KORE MINING ADVANCING EXPLORATION DRILL PERMITTING IN THE MESQUITE-IMPERIAL-PICACHO DISTRICT Mesquite East and Ogilby Prospect Cultural Surveys Underway

Exploration Programs

1

TSXV - KORE OTCQX - KOREF

KORE MINING ADVANCING EXPLORATION DRILL PERMITTING

IN THE MESQUITE-IMPERIAL-PICACHO DISTRICT

Mesquite East and Ogilby Prospect Cultural Surveys Underway

Vancouver, BC May 12, 2022 - KORE Mining Ltd. (TSXV: KORE | OTCQX: KOREF) (“ KORE” or the

“Company”) is pleased to announce the Mesquite East and Ogilby drill permitting process is advancing at

the Company’s 100% owned Imperial Oxide Gold Deposit (“Imperial” or “Project”), located in California,

USA. Mesquite East and Ogil by are two of the ten highly prospective drill targets identified in the

Mesquite-Imperial-Picacho District (“District”) that captures 28 kilometers (“km”) of prospective ground

from Equinox Gold’s (TSX: EQX) operating Mesquite gold mine (“Mesquite”) to the historic Picacho gold

mine (“Picacho”).

Highlights

• Mesquite East drilling targets geophysical anomalies east of the Mesquite mine

• Ogilby drilling targets soil and geophysical anomaly targets west of the main Imperial deposit

• Final environmental analysis and archeology surveys are underway and expected to be completed

in coming weeks

• Drill locations will be adjusted to avoid any sensitive areas identified in the resource surveys

• Next steps: move into public consultation and complete the Environmental Assessment (“ EA”)

under the National Environmental Protection Act (“NEPA”)

• KORE plans to initiate the drill program as soon as all permits are received

KORE’s CEO Scott Trebilcock stated: “After reconfiguring our drill plan of operations in October 2021, the

permitting process is once again moving ahead. The cultural survey is finally underway after having

completed the other surveys in 2021. Our drill locations are flexible to avoid any sensitive areas. KORE is

excited about the prospects of making a new discovery in the Mesquite-Imperial-Picacho District and can’t

wait to get drilling.”

KORE ‘s most recent map of prospects including Mesquite East and Ogilby was published on April 26, 2022

and is included here as Figure 1.

ABOUT IMPERIAL GOLD PROJECT

KORE owns 100% of the Mesquite-Imperial-Picacho District which consists approximately 31,000 acres of

claims capturing the entire 28 -kilometer trend from the operating Mesquite mine (Equinox Gold –

TSX:EQX) to the closed Picacho mine and including KORE’s Imperial project. In the District, gold is hosted

in local fault structures related to a series of regional faults connecting the known District deposits. Those

three District deposits (Mesquite, Imperial and Picacho) were discovered in exposed outcrops a nd from

placer workings. The rest of the District is covered by alluvium and has never been systematically

explored.

The Mesquite -Imperial-Picacho District centers on KORE’s Imperial project. Imperial is a structurally

controlled intermediate sulfidat ion epithermal gold deposit. The 100% oxide gold deposit is currently

2

TSXV - KORE OTCQB - KOREF

defined at 2.44 kilometer long and up to 0.75 kilometer wide and is open both along strike and downdip.

It is hosted in a shallowly southwest dipping, amphibolite grade metamorphic roc k suite along a west -

northwest trending low -angle regional thrust fault system which controls the regional geometry of

mineralization. East-west striking, post-mineralization normal faults control the property scale geometry

of mineralization. Geophysical characterization of the deposit and regional controlling structures is an

essential component of exploration for additional resources.

Imperial has a mineral resource estimate and a positive preliminary economic assessment effective April

6, 2020 with the following highlights:

• Robust economics: US$ 343 million NPV5% post-tax with 44% IRR at US$ 1,450 per ounce gold

• Low capital intensity project with only US$ 143 million pre-production capital cost

• Average 146,000 ounces gold per year over 8 years for 1.2 million ounces total production

• Technically simple project: shallow open pit, run-of-mine heap leach with existing infrastructure

• Value enhancement thro ugh Mesquite -Imperial-Picacho District exploration and resource

expansion

The Company’s NI 43-101 compliant resource and preliminary economic assessment is titled “Preliminary

Economic Assessment – Technical Report Imperial Gold Project” effective as of April 6, 2020 and revised

and amended on June 10, 2021, prepared by Terre Lane and Todd Harvey of Global Resource Engineering

and Glen Cole of SRK Consulting (Canada) Inc. can be found under the Company’s profile on SEDAR

(www.sedar.com) and on the Company’s website.

About KORE Mining

KORE Mining is focused on responsibly creating value from its portfolio of gold assets in California, USA.

