KORE MINING ANNOUNCES RESULTS FROM PEA - US$ 263M NPV5% WITH IRR OF 40% USING US $1,600 GOLD AT LONG VALLEY GOLD DEPOSIT Shallow, Open Pit, Heap Leach Operation with Nearby Infrastructure Models as Low Cost ~100,000 per annum Gold Production

Economic Studies Metallurgy & Processing

1

TSXV - KORE OTCQX - KOREF

KORE MINING ANNOUNCES RESULTS FROM PEA - US$ 263M NPV5% WITH IRR OF 40%

USING US $1,600 GOLD AT LONG VALLEY GOLD DEPOSIT

Shallow, Open Pit, Heap Leach Operation with Nearby Infrastructure

Models as Low Cost ~100,000 per annum Gold Production

Vancouver, BC September 15, 2020 - KORE Mining Ltd. (TSXV: KORE | OTCQX : KOREF) (“ KORE” or the

“Company”) is pleased to announce a positive Preliminary Economic Assessment (“ PEA”) for the

Company’s 100% owned Long Valley Gold Deposit (“Long Valley” or “Project”), located in California, USA.

The PEA demonstrates Long Valley’s potential to generate strong economic returns while being in full

compliance with California’s stringent operating and reclamation standards. Long Valley has clear upside

potential from targets on-strike and lateral to the current modelled oxide mineralization and KORE intends

to aggressively explore this untapped potential.

LONG VALLEY PROJECT PEA HIGHLIGHTS:

• Robust economics: US$ 263 million NPV5% post-tax with 40% IRR at US$ 1,600 per ounce gold

• 100,000 ounces gold per year over 7 years at AISC of US$ 732 per ounce

• Technically simple: shallow open pit, heap leach with nearby infrastructure

• Significant leverage to gold: US$ 396 million NPV5% at recent spot US$ 1,900 per ounce gold

• Unmodelled silver potential from metallurgical test-work

• Shallow oxide and sulphide feeder exploration potential to further enhance project

Watch a video (50 seconds) of Scott Trebilcock, KORE’s CEO, summarizing the highlights of the Long Valley

PEA – click here. Refer to the Long Valley PEA Summary infographic in Figure 1.

KORE’s CEO Scott Trebilcock stated: “The Long Valley PEA generated an NPV5% of US$ 396 million at US$

1,900 per ounce gold. In addition, KORE has a preliminary economic assessment on its Imperial Project,

published on May 19, 2020, which generated an NPV5% of US$ 660 million at US$ 1,900 per ounce gold.

KORE has the unique advantage of having two simple, low-cost heap leach development projects in one

Company and can manage capital needs for growth, permitting and construction to maximize shareholder

value.”

Mr. Trebilcock continued, “ The Long Valley PEA is a key milestone towards KORE’s becoming a significant

North American producer envisioning production of 250,000 ounces of gold a year from our US projects.”

KORE’s COO Marc Leduc added: “ The mine plan at Long Valley complies with California’s stringent

reclamation and environmental laws while delivering skilled jobs and long -term regional economic

development. KORE’s next step is to grow Long Valley by drilling oxide and sulphide targets while further

defining silver potential.”

The PEA is preliminary in nature and includes inferred mineral resources that are considered too

speculative geologically to have the economic considerations applied to them that would enable them to

be categorized as mineral reserves. There is no certainty that the PEA will be realized. Mineral resources

that are not mineral reserves do not have demonstrated economic viability.

2

TSXV - KORE OTCQX - KOREF

PEA SUMMARY

The PEA was prepared in accordance with National Instrument 43 -101 (“NI 43-101”) by Global Resource

Engineering (Denver) (“GRE”) - Terre Lane, RMSME MMSAQP, Todd Harvey, PhD, RMSME in conjunction

with a revised resource estimate prepared by Mine Development Associates and authored by Neil Prenn,

PE. The team was led by Marc Leduc, P.Eng. the COO of KORE Mining. The Company plans to file the PEA

on SEDAR at www.sedar.com within 45 days in accordance with NI 43-101.

This news release contains info rmation from a preliminary economic assessment, which is a conceptual

study, and other forward -looking information about potential future results and events. Please refer to

the cautionary statements in the footnotes below and the Cautionary Statements located at the end o f

this news release, which include associated assumptions, risks, uncertainties and other factors.

Unless otherwise stated, all dollar figures are in United States dollars (“$”) and masses are in short tons.

Economics Pre-Tax Post-Tax

Net present value (NPV5%) at 0.75C$/US$ C$ millions $479 $351

Net present value (NPV5%) US$ millions $359 $263

Internal rate of return (IRR) % 48% 40%

Payback (undiscounted) Years 2.0 2.3

LOM avg. annual cash flow after tax & capital US$ millions $95 $78

LOM cumulative cash flow (undiscounted) US$ millions $503 $384

Gold price assumption US$ per ounce $1,600

Mine life Years 7

Average annual mining rate million tons/yr 18.5

Average annual gold production thousand ounces/yr 100

Total LOM recovered gold thousand ounces 717

Initial capital costs US$ millions $158

Life-of-mine (“LOM”) calculation and “Mine Life” is defined as the duration of mining operations, 7 years.

