K92 MINING ANNOUNCES MAJOR REGIONAL EXPLORATION UPDATE: SIGNIFICANT
EXPANSION OF ARAKOMPA DEPOSIT, DISCOVERY OF PORPHYRY-STYLE
MINERALIZATION FROM ARAKOMPA SOUTHERNMOST STEP-OUT, AND SUBSTANTIAL
3.5 KM BY 3.5 KM NEW MINERALIZED SYSTEM DISCOVERED AT WERA
Vancouver, British Columbia, September 11, 2025 - K92 Mining Inc . (“K92” or the “ Company”)
(TSX: KNT; OTCQX: KNTNF) is pleased to announce its fifth set of drilling results consisting of 24
holes for total results of 67 holes released to date from its maiden surface diamond drill program at
Arakompa, located approximately 4.5 km from the Kainantu Gold Mine Process Plant in Papua New
Guinea. Additionally, K92 is pleased to report initial results from its maiden greenfields exploration
program at the Wera prospect, outlining a large 3.5 km by 3.5 km mineralized system located
approximately 10 km South-West of the Kora and Judd deposits.
Drillhole KARDD0065, stepping out approximately 250 metres to the south from the latest
results at Arakompa, has discovered significant porphyry-style mineralization recording 690.4
metres at 0.30% Copper Equivalent (“CuEq”) (2) (0.17 g/t Au, 0.17% Cu, 2 g/t Ag) starting at
297.0 metres, including 395.3 metres at 0.38% CuEq (0.24 g/t Au, 0.20% Cu, 2 g/t Ag) starting
at 349.7 metres. The hole was designed with two objectives: (i) to test the strike extension at
Arakompa; and (ii) to be the first hole drilled to test a 600 metre by 600 metre copper-in-soil
anomaly. Intersected mineralization occurred as disseminated sulphides, with vein-hosted and
vein-controlled sulphide mineralization present. The sulphide mineralization is dominantly
chalcopyrite, with minor bornite and molybdenite also observed. Porphyry-style B, D, and M-
type quartz sulphide veins are also present. The intersection is interpreted to be distal to a
porphyry potassic core, bottomed in mineralization, and represents a very significant vector for
follow-up drilling, which is underway.
Significant extension of the Arakompa bulk tonnage zone strike extent to the north and the
south, with the bulk zone now defined over approximately 1,100 metres and to a vertical depth
of 800 metres, increasing 200 metres strike and 150 metres depth from the February 20, 2025
press release, respectively. Drill results to date have recorded an average true thickness of 39
metres, highlighting strong, near-surface bulk mining potential (see Figure 5 – Arakompa Bulk
Interpretation Long Section). The interpreted bulk zone consists of a thick, intensely altered
mineralized halo surrounding the high-grade vein lodes and it remains open in multiple
directions.
2
Latest drilling highlights include:
KARDD0061: 96.10 m at 2.64 g/t AuEq (2.48 g/t Au, 4 g/t Ag, 0.07% Cu)
KARDD0046: 62.20 m at 1.08 g/t AuEq (0.87 g/t Au, 5 g/t Ag, 0.10% Cu)
KARDD0067: 48.30 m at 1.34 g/t AuEq (0.80 g/t Au, 5 g/t Ag, 0.30% Cu)
KARDD0052: 75.40 m at 1.04 g/t AuEq (0.58 g/t Au, 5 g/t Ag, 0.25% Cu)
KARDD0041: 32.50 m at 1.73 g/t AuEq (1.06 g/t Au, 43 g/t Ag, 0.11% Cu)
KARDD0056 (~100 m northern step-out along strike): 72.10 m at 1.00 g/t AuEq (0.80 g/t Au,
10 g/t Ag, 0.05% Cu)
KARDD0065 (~250 m southern step-out along strike): 49.20 m at 1.15 g/t AuEq (0.82 g/t
Au, 4 g/t Ag, 0.18% Cu)
The latest drilling results have enabled the reinterpretation of multiple historic drill holes,
enhancing our confidence in the continuity of the bulk zone. Reinterpreted historic bulk
intercepts include:
004AD92: 55.50 m at 2.57 g/t AuEq (2.43 g/t Au, 3 g/t Ag, 0.07% Cu)
016AD92: 37.20 m at 3.56 g/t AuEq (3.00 g/t Au, 9 g/t Ag, 0.29% Cu)
010AD92: 38.00 m at 2.83 g/t AuEq (2.66 g/t Au, 3 g/t Ag, 0.08% Cu)
014AD92: 36.00 m at 2.76 g/t AuEq (2.61 g/t Au, 7 g/t Ag, 0.04% Cu)
005AD92: 41.90 m at 2.20 g/t AuEq (2.12 g/t Au, 2 g/t Ag, 0.04% Cu)
013AD92: 24.00 m at 3.65 g/t AuEq (3.53 g/t Au, 3 g/t Ag, 0.06% Cu)
001AD92: 36.80 m at 2.38 g/t AuEq (2.31 g/t Au, 2 g/t Ag, 0.03% Cu)
Significant expansion of potential high-grade thick zone by ~100 metres vertical (see Figure 2
Long Section), with the latest intercept recording:
KARDD0061: 7.06 m at 27.92 g/t AuEq (27.48 g/t Au, 18 g/t Ag, 0.15% Cu), including 2.60 m
at 65.50 g/t AuEq (64.60 g/t Au, 42 g/t Ag, 0.27% Cu)
When combined with the three intersections previously reported and shown below, the zone
has a substantial average true thickness of 7.3 metres with a vertical extent of 200 metres.
