Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KORE.V ·

KORE Mining Generates Additional Drill Targets at Long Valley GOLD Project

Exploration Programs

1 

TSXV - KORE OTCQB - KOREF

KORE MINING GENERATES ADDITIONAL DRILL TARGETS AT LONG VALLEY GOLD PROJECT 

Vancouver,  BC  March  24,  2020 ‐   KORE  Mining  Ltd.  (TSXV:  KORE  |  OTCQB:  KOREF)  (“KORE”  or  the 

“Company”)  is  pleased  to  announce  completion  of  ground  geophysics  at  the  Long  Valley  gold  project 

(“Long Valley” or “Project”) which generated additional oxide and potential feeder structure drill targets.  

This completes the drill targeting geophysics and sampling program announced January 30, 2020. 

Highlights 

 Completed additional 17.9 line km geophysical surveys 

 Confirmed continuity of potential north‐south feeder structures now more than 3.5 km in length 

and untested by drilling 

 Expanded undrilled near surface oxide drill targets aligned with potential feeder structures and 

current resource 

 Next step: initial drill program to test highest priority areas 

Scott Trebilcock, President and CEO of KORE, stated, “KORE has completed targeting work and is excited 

about the Long Valley deposit’s growth potential.”  Mr. Trebilcock continued, “Given the large‐scale oxide 

targets and clear “feeder  structure” targets, our  next step is  to  permit a  drill program focused on the 

highest priority targets.” 

In  H2  2019  and  early  2020,  the  KORE  exploration  team  re‐logged  232  of  896  drill  holes,  conducted 

geological mapping, collected rock and soil samples and ran two lines of Induced Polarization (“IP”) and 

ground  magnetic  geophysics  coinciding  with  the  re‐logged  holes  and  soil  sampling  lines.   The  work 

confirmed a new exploration strategy, testing it against known mineralization and generated drill targets.   

See news release from January 30, 2020 for results including cross‐sections.  

The  team  has  now  conducted  a  total  of  23.2  line  km  of  ground  induced  polarization  IP  and  magnetic 

geophysics.   The work successfully extended the new exploration strategy across the southern project 

claims or about 3.5 km of strike.  Figure 1 shows the location of the IP geophysics surveys. 

Figure 2 is a plan map of chargeability from the IP geophysics. Areas interpreted as hosting near‐surface 

oxide mineralization are characterized by a chargeability low.  At least three north‐south trending, open‐

ended, and parallel chargeability anomalies extend through the property.  The defined anomaly surface 

area  is  approximately  the  same  size  area  as  the  current  Long  Valley  resource.  Figure  2  also  shows 

interpreted faults and "feeder structures" from the resistivity survey. 

Figure 3 is a 3D perspective of the resistivity sections. Areas interpreted as potential “feeder structures” 

are characterized as linear resistivity highs.  At least five north‐south trending, open‐ended, and parallel 

resistivity anomalies extend through the property. The potential strike of the anomalies is 3.5 km or more. 

Next Steps 

The next step is for KORE to drill some of the highest priority targets in both potential feeder structure 

sulphides and surficial oxide anomalies.   Timing of the drilling is subject to permitting and seasonality.  

KORE is engaging with regulatory authorities for a Phase 1 drilling program to test the Company’s new 

geological interpretations.   

2 

About Long Valley Project 

Long Valley is 100% owned epithermal gold project located in Mono County California. The Long Valley 

deposit is an intact epithermal gold deposit (“Deposit”) with a large 2.5 by 2 kilometer oxide gold footprint.  

A total of 896 holes have been drilled on the Project, the majority being completed by reverse circulation 

with lesser core, rotary and air track. Figure 1 shows the claims and mineralized area.   

The  current  mineral  resource  estimate  is  1,247,000  ounces  of  Indicated  gold  and  486,000  ounces  of 

Inferred gold from 66.8 million tonnes of 0.58 grams per tonne and 23.6 million tonnes of 0.65 grams per 

tonne, respectively.  The mineral resource consists of oxide, transition and sulphides.  The estimate was 

prepared Neil Prenn, P.E., and Steven Weiss, C.P.G. of Mine Development Associates with an effective 

date  of  November  15,  2019.   More  information  is  available  in  the  technical  report  filed  on  SEDAR  at 

www.sedar.com and on KORE’s website at www.koremining.com.  

About Long Valley Deposit 

The  Long  Valley  deposit  is  an  intact  low  sulphidation  epithermal  gold/silver  deposit,  hosted  within  a 

melange  of  fine  to  coarse  volcanogenic  sedimentary  lithologies.   Mineralization  at  Long  Valley  has 

developed due to a combination of deep‐rooted fault structures and a resurgence of rhyolite within an 

active caldera.  The Hilton Creek Fault structure transects and served as a fluid conduit for interaction with 

the underlying hydrothermal system, while the rhyolite resurgence caused brittle fracturing of sediments 

and created voids or traps for mineralization and gold deposition.  The combination of these factors yields 

strongly altered kaolin and quartz‐hematite zones that are the primary host for gold mineralization. 

