Highlights include:

• Drill intercept of 6.49 m at 23.66 g/t Au, 27 g/t Ag and 0.16% Cu (24.24 g/t AuEq)

• Face sampling taken while mining the K1 Kora vein reports value s of 0.6 m @ 1,126

g/t Au in one face and 0.3 m @ 2,171 g/t Au in another face

• Process plant feed grade in excess of 40 g/t Au over consecutive days, including a peak

of 82.98 g/t Au over a 12 hour period.

K92 (TSXV - KNT) is pleased to provide an update on operations at its Kainantu Gold Mine in

Papua New Guinea.

Mining operations are currently focused on mining from stopes 1 185 K2 0N and 1185 K2 0S as

well as from the development on 1185 K1 North and South from the second cross cut. All material

from the first cut on the stopes was extracted during the month , filling of 1185 K2 0N was

completed and drilling and blasting of the second cut commenced . Filling of 1185K2 0S has also

commenced. The second Kora North K1 vein has been mined for a strike extent of over 100 metres

and has averaged approximately 20 g/t. The 1185 K1 North in par ticular has returned some

extremely high grades including 0.3 m @ 2,171.8 g/t Au in one f ace and 0.6 me @ 1,126 g/t Au

in another face. The results from 10 faces are provided in Tabl e 3 below with the highest uncut

face value reported being 157.2 g/t Au and 0.96% Cu over 3.45 m width and the lowest being

12.42 g/t Au and 3.3% Cu over 3.15 m width. This high grade zone is still being mined so it’s full

extent along strike and vertically has yet to be determined.

Table 1 1185 K1 North Developme nt Face Sampling Results

Width

Metres

Uncut

Au g/t

Au Cut 60 g/t

Au g/t Cu % Comments

3.2 131.63 27.33 1.55 Includes 0.3m at 2,171.8 g/t Au

3 21.13 16.34 1.51

3.25 40.28 18.77 1.24

3 28.32 17.47 1.02

3.45 157.2 23.82 0.96 Incorporates the 1,126 g/t Au

3.15 12.42 12.08 3.3

3.03 68.04 25.83 1.9

3 69.94 27 0.92

3.1 24.61 19.73 1.6

2.75 43.4 28.29 0.9

Face sampling is carried out on every face and involves sampling two lines across the entire face

approximately one metre apart with between 4 and 8 samples taken per line after geological

interpretation.

Mining from Irumafimpa is also continuing, with operations focu sed on the 1235 S stope which

was partially drilled out and fired during the month.

The high grade material mined from the 1185 K1 South was blende d with lower grade material

from 1185 K1 South and the 1185 K2 0S stope, however despite this the plant reported daily feed

grades in excess of 40 g/t Au on a number of days, with a peak of 82.15 g/t Au reported over a 12

hour period. The plant throughput has been reduced to maximise recovery when treating these very

high grades.

Additional to mining, grade control drilling from the first dri ll cuddy, DDC1 is now complete,

with drilling from the second drill cuddy, DDC2 located 125 metres to the south, ongoing. Drilling

from a third cuddy, located 200 metres to the north of DDC1, has also commenced.

The latest results from DDC2 from hole KMDD0047 which include 3 .85 m at 2.83 g/t Au, 6 g/t

Ag and 1.01% Cu (4.46 g/t AuEq) plus 6.49 m at 23.66 g/t Au, 27 g/t Ag and 0.16% Cu (24.24 g/t

AuEq) plus 2.10 m at 9.42 g/t Au, 24 g/t Ag and 3.47 % Cu (15.0 44.46 g/t AuEq) plus 4.10 m at

2.36 g/t Au, 48 g/t Ag and 1.09 % Cu (4.64 g/t AuEq) confirm th e continuity of both the K1 and

K2 veins to the south over a strike length of almost 300 metres . The results from this hole have

also confirmed the continuity of a high grade third vein designated KL1 running between K1 and

K2. The intersection of one of the Kora lodes in KMDD0050, is considered important as it extends

the known Kora Vein system north to beyond 59375N.

Tables 2 and 3 below provide a summary of the results from the latest diamond grade control drill

holes drilled into the Kora North Vein system. Table 2 provides a summary of the significant

intercepts from the hole, while Table 3 provides details of collar location and hole orientation.