Intersections from previous releases include:
KARDD0038: 14.50 m at 17.33 g/t AuEq (17.17 g/t Au, 4 g/t Ag, 0.07% Cu),
including 6.90 m at 34.99 g/t AuEq (34.73 g/t Au, 7 g/t Ag, 0.11% Cu)
KARDD0029: 20.60 m at 9.87 g/t AuEq (8.90 g/t Au, 29 g/t Ag, 0.38% Cu),
including 10.70 m at 14.97 g/t AuEq (13.81 g/t Au, 25 g/t Ag, 0.53% Cu)
KARDD0025: 12.00 m at 11.16 g/t AuEq (10.49 g/t Au, 11 g/t Ag, 0.33% Cu)
Multiple other high-grade intersections recorded at both the AR1 Vein and AR2 Vein, including:
o AR1 Vein:
KARDD0041: 8.00 m at 5.65 g/t AuEq (3.28 g/t Au, 170 g/t Ag, 0.25% Cu)
KARDD0052: 2.20 m at 8.12 g/t AuEq (4.71 g/t Au, 51 g/t Ag, 1.81% Cu) within
6.60 m at 3.66 g/t AuEq (2.31 g/t Au, 19 g/t Ag, 0.72% Cu)
o AR2 Vein:
KARDD0048: 1.60 m at 11.24 g/t AuEq (11.15 g/t Au, 2 g/t Ag, 0.04% Cu)
KARDD0054: 1.20 m at 10.21 g/t AuEq (9.85 g/t Au, 8 g/t Ag, 0.17% Cu) within
6.40 m at 2.42 g/t AuEq (2.21 g/t Au, 4 g/t Ag, 0.10% Cu)
3
KARDD0056: 7.70 m at 6.02 g/t AuEq (5.25 g/t Au, 61 g/t Ag, 0.04% Cu), including
1.50 m at 24.90 g/t AuEq (22.29 g/t Au, 224 g/t Ag, 0.01% Cu)
Maiden greenfields exploration program initially focused on rock chips and trenching at Wera
has defined a large ~3.5 kilometre by ~3.5 kilometre low-sulphidation epithermal gold system
located approximately 10 km south-west of the Kora and Judd deposits, with several interpreted
mineralized structures and high-grade rock chip samples including 26.30 g/t Au, 25.06 g/t Au,
23.97 g/t Au, 22.06 g/t Au, 19.69 g/t Au, 19.23 g/t Au, 18.40 g/t Au, 18.40 g/t Au, 18.03 g/t Au,
16.05 g/t Au, 13.83 g/t Au, 11.09 g/t Au, 10.88 g/t Au, and 10.21 g/t Au (See Figure 8 Wera Plan
Map). Importantly, this area was not accessed or tested by previous owners and lies within the
major NNE regional mineralized structural corridor that hosts the Kora, Judd and Arakompa
deposits. Drilling is now underway.
Notes:
(1) Drill highlights presented above are core lengths (not true widths).
(2) Gold equivalent (AuEq) and Copper Equivalent (CuEq) exploration results are calculated using
longer-term commodity prices with a copper price of US$4.50/lb, a silver price of US$27.5/oz
and a gold price of US$2,000/oz. For AuEq, the following recoveries were applied in-line with
the Updated Definitive Feasibility Study: Au – 92.6%, Cu – 94.0%, and; Ag – 78.0%. For CuEq,
Metallurgical recoveries and net smelter returns are not considered.
John Lewins, K92 Chief Executive Officer and Director, stated, “We are extremely pleased with the
progress achieved through our latest regional exploration results, delivering multiple high-grade
intersections at Arakompa, significantly expanding the bulk zone, and on the first deep drill hole
discovering a potential porphyry within a 600 m x 600 m copper-in-soils anomaly. The large 3.5 km x 3.5
km mineralized system discovered from our maiden greenfields fieldwork at Wera has also created yet
another sizeable target-rich area to explore, and it’s only 10 km from Kora.