There are additional years of site work for residual leaching, washing, back -filling and reclamation

modelled.

3

TSXV - KORE OTCQX - KOREF

GOLD PRICE SENSITIVITIES

The following table demonstrates the post- tax sensitivities of NPV and IRR to gold price per ounce . The

base case, highlighted in the table below, assumes US$1,600 per ounce of gold:

Economic Sensitivities to Gold Prices (post-tax)

Per ounce of gold (NPV5%) millions IRR%

US$1,200 US$ 86 19%

US$1,400 US$ 174 30%

US$1,600 US$ 263 40%

US$1,800 US$ 351 49%

US$2,000 US$ 440 57%

US$2,200 US$ 527 65%

OPPORTUNITIES

The PEA outlined a number of initiatives that may enhance the Project including:

• Assaying silver in all future drill programs to add silver into the resources;

• Conducting metallurgical tests to establish optimal crush size and cement addition;

• Performing test work on very low-grade samples to determine viability of run-of-mine leaching;

• Reviewing contract mining to reduce initial capital; and

• Drilling for more oxide resources and deep sulfides to look for high-grade feeder zones.

NEXT STEPS

This PEA demonstrates the robust nature of the current Long Valley mineralization. However, there is a

clear opportunity to grow shallow oxide mineralization as the mineralization remains open in all directions

and on a separate parallel structure. Additional mineralization could extend mine life, reduce capital

intensity and generate higher project economic returns. A summary of oxide expansion targets is included

in Figure 2.

Additionally, as a fully intact epithermal deposit with a large at surface footprint, Long Valley has the

potential for high-grade sulphides in the underlying feeder structures. Discovering high-grade sulphides

would open up additional development pathways for the Project, such as underground mining and milling

of mineralization. A summary of sulphide expansion targets is included in Figure 3.

KORE plans to drill-test the highest priority oxide and sulphide targets. KORE is currently permitting drill

pads with our regulator the US Forest Service (“ USFS”). Drilling is planned for H1 2021, subject to USFS

permitting timelines.

Details of the Long Valley exploration targets are in KORE news releases dated January 30, 2020 and March

24, 2020.

LONG VALLEY PEA DETAILS

GRE notes that the Long Valley Project has an abundan ce of drill data as a result of the exploration

completed in the 1980s and 1990s. The Project also has metallurgical sampling and testing from previous

4

TSXV - KORE OTCQX - KOREF

owners, reviewed by GRE , to support the initial engineering design. This data will act as an important

background and aid in the design of future work on the project.

MINING & PROCESSING

The PEA presents an open-pit, heap leach scenario where oxide, transition and sulphide ore is stacked on

the leach pads by conveyors after two stages of crushing and agglomeration. The conveyor system is also

used at the end of the mine life to backfill the final pits and reclaim the site to California’s stringent

standards. In the design process, the engineering team also looked at several other scenarios:

• Silver production; a Merrill- Crowe precious metal recovery circuit is included in the project design

to recover both gold and silver. Silver is NOT quantified in the resource or PEA as it was not

assayed regularly in historic drilling but was seen in all of the previous metallurgical test work.

• Smaller, oxide only mine plan that had lower stripping ratio, lower capital and operating costs but

yielded less ounces. KORE ultimately selected the mine plan with the most ounces recovered as

those ounces would likely be mined at current metal prices.

Mining Plan and Processing Summary

Mine life years 7

Mining rate average tons per day 50,600

Strip ratio waste: mineralization 1.4

Total tonnage mined million tons 130.7

Total mineralized material mined million tons 54.2

Heap leach stacking rate average tons per day 21,100

Average LOM grade gram per metric tonne 0.671

Average LOM recovery % 68%

A detailed mine plan by year is included in Table 1 at the end of this news release.

OPERATING COSTS

Mining costs for owner operated mining, processing and other costs were developed from a mix of first-

principle engineering and benchmarked to the many ROM heap leach operations in California and nearby

Nevada. The Long Valley Project is located near a large skilled labour pool and has local access to road

and power infrastructure . The Project has several options for water locally with potential surface and

ground water sources.

Operating Costs (LOM average) (1)

Mining costs (per ton mined) US$/st mined $1.78

Mining costs US$/st processed $4.29

Processing costs US$/st processed $2.64

G&A costs US$/st processed $0.69

Total site operating costs US$/st processed $7.62

Cash Costs*

Cash costs (LOM)* US$/oz $612

(1) Not including post-production reclamation and backfilling. See LOM description above.