About KORE 

KORE is 100% owner of a portfolio of advanced gold exploration and development assets in California and 

British Columbia.  KORE is supported by strategic investors Eric Sprott and Macquarie Bank who, together 

with the management and Board own 66% of the basic shares outstanding.  Further information on KORE 

and its assets can be found on the Company’s website at www.koremining.com or by contacting us as 

[email protected] or by telephone at (888) 407‐5450.  

On behalf of KORE Mining Ltd 

”Scott Trebilcock” 

Chief Executive Officer 

(888) 407‐5450 

Technical information contained in this news release has been reviewed and approved by Marc Leduc, 

P.Eng. who is KORE’s qualified person (under National Instrument 43‐101) for the purposes of this news 

release. 

This news release does not constitute an offer to sell or a solicitation of an offer to sell any KORE common 

shares in the United States.  

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the 

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this 

release. 

Cautionary Statement Regarding Adjacent Properties and Forward‐Looking Information 

This news release contains forward‐looking statements relating to the future operations of the Company 

and  other  statements  that  are  not  historical  facts.  Forward‐looking  statements  are  often  identified  by 

terms such as "will", "may", "should", "anticipate", "expects" and similar expressions. All statements other 

3 

than  statements  of  historical  fact,  included  in  this  release,  including,  without  limitation,  statements 

regarding the future plans and objectives of the Company are forward‐looking statements.  Such forward‐

looking statements, and any assumptions upon which they are based, are made in good faith and reflect 

our  current  judgment  regarding  the  direction  of  our  business.  Management  believes  that  these 

assumptions  are  reasonable.  Forward  looking  information  involves  known  and  unknown  risks, 

uncertainties and other factors which may cause the actual results, performance or achievements of the 

Company to be materially different from any future results, performance or achievements expressed or 

implied by the forward‐looking information.   

Such  factors  include,  among  others:  risks  related  to  exploration  and  development  activities  at  the 

Company’s projects, and factors relating to whether or not mineralization extraction will be commercially 

viable;  risks  related  to  mining  operations  and  the  hazards  and  risks  normally  encountered  in  the 

exploration,  development  and  production  of  minerals,  such  as  unusual  and  unexpected  geological 

formations, rock falls, seismic activity, flooding and other conditions involved in the extraction and removal 

of materials; uncertainties regarding regulatory matters, including obtaining permits and complying with 

laws  and  regulations  governing  exploration,  development,  production,  taxes,  labour  standards, 

occupational health, waste disposal, toxic substances, land use, environmental protection, site safety and 

other  matters,  and  the  potential  for  existing  laws  and  regulations  to  be  amended  or  more  stringently 

implemented  by  the  relevant  authorities;  uncertainties  regarding  estimating  mineral  resources,  which 

estimates may require revision (either up or down) based on actual production experience; risks relating 

to fluctuating metals prices and the ability to operate the Company’s projects at a profit in the event of 

declining metals prices and the need to reassess feasibility of a particular project that estimated resources 

will  be  recovered  or  that  they  will  be  recovered  at  the  rates  estimated;  risks  related  to  title  to  the 

Company’s properties, including the risk that the Company’s title may be challenged or impugned by third 

parties; the ability of the Company to access necessary resources, including mining equipment and crews, 

on a timely basis and at reasonable cost; competition within the mining industry for the discovery and 

acquisition of properties from other mining companies, many of which have greater financial, technical 

and other resources than the Company, for, among other things, the acquisition of mineral claims, leases 

and other mineral interests as well as for the recruitment and retention of qualified employees and other 

personnel; access to suitable infrastructure, such as roads, energy and water supplies in the vicinity of the 

Company’s  properties;  and  risks  related  to  the  stage  of  the  Company’s  development,  including  risks 

relating to limited financial resources, limited availability of additional financing and potential dilution to 

existing shareholders; reliance on its management and key personnel; inability to obtain adequate or any 

insurance;  exposure to litigation or similar claims; currently unprofitable operations; risks regarding the 

ability of the Company and its management to manage growth; and potential conflicts of interest; and 

risks related to the potential impact of the COVID‐19 pandemic.   

In addition to the above summary, additional risks and uncertainties are described in the “Risks” section 

of the Company’s management discussion and analysis for the interim period ended September 30, 2019 

prepared as of November 28, 2019 available under the Company’s issuer profile on www.sedar.com. 

Forward‐looking  statements  contained  herein  are  made  as  of  the  date  of  this  news  release  and  the 

Company disclaims any obligation to update any forward‐looking statements, whether as a result of new 

information, future events or results, except as may be required by applicable securities laws. There can 

be no assurance that forward‐looking information will prove to be accurate, as actual results and future 

events could differ materially from those anticipated in such statements. Accordingly, readers should not 

place undue reliance on forward‐looking information.   

There is no certainty that all or any part of the mineral resource will be converted into mineral reserve. It 

is uncertain if further exploration will allow improving the classification of the Indicated or Inferred mineral 

resource.  Mineral resources are not mineral reserves and do not have demonstrated economic viability. 

4 

Figure 1 – Plan with Location of Geophysics Lines Over Geology and Alteration 

5 

Figure 2 – Plan Map of Near Surface Oxide Gold Anomalies from Chargeability 

6 

Figure 3 – Potential Sulphide Feeder Structure Interpretation from Resistivity in Sections