The Company is advancing the Imperial project towards development while continuing to explore across

both district-scale gold assets. Ma nagement and Board, along with strategic investor, Eric Sprott (26%

owner), are aligned with all KORE shareholders with the goal of creating per share value.

Further information on Imperial and KORE can be found on the Company’s website at

www.koremining.com or by contacting us as [email protected] or by telephone at (888) 407-5450.

On behalf of KORE Mining Ltd

“Scott Trebilcock”

Chief Executive Officer

(888) 407-5450

Investor Relations

David Jan, Investor Relations

(888) 407-5450

[email protected]

Technical information with respect to the District and Imperial Gold Project contained in this news release

has been reviewed and approved by Marc Leduc, P.Eng., who is KORE's COO and is the qualified person

under National Instrument 43-101 responsible for the technical matters of this news release.

3

TSXV - KORE OTCQB - KOREF

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statement Regarding Forward-Looking Information

This news release contains forward-looking statements relating to the future operations of the Company

and other statements that are not historical facts . Forward-looking statements are often identified by

terms such as "will", "may", "should", "anticipate", "expects", “intends”, “indicates” and similar

expressions. All statements other than statements of historica l fact, included in this release, including,

without limitation, statements regarding the future plans and objectives of the Company are forward -

looking statements.

Forward‐looking statements in this news release include, but are not limited to, statements with respect

to: completion dates for surveys and analyses, timelines and process for obtaining drill permits , and

advancing the existing Imperial gold deposit toward feasibility and mine permitting; the timing of

submitting Environmental Assessment report(s); potential actions, behavior or position of the BLM; the

underexplored and prospective nature of the Imperial Regional Exploration Drilling area; the results of the

preliminary economic assessment for the Imperial Project, including future project opportunities, the

projected NPV, permit timelines, the current mineral resource estimate, and the ability to obtain the

requisite permits; the market and future price of and demand for gold; the opportunities of expansion at

the Imperial Project; and the ability to work cooperatively with stakeholders, including all levels of

government. Such forward‐looking statements, and any a ssumptions upon which they are based, are

made in good faith and reflect our current judgment regarding the direction of our business. In connection

with the forward‐looking information contained in this presentation, the Company has made numerous

assumptions, including, among others: there being no significant change to current geotechnical,

metallurgical, hydrological and other physical conditions at the Imperial Project; exploration, permitting,

and development of the Imperial Project being consistent w ith current expectations and planning; the

geological, permitting and economic advice that the Company has received is reliable and is based upon

practices and methodologies which are consistent with industry standards; and other planning

assumptions. While the Company considers these assumptions to be reasonable, these assumptions are

inherently subject to significant uncertainties and contingencies.

Forward looking information involves known and unknown risks, uncertainties and other factors which

may cause the actual results, performance or achievements of the Company to be materially different

from any future results, performance or achievements expressed or implied by the forward‐looking

information. Known risk factors include, among others: the outc ome of BLM’s review processes for

permitting, including the final outcome(s) of BLM’s mineral claim validity examination(s) and

administrative review process(es) with respect to the Imperial Zone, including a change to the findings

from the mineral claim v alidity examination conducted in 2002 for the mill sites at the Imperial Zone,

resulting in the Company having to move its future Imperial Zone project support facilities to areas that

are not within the Indian Pass mineral withdrawal area; the possibility that BLM may require and/or

conduct further mineral claim validity examinations with respect to the Imperial project, and the outcome

and final determination of such examination could, among other things, invalidate one or more mining

claims; the possibil ity that BLM or other governmental authority review of the Regional Exploration

4

TSXV - KORE OTCQB - KOREF

Drilling program, delays or changes the Company’s plan for Regional Exploration Drilling permitting, which

could result, among other things, in delays, additional project requi rements, additional costs and

uncertainty of meeting anticipated program milestones; the exploration drill program may not be

completed as planned; the need to obtain additional financing; uncertainty as to the availability and terms

of future financing; t he possibility of delay in exploration or development programs and uncertainty of

meeting anticipated program milestones; uncertainty as to timely availability of permits and other

government approvals.

Additional risks and uncertainties are described in the “Risks” sections of (i) the Company’s Annual

Information Form for the year ended December 31, 202 1 prepared as of April 29, 202 2, and (ii) the

Company’s Management’s Discussion and Analysis for the year ended December 31, 2021, both available

under the Company’s issuer profile on www.sedar.com.

Forward-looking statements contained herein are made as of the date of this news release and the

Company disclaims any obligation to update any forward-looking statements, whether as a result of new

information, future events or results, except as may be required by applicable securities laws. There can

be no assurance that forward-looking information will prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements. Accordingly, readers should not

place undue reliance on forward-looking information.

5

TSXV - KORE OTCQX - KOREF

FIGURE 1: Map of Mesquite-Imperial-Picacho District Prospects

Galaxy