5

TSXV - KORE OTCQX - KOREF

The assumed truck diesel fuel price in the PEA is US$ 2.00 per US gallon. About 11% of the mining cost is

fuel so lower fuel prices would decrease mining costs moderately.

INITIAL PRE-PRODUCTION AND SUSTAINING CAPITAL COSTS

Initial capital costs in the PEA are US$ 158 million including a 25% contingency of US$ 31.6 million.

Infrastructure costs are low due to the proximity of road, water and power infrastructure. Initial capital

also assumes KORE is the owner-operator of all equipment. Further enhancements may be possible with

contract mining. Sustaining capital is mainly for heap leach pad expansion and additional mining

equipment.

Pre-Production and Sustaining Capital Costs (US$ millions)

Mining and mine infrastructure $40.6

Heap leach pads and plant $55.5

Infrastructure and G&A $16.8

Working capital $4.4

Contingency (25%) $27.1

Pre-production mining $13.7

Total Pre-Production Cost $158.0

LOM sustaining capital $18.4

Closure incl. backfill (1) $67.5

(1) Closure cost includes final backfilling of the open pit and site reclamation to California’s stringent standards.

The cost includes US$38.7 million in mining cost, US$13.5 million in site operating G&A during back-filling

of the final pit, in addition to US$15.3 million in other site closure costs. Backfill will return the site to plus

25 feet of original topography while re-establishing drainages. The balance of the closure cost is for normal

non-backfill site closure costs to remediate disturbances, remove structures, etc.

ALL-IN-SUSTAINING-COST*

All-in-sustaining costs (“ AISC”)* are competitive with peer projects and in the second quartile when

compared to the World Gold Council AISC cost metric. Long Valley’s AISC* is built up as follows:

AISC* per ounce (US$ millions)

Operating cost (1) $580

Royalties (2) $32

Sustaining capital $26

Closure $94

Total AISC* $732

(1) Operating costs includes US$5 per ounce offsite refining.

(2) Royalties consist of: (a) 1% NSR royalty to Royal Gold; and (b) 1% NSR royalty to Vista Gold.

6

TSXV - KORE OTCQX - KOREF

UPDATED MINERAL RESOURCE ESTIMATE

Long Valley is well drilled with a total of 896 holes, the majority being completed by reverse circulation

with lesser core, rotary and air track from 1988 -1996. The mineral resource model, as presented within

KORE’s December 18, 2019 Technical Report, has been updated using a more detaile d geologic model

which has allowed for the assigning of lithology-specific density values. In addition, the reported resource

estimate has been updated using revised optimization parameters for the constraining pit shell. The

updated estimate, effective September 15, 2020, was prepared by Mine Development Associates and the

resource block model derived by Mine Development Associates was used in the development of this PEA.

The current Mineral Resources are shown in Imperial and Metric units in the tables b elow. The revised

pit-shell parameters, including the use of a higher gold price, US $ 1,800 per ounce, are within the table

footnotes.

Long Valley Mineral Resource Estimate – Imperial Units (as at September 15, 2020)

Classification Cut-Off

(oz / ton)

Quantity

(‘000 tons)

Grade Gold

(oz / ton)

Contained

Gold (‘000 oz)

Indicated

Oxide 0.005 35,276 0.018 635

Transition 0.006 4,026 0.014 56

Sulphide 0.006 30,914 0.017 526

Total Indicated 70,216 0.017 1,217

Inferred

Oxide 0.005 8,997 0.020 180

Transition 0.006 1,277 0.016 20

Sulphide 0.006 14,033 0.018 253

Total Inferred 24,307 0.019 456

Long Valley Mineral Resource Estimate – Metric Units (as at September 15, 2020)

Classification Cut-Off

(g / tonne)

Quantity

(‘000 tonnes)

Grade Gold

(g / tonne)

Contained

Gold (‘000 oz)

Indicated

Oxide 0.17 32,002 0.62 635

Transition 0.21 3,653 0.48 56

Sulphide 0.21 28,045 0.58 526

Total Indicated 63,699 0.58 1,217

Inferred

Oxide 0.17 8,162 0.69 180

Transition 0.21 1,159 0.55 20

Sulphide 0.21 12,731 0.62 253

Total Inferred 22,052 0.65 456

• Numbers may not add or multiply accurately due to rounding.

• Mineral Resources do not have demonstrated economic viability.

• CIM Definition and Standards were followed for the Mineral Resource estimates.

7

TSXV - KORE OTCQX - KOREF

• The Mineral Resource estimate was prepared by Neil Prenn P.E., who is an independent consultant and

Qualified Person for the purpose of NI 43-101.

• Mineral Resources are reported at a 0.005oz Au/ton cut-off grade for oxide material to be processed

using heap leach methods and 0.006oz Au/ton cut-off grade for transition and sulfide material to be

processed by milling methods.

