Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KORE.V ·

Eureka Announces Airborne Geophysical Survey IN Yukon

Exploration Programs

1

TSXV – EUK

WKN: 875742

ISIN : CA2986551018

EUREKA ANNOUNCES AIRBORNE GEOPHYSICAL SURVEY IN YUKON

Vancouver, British Colu mbia, May 1, 2017 - Eureka Resources Inc. (“Eureka” or the

“Company”) is pleased to announce that it has entered into a contract with Geotech Ltd.

to conduct a helicopter-borne, VTEM time -domain system and magnetic geophysical

survey over the Company’s Luxor and TAK claims, located in the Yukon’s Dawson

Range Gold Belt.

The survey will consist of 1,152 line kilome tres and will be flown at 100 metre line

spacing. Data acquisition is expected to be completed by the last week of May 2017.

The data resulting from the survey will be used to guide and design future ground-based

exploration, which Eureka anticipates will be conducted later in the 2017 exploration

season.

Michael Sweatman, CEO of Eureka, stated: “We are pleased to get an early start on our

2017 exploration program in the Yukon, for what is bound to be an exciting new phase

in the Company’s development.”

ABOUT EUREKA

Eureka is an mineral expl oration company based in V ancouver, British Columbia,

whose strategy is to acquire projects in prospective areas that have the potential to

deliver important new discoveries to create value for its shareholders.

British Columbia, Canada

Eureka’s 100% owned FG Gold property is an advanced-stage gold project located in

the Cariboo Mining Division and currently under option to Canarc Resources Corp

(TSXV: CCM). Historical exploration has established a Measured and Indicated

(376,000 ounces) gold resource at an average grade of 0.776 g/t gold, using a cut-off

grade of 0.5 g/t, and an Inferred gold resource (634,900 ounces) at an average grade of

0.718 g/t gold, using a cut-off grade of 0.5 g/t. Details of the gold resource can be found

in “NI 43-101 Technical Report, Frasergold Exploration Project, Cariboo Mining Division,

dated July 27, 2015” availabl e under the Company’s prof ile on SEDAR or on the

Company’s website.

Eureka has the option to earn a 100% interest in the Gold Creek property located in the

Cariboo Mining Division. Gold Creek is a grassroots gold project neighbouring, and with

similar geology to the Spanis h Mountain deposit ow ned by Spanish Mountain Gold Ltd.

(TSXV: SPA).

2

Eureka has the option to earn a 100% intere st in the CKN property located in the

Cariboo Mining Division. The CKN property is adjacent to Taseko’s Gibraltar mine and

consists of two mineral claims covering 1,356 hectares.

Yukon Territory, Canada

Eureka’s 100% owned Luxor property consis ts of three non-contiguous claim blocks

totalling 360 mining claims. Luxor is located in the Dawson Range Gold Belt, a district

of major porphyry, breccia and vein occurrences.

Eureka’s 100% owned TAK property is also located in the Dawson Range Gold Belt and

consists of 82 mining claims.

Neighbouring projects include Goldcorp’s Coffee project and Kinross’ Golden Saddle

project.

Nevada, USA

Eureka owns a 50 percent interest in the Gemini lithium br ine project located

approximately 40 km (26 miles) south of North America’s only producing lithium mine at

Silver Peak, Nevada.

Further information on Eureka can be found on the Company ’s website at

www.eurekaresourcesinc.com and at www.sedar.com, or by contacting Michael

Sweatman, President and CEO, by email at [email protected] or by

telephone at (604) 449-2273.

John Kerr P. Eng. is the Company's d esignated Qualified Person for this news

release within the meaning of NI 43-101 and haves reviewed and approved the

technical information described in this news release

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of TSX Venture Exchange) accepts responsibility for the adequacy of accuracy of this

release.

Cautionary Statement Regarding Adjacent Properties and Forward-Looking Information

This news release includes certain “forward-looking statements” under applicable Canadian securities legislation that are not

historical facts. Forward-looking statements involve risks, unc ertainties, and other factors that could cause actual results,

performance, prospects, and opportunities to differ materially from those expressed or implied by such forward-looking

statements. Forward-looking statements in this news release include, but are not limited to, statements with respect to the

exploration activities planned for 2017 and the business and op erations of the Company. Forward-looking statements are

necessarily based on a number of estimate s and assumptions that, while considered reasonable, are subject to known and

unknown risks, uncertainties an d other factors which may cause actual results and future events to differ materially from

those expressed or implied by such forward-looking statemen ts. Such factors include, but are not limited to: general

business, economic and social uncertainties; litigation, legislat ive, environmental and other ju dicial, regulatory, political and

competitive developments; delay or failure to receive board or regulatory approvals; delays experiences in carrying out

planned exploration; those additional risks set out in the Company’s public documents filed on SEDAR at www.sedar.com;

and other matters discussed in this news release. Although the Company believes that the assumptions and factors used in

3

preparing the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which

only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed

time frames or at all. Except where required by law, the Co mpany disclaims any intention or obligation to update or revise

any forward-looking statement, whether as a result of new information, future events, or otherwise.