and other conditions involved in the extraction and removal
of materials; uncertainties regarding regulatory matters, including obtaining permits and complying with
laws and regulations governing exploration, development, production, taxes, labour standards,
occupational health, waste disposal, toxic substances, land use, environmental protection, site safety and
other matters, and the potential for existing laws and regulations to be amended or more stringently
implemented by the relevant authorities; uncertainties regarding estimating mineral resources, which
estimates may require revision (either up or down) based on actual production experience; risks relating
to fluctuating metals prices and the ability to operate the Company’s projects at a profit in the event of
declining metals prices and the need to reassess feasibility of a particular project that estimated resources
will be recovered or that they will be recovered at the rates estimated; risks related to title to the
Company’s properties, including the risk that the Company’s title may be challenged or impugned by third
parties; the ability of the Company to access necessary resources, including mining equipment and crews,
on a timely basis and at reasonable cost; competition within the mining industry for the discovery and
acquisition of properties from other mining companies, many of which have greater financial, technical
and other resources than the Company, for, among other things, the acquisition of mineral claims, leases
and other mineral interests as well as for the recruitment and retention of qualified employees and other
personnel; access to suitable infrastructure, such as roads, energy and water supplies in the vicinity of the
Company’s properties; and risks related to the stage of the Company’s development, including risks
relating to limited financial resources, limited availability of additional financing and potential dilution to
existing shareholders; reliance on its management and key personnel; inability to obtain adequate or any
insurance; exposure to litigation or similar claims; currently unprofitable operations; risks regarding the
ability of the Company and its management to manage growth; and potential conflicts of interest; and
risks related to the potential impact of the COVID‐19 pandemic.
In addition to the above summary, additional risks and uncertainties are described in the “Risks” section
of the Company’s management discussion and analysis for the interim period ended September 30, 2019
prepared as of November 28, 2019 available under the Company’s issuer profile on www.sedar.com.
Forward‐looking statements contained herein are made as of the date of this news release and the
Company disclaims any obligation to update any forward‐looking statements, whether as a result of new
information, future events or results, except as may be required by applicable securities laws. There can
be no assurance that forward‐looking information will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such statements. Accordingly, readers should not
place undue reliance on forward‐looking information.
There is no certainty that all or any part of the mineral resource will be converted into mineral reserve. It
is uncertain if further exploration will allow improving the classification of the Indicated or Inferred mineral
resource. Mineral resources are not mineral reserves and do not have demonstrated economic viability.
4
Figure 1 – Plan with Location of Geophysics Lines Over Geology and Alteration
5
Figure 2 – Plan Map of Near Surface Oxide Gold Anomalies from Chargeability
6
Figure 3 – Potential Sulphide Feeder Structure Interpretation from Resistivity in Sections