• Mineral Resources are contained within a US$1,800 per ounce optimized pit. Other pit optimization

parameters are:

o Pit Slope: 45 degrees

o Mining: US$1.80 / ton mined

o Crushing: US$1.40 / ton processed

o Heap Leach: US$1.80 / ton processed

o Sulfide Mill: US$10.0 / ton processed

o G&A: US$0.70 / ton processed

o Refining: US$5 / oz Au produced

o Recovery (Oxide): 80% heap recovery

o Recovery (Transition): 90% mill recovery

QUALIFIED PERSONS/QUALITY ASSURANCE

The Preliminary Economic Assessment was prepared by GRE with Terr e Lane, PE being the Q ualified

Person in charge of its preparation and who is independent of KORE. The mineral resource portion of the

PEA was prepared by Neil Prenn, P.E. of Mine Development Associates and who is independent of KORE.

With regards to technical matters in this press release Marc Leduc, P.Eng. is the Qualified Person within

the meaning of NI 43 -101 and has reviewed and validated that the information in this press release is

consistent with that provided by the Qualified Persons responsible for the PEA.

Further information about the PEA referenced in this news release, including information in respe ct of

data verification, key assumptions, parameters, risks and other factors, can be found in the NI 43 -101

technical report for the Long Valley Gold Deposit that the Company intends to file on SEDAR

(www.sedar.com) under KORE’s profile and on the Company’s website (www.koremining.com) within the

next 45 days from the date of this news release.

ALTERNATIVE PERFORMANCE MEASURES (NON-IFRS MEASURES)

Items marked with a * in this news release are alternative performance measures. Alternative

performance measures are furnished to provide additional information. These non -IFRS performance

measures are included in this news release because the Company believes these statistics are ke y

performance measures that provide investors, analysts and other stakeholders with additional

information to understand the costs associated with the Project. These performance measures do not

have a standard meaning within IFRS and, therefore, amounts pr esented may not be comparable to

similar data presented by other mining companies. These performance measures should not be

considered in isolation as a substitute for measures of performance in accordance with IFRS.

“Cash Costs ” and “Cash Costs (LOM)” are a non-IFRS measure reported by KORE on an ounces of gold sold

basis. Cash costs include mining, processing, refining, general and administration costs and royalties but

8

TSXV - KORE OTCQX - KOREF

excludes depreciation, reclamation, income taxes, capital and exploration costs for the life of the mine,

defined above as 7 years.

“All-In-Sustaining-Costs” (“ASIC”) is a non -IFRS measure reported by KORE on a per ounce of gold sold

basis that includes all cash costs noted above (mining, processing refining, general and administration and

royalties), as well as sustaining capital and closure costs , but excludes depreciation, capital costs and

income taxes.

ABOUT LONG VALLEY GOLD DEPOSIT

Long Valley is 100% owned epithermal gold project located in Mono County California. The Long Valley

deposit is an intact epithermal gold deposit with a large 2.5 by 2 kilometer oxide gold footprint.

The Long Valley deposit is an intact low sulphidation epithermal gold/silver deposit, hosted within a

melange of fine to coarse volcanogenic sedimentary lithologies. Mineralization at Long Valley has

developed due to a combination of deep -rooted fault structures and a resurgence of rhyolite within an

active caldera. The Hilton Creek Fault structure transects and served as a fluid conduit for interaction with

the underlying hydrothermal system, while the rhyolite resurgence caused brittle fracturing of sediments

and created voids or traps for mineralization and gold deposition. The combination of these factors yields

strongly altered kaolin and quartz-hematite zones that are the primary host for gold mineralization.

The Hilton Creek Fault remains underexplored on-strike north and south and several paralle l structures

have been defined using geophysics, the eastern one hosting some of the current mineral resource and

the western one being unexplored. Long Valley is therefore open to new oxide discoveries in all directions.

More details on the deposit geol ogy and exploration potential can be found in KORE’s January 30, 2020

and March 24, 2020 news releases.

ABOUT KORE

KORE is 100% owner of a portfolio of advanced gold exploration and development assets in California and

British Columbia. KORE is supported by strategic investor Eric Sprott who recently invested $7.0 million,

bringing his total ownership to 26%. KORE management and Board are aligned with shareholders, owning

and additional 38% of the basic shares outstanding. KORE is actively developing its Imperial Gold project

and is aggressively exploring across its portfolio of assets.

Further information on the Long Valley project and KORE can be found on the Company’s website at

www.koremining.com or by contacting us as [email protected] or by telephone at (888) 407-5450.

On behalf of KORE Mining Ltd

”Scott Trebilcock”

Chief Executive Officer

(888) 407-5450

Investor Relations

Arlen Hansen, KIN Communications

1-888-684-6730

[email protected]