Table 2.0 Significant Intercepts from Kora Underground Diamond Drilling

Hole_id From (m) To (m) Interval

(m)

True

width (m) Gold g/t Silver g/t Copper % Gold

equivalent

KMDD0045 65.64 69.3 3.66 2.97 0.91 4 0.29 1.40

Including 65.64 66.35 0.71 0.58 1.05 1 0.40 1.68

Including 66.35 67.25 0.90 0.73 0.38 1 0.29 0.84

Including 67.25 68.05 0.80 0.65 0.56 1 0.04 0.63

Including 68.05 68.80 0.75 0.61 2.25 15 0.57 3.31

Including 68.80 69.30 0.50 0.41 0.2 1 0.15 0.44

KMDD0045 99 100 1.00 0.81 1.56 30 1.19 3.77

Including 99.00 99.45 0.45 0.37 3.09 60 2.42 7.57

Including 99.45 100.00 0.55 0.45 0.31 6 0.18 0.66

KMDD0046A 17.07 18.12 1.05 0.66 3.16 3 0.01 3.22

KMDD0046A 20.13 24.1 3.97 2.49 1.68 3 0.47 2.44

Including 20.13 21.07 0.94 0.59 0.69 1 0.05 0.78

Including 21.07 22.02 0.95 0.60 0.70 1 0.00 0.72

Including 22.02 22.24 0.22 0.14 0.63 1 0.01 0.66

Including 22.38 22.95 0.57 0.36 2.73 1 0.10 2.90

Including 22.95 24.10 1.15 0.72 3.17 11 1.53 5.65

KMDD0047 40.5 44.35 3.85 2.18 2.83 6 1.01 4.46

Including 40.5 41.1 0.6 0.34 12.19 16 2.36 16.01

Including 41.1 41.9 0.8 0.45 1.26 5 1.15 3.08

Including 41.9 42.9 1 0.57 0.18 2 0.3 0.67

Including 42.9 43.7 0.8 0.45 2.37 5 0.8 3.66

Including 43.7 44.35 0.65 0.37 0.77 4 0.98 2.32

KMDD0047 48.16 54.65 6.49 4.43 23.66 27 0.16 24.25

Including 48.16 49.11 0.95 0.65 44.01 9 0.19 44.42

Including 49.11 49.6 0.49 0.33 20.92 13 0.23 21.44

Including 49.6 50.2 0.6 0.41 44.84 3 0.07 44.99

Including 50.2 50.5 0.3 0.20 34.11 8 0.1 34.37

Including 50.5 50.8 0.3 0.20 11.07 4 0.04 11.18

Including 50.8 51.7 0.9 0.61 44.07 162 0.34 46.70

Including 51.7 52.9 1.2 0.82 6.43 2 0.06 6.55

Including 52.9 54 1.1 0.75 7.37 2 0.06 7.49

Including 54 54.65 0.65 0.44 8.49 6 0.31 9.04

KMDD0047 57.8 58 0.20 0.11 1.46 15 1.54 4.00

KMDD0047 83.5 85.6 2.10 1.69 9.42 24 3.47 15.05

Including 83.5 84.85 1.35 1.09 13.27 34.5 4.96 21.31

Including 84.85 85.1 0.25 0.20 1 4.6 0.56 1.92

Including 85.1 85.6 0.5 0.40 3.25 7.4 0.9 4.72

Hole_id From (m) To (m) Interval

(m)

