Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KORE.V ·

Eureka Announces Drilling Program at Gold Creek

Exploration Programs

Eureka Announces Drilling Program at Gold Creek

Vancouver, British Columbia--(Newsfile Corp. - June 5, 2017) - Eureka Resources Inc. (TSXV: EUK) ("Eureka" or the "Company")

is pleased to announce that it has completed an initial diamond drill exploration program at its Gold Creek Property ("Gold Creek"

or the "Property") located in the Cariboo Mining District, near Likely, British Columbia.

Gold Creek was acquired by Eureka by way of an option agreement in November 2016.

The Property consists of 33 mineral

claims covering 9,673 hectares and is accessed via a well-maintained all-weather road.

The 2017 drilling program consisted of 3 holes totalling 331 metres and was focused on a gold-bearing zone containing

disseminated and high-grade vein-controlled gold mineralization. The gold is believed to be of orogenic nature and gold values are

contained in the same Mesozoic sedimentary package as at Spanish Mountain, and as at the Company's FG property 45 kms to

the southeast. Eureka's first drill program served as exploration and verification of the

work conducted in 2008 and 2011 and will

assist in designing future exploration programs in this area of the Property.

Drill locations located in and around Spanish Mountain Gold Ltd. (TSXV: SPA) core storage area.

Cannot view this image? Please visit:

http://orders.newsfilecorp.com/files/5130/27194_a1496635735534_31.jpg

Drilling was conducted in previously disturbed areas, thus mitigating environmental disturbance.

The program utilized a diamond

drill providing HQ diameter core to twin a historical RC drill hole which prematurely terminated in gold mineralization at 45.72

metres due to excessive water.

In 2011, the previous operator drilled hole GC11-27 which has been twinned as part of the current program.

From

(m)

To

(m)

I

nterval

(m)

Au g/t

GC11-27

3.1

44.2

41.2

0.893

incl.

3.1

32.0

29.0

1.093

incl.

10.7

12.2

1.5

13.400

Samples from Eureka's 3 hole drill program have been sent to ALS Laboratories in North Vancouver for analysis and results will be

released when received, compiled and interpreted.

Kristian Whitehead, the Company's VP Exploration stated, "Our initial drill program at Gold Creek was successful in reaching our

exploration goals.

We were able to effectively obtain important geological information, allowing us to build on previous work and to

effectively plan future programs in this area of the Property".

With the completion of this drilling program, Eureka has satisfied its work commitment required to earn a 100% interest in the Gold

Creek Property. Eureka will complete the earn-in by issuing 50,000 common shares on or before August 31, 2017 and an

additional 100,000 common shares on or before August 31, 2018. The vendor retains a 1% net smelter return royalty, half of which

can be acquired by Eureka for $1,000,000.

ABOUT EUREKA

Eureka is an exploration focused company based in Vancouver, British Columbia, whose strategy is to acquire projects in

prospective areas that have the potential to deliver important new discoveries and create value for its shareholders.

British Columbia, Canada

Eureka's 100% owned FG Gold property is an advanced-stage gold project located in the Cariboo Mining Division and currently

under option to Canarc Resources Corp (TSXV: CCM). Historical exploration has established a Measured and Indicated (376,000

ounces) gold resource at an average grade of 0.776 g/t gold, using a cut-off grade of 0.5 g/t, and an Inferred gold resource

(634,900 ounces) at an average grade of 0.718 g/t gold, using a cut-off grade of 0.5 g/t. Details of the gold resource can be found

in "NI 43-101 Technical Report, Frasergold Exploration Project, Cariboo Mining Division, dated July 27, 2015" available under the

Company's profile on SEDAR or on the Company's website.

Eureka has the option to earn a 100 percent interest in the Gold Creek property located in the Cariboo Mining Division.

Gold

Creek is a grassroots gold project neighbouring, and with similar geology to the Spanish Mountain deposit owned by Spanish

Mountain Gold Ltd. (TSXV: SPA).

Eureka has the option to earn a 100 percent interest in the CKN property located in the Cariboo Mining Division.

The CKN property

is adjacent to Taseko's Gibraltar mine and consists of two mineral claims covering 1,356 hectares.

Yukon Territory, Canada

Eureka's 100 percent owned Luxor property consists of three non-contiguous claim blocks totalling 360 mining claims.

Luxor is

located in the Dawson Range Gold Belt, a district of major porphyry, breccia and vein occurrences.

Eureka's 100 percent owned TAK property is also located in the Dawson Range Gold Belt and consists of 82 mining claims.

Neighbouring projects include Goldcorp's Coffee project and Kinross' Golden Saddle project.

Nevada, USA

Eureka owns a 50 percent interest in the Gemini lithium brine project located approximately 40 km (26 miles) south of North

America's only producing lithium mine at Silver Peak, Nevada.

Kristian Whitehead

,

P.G

eo

.,

the Company's designated Qualified Person for this news release within the meaning of NI

43-101

,

has reviewed and approved the technical information

contained

in this news release.

Further information on Eureka can be found on the Company's website at

www.eurekaresourcesinc.com

and at

www.sedar.com

, or

by contacting Michael Sweatman, President and CEO, by email at

[email protected]

or by telephone at (604) 449-

2273.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX

Venture Exchange) accepts responsibility for the adequacy of accuracy of this release.

Cautionary Statement Regarding

Adjacent Properties and

Forward-Looking Information

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation that are not

historical facts. Forward-looking statements involve risks, uncertainties, and other factors that could cause actual results,

performance, prospects, and opportunities to differ materially from those expressed or implied by such forward-looking

statements. Forward-looking statements in this news release include, but are not limited to, statements with respect to the

2017

Gold Creek drilling program

a

nd the business and operations of the Company. Forward-looking statements are necessarily

based on a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks,

uncertainties and other factors which may cause actual results and future events to differ materially from those expressed or

implied by such forward-looking statements. Such factors include, but

are not limited to:

complete exploration programs

,

general business, economic and social uncertainties; litigation, legislative, environmental and other judicial, regulatory, political

and competitive developments; delay or failure to receive board or regulatory approvals; those additional risks set out in the

Company's public documents filed on SEDAR at www.sedar.com; and other matters discussed in this news release. Although

the Company believes that the assumptions and factors used in preparing the forward-looking statements are reasonable,

undue reliance should not be placed on these statements, which only apply as of the date of this news release, and no

assurance can be given that such events will occur in the di

sclosed time frames or at all.

Except where required by law, the

Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new

information, future events, or otherwise.