True

width (m) Gold g/t Silver g/t Copper % Gold

equivalent

KMDD0047 110.6 114.7 4.10 3.30 2.36 48 1.09 4.66

including 110.6 110.85 0.25 0.20 1.04 9.2 0.05 1.24

including 110.85 111.4 0.55 0.44 2.49 10.9 0.14 2.85

including 111.4 112.2 0.8 0.64 3.01 25.3 0.16 3.58

including 112.2 112.6 0.4 0.32 4.45 162.6 2.87 10.95

including 112.6 113.2 0.6 0.48 0.73 18.8 0.21 1.30

including 113.2 113.7 0.5 0.40 3.02 37.6 1.06 5.13

including 113.7 114.7 1 0.80 1.93 75.1 2.44 6.64

KMDD0047 115.7 116.4 0.70 0.56 1.44 52 0.60 3.04

KMDD0047 117.7 118.3 0.60 0.48 1.05 6 0.03 1.18

KMDD0048 14.9 21.5 5.20 3.17 4.03 2 0.02 4.08

including 16.30 16.55 0.25 0.15 12.89 3 0.06 13.02

including 16.55 17.7 1.15 0.69 0.2 1 0.01 0.23

including 17.7 18.4 0.70 0.42 0.41 1 0.01 0.44

including 18.40 19.50 1.10 0.68 3.12 4 0.03 3.21

including 19.50 21.50 2.00 1.23 6.90 1 0.01 6.93

KMDD0048 83.9 86.4 2.50 1.20 2.70 52 3.06 8.05

including 83.90 84.27 0.37 0.18 7.90 34 4.95 15.92

including 84.27 85.00 0.73 0.35 0.21 4 0.15 0.50

including 85.00 86.40 1.40 0.67 2.62 81 4.08 9.92

KMDD0050 19.75 22.15 2.40 4.88 2.74 1 0.23 3.12

including 19.75 21.40 1.65 1.61 3.89 2 0.10 4.07

including 21.40 21.85 0.45 0.44 0.24 1 0.06 0.34

including 21.85 22.15 0.30 0.29 16.20 3 0.67 17.27

KMDD0050 24.00 24.76 0.76 0.74 1.99 3 0.07 2.14

KMDD0050 28.55 29 0.45 0.44 0.39 9 3.04 5.15

KMDD0050 32.3 32.55 0.25 0.24 4.49 6 2.48 8.37

KMDD0050 73.4 75.2 1.80 1.75 3.50 7 0.15 3.82

including 73.4 74.4 1.00 0.97 1.64 7 0.04 1.79

including 74.4 74.9 0.50 0.49 8.40 11 0.46 9.24

including 74.9 75.2 0.30 0.29 1.52 3 0.02 1.58

Notes

Gold Equivalent uses Copper price – US$2.90/lb; Silver price US$16.5/oz and Gold price of US$1300/oz

Table 3.0 Collar Locations for Kora Underground Diamond Drilling

Hole_id Collar location Collar orientation

Local

north

Local

East mRL Dip Local

azimuth

KMDD0045 59006.42 29876.09 1190.49 25.4 314.5

KMDD0046A 59123.71 29876.79 1187.25 -29.9 227.7

KMDD0047 59000.62 29876.01 1188.28 -12.3 223.6

KMDD0048 59128.02 29876.55 1187.41 -28.4 313.0

KMDD0050 59361.95 29897.80 1206.41 -6.4 281.7

John Lewins, K92 Chief Executive Officer and Director, states, “The results from our mining,

development and grade control drilling at Kora North over the last month have been outstanding

and continue to build our knowledge of the deposit and it’s potential. The grades currently being

mined from the 1185 K1 South vein are the highest that have ever been achieved from the Kainantu

Mine and further reinforces the c onfidence in our strategy of focusing on the development of the

Kora deposit”.

K92 has filed and made available for download on the company's SEDAR profile a technical report

titled "Independent Technical Re port, Mineral Resource Update a nd Preliminary Economic

Assessment of Irumafimpa and Kora Gold Deposits, Kainantu Project, Papua New Guinea," with

an effective date of March 2, 2017, that provides additional in formation on the geology of the

deposits, drilling and sampling procedures, lab analysis, and quality assurance/quality control for

the project, and additional details on resource estimates.

The PEA is preliminary in nature and includes inferred mineral resources that are considered too

speculative geologically to have the economic considerations ap plied to them that would enable

them to be categorized as mineral reserves, and there is no certainty that the PEA will be realized.

The technical report contains a full description of all underlying assumptions relating to the PEA.

Mineral resources that are not mineral reserves and do not have demonstrated economic viability.

K92 Mine Geology Manager and Mine Exploration Manager, Mr Andre w Kohler, PGeo, a

qualified person under the meaning of Canadian National Instrument 43-101, has reviewed and is

responsible for the technical content of this news release. Data verification by Mr. Kohler includes

significant time onsite reviewing drill core, face sampling, un derground workings and discussing

work programs and results with geology and mining personnel.

On behalf of the company,

John Lewins

Chief Executive Officer and Director

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: Thi s

news release includes certain “forward-looking statements” under applicable Canadian securities

legislation. Forward-looking stat ements are necessarily based u pon a number of estimates and

assumptions that, while consider ed reasonable, are subject to k nown and unknown risks,

uncertainties, and other factors which may cause the actual res ults and future events to differ

materially from those expressed or implied by such forward-look ing statements. All statements

that address future plans, activities, events or developments that the Company believes, expects or

anticipates will or may occur are forward-looking information, including statements regarding the

realization of the preliminary economic analysis for the Project, expectations of future cash flows,

the proposed plant expansion, pote ntial expansion of resources and the generation of further

drilling results which may or may not occur. Forward-looking st atements and information

contained herein are based on certain factors and assumptions r egarding, among other things, the

market price of the Company’s securities, metal prices, exchang e rates, taxation, the estimation,

timing and amount of future exploration and development, capita l and operating costs, the

availability of financing, the r eceipt of regulatory approvals, environmental risks, title disputes,

failure of plant, equipment or processes to operate as anticipated, accidents, labour disputes, claims

and limitations on insurance coverage and other risks of the mi ning industry, changes in national

and local government regulation of mining operations, and regul ations and other matters.. There

can be no assurance that such statements will prove to be accur ate, as actual results and future

events could differ materially from those anticipated in such s tatements. Accordingly, readers

should not place undue r eliance on forward-looking statements. The Company disclaims any

intention or obligation to update or revise any forward-looking statements, whether as a result of

new information, future events or otherwise, except as required by law.