These new discoveries align well with the arrival of two new surface diamond drill rigs scheduled for late-
Q4/early-Q1 2026 delivery. The additional drilling capacity will support our strategy to significantly
ramp up exploration over the next two years and potentially beyond. A second hole targeting the potential
porphyry is now underway, and in addition, a contractor rig has been brought in to expand our fleet and
has already commenced drilling at Wera. We look forward to providing updates in due course.”
Robert Smillie, K92 Vice President of Exploration, stated, “ We are very excited by the continued
exploration success at Arakompa as we advance towards a maiden mineral resource. Drilling so far has
only tested just over half of the +2 km strike length of the Arakompa corridor and we are very encouraged
by the porphyry potential to the south from the latest drill results from hole KARDD0065. Follow-up
drilling to the south of KARDD0065 is underway, which is designed to vector towards a potential higher
grade potassic core of the system.
Furthermore, we are beginning to drill test the large newly discovered mineralized vein system identified
at Wera following the high-grade rock chip and trench samples, which is open along strike in both
directions. We are excited by the potential of this new greenfields discovery by the K92 Exploration Team
4
supported by the demonstrated regional prospectivity of the mineralized corridor which also hosts the
Kora, Judd and Arakompa deposits.”
Arakompa Vein System Background
The Arakompa project is interpreted to be an intrusive related gold-copper-silver epithermal vein system
with similarities to the producing Kora and Judd vein systems. A significant difference at Arakompa is
that it is hosted in tonalite to dioritic rock, whereas Kora and Judd are hosted predominantly in
metasediments (phyllite).
Mineralization at Arakompa is in pronounced vein lodes but is also widespread across a very broad
envelope, hosted in strongly altered tonalite and diorite. This has been interpreted to have resulted from
collapsing argillic and advanced argillic alteration, and the propylitic alteration of the basement tonalite
are interpreted to originate from the intrusion of a large magmatic porphyry body. Phyllic alteration
appears to be associated with gold mineralization, providing a large halo (at least 100 m wide) around the
vein corridor. There has likely been an upwelling of phyllic alteration from the porphyry into the high-
grade veins. This has resulted in mineralization between the veins, providing the potential for bulk mining.
Multi-stage mineralizing events with several phases of quartz-sulphide development are apparent within
the veins themselves. The sequence of early quartz deposited from a mesothermal dilute fluid followed by
pyrite-copper-gold ± Bi-Te-Pb-Zn-Sn mineralization at Arakompa has many similarities to the same
events encountered at Kora and Judd.
The main sulphides are pyrite, chalcopyrite, bornite and bismuthinite. As at Kora, chalcopyrite forms late,
overprinting early phases of pyrite. Gold is documented in petrological reports and shown in
photomicrographs as occurring in quartz, or often as inclusions overgrown by chalcopyrite.
Porphyry evidence is widespread at Arakompa. Localized, high-level B veins (quartz with centerline
pyrite) are present, typical of the upper parts of a porphyry system. Magnetite-epidote alteration represents
classic prograde porphyry assemblages, indicative of the inner propylitic shell. Chalcocite is also locally
present, suggesting an underlying copper-enriched body.
Surface field work completed historically and by K92 has demonstrated that the target size of Arakompa
is significant, with mineralization observed from drill holes, rock samples and surface workings for at
least 2.0 km of strike, hosted within an approximately 400 metre wide mineralized intense phyllic altered
package, and a vertical extent of over 800 metres.
Wera Vein System Background
The Wera Project is interpreted as a gold-bearing, low-sulphidation epithermal system hosted within
diorite-tonalite intrusives. It is accessible by road and located approximately 10 kilometres southwest of
Kora.
5
K92 Mining identified Wera as a target area following results from a Mobile MT survey and a review of
historic exploration data. Field programs commenced in July 2024 and have included geological mapping,
rock chip sampling, soil sampling, and trenching.
Mineralization at Wera occurs within quartz veins exhibiting classic low-sulphidation epithermal textures.
Alteration is largely restricted to narrow halos around the veins, dominated by phyllic and silica
assemblages. Rock chip, soil, and trench samples have returned anomalous levels of arsenic, antimony,
thallium, molybdenum, and tungsten, pathfinder elements typically found near the upper levels of low-
sulphidation systems.
A scout diamond drilling program is currently underway. This marks the first major drill campaign at
Wera, designed to test the interpreted vein system near surface and provide critical information to guide
subsequent, deeper drilling.
Figures
A plan map for Arakompa is provided in Figure 1.
A cross section showing KARDD0025, KARDD0029, KARDD0038 and KARDD0061 at Arakompa is
provided in Figure 2.
A cross section showing KARDD0056 and KARDD0059 at Arakompa is provided in Figure 3.
A cross section showing KARDD0030, KARDD0033, KARDD0048 and KARDD0067 at Arakompa is
provided in Figure 4.
A long section showing Arakompa bulk intercepts and gram metre contours is provided in Figure 5.
Long sections of AR1 and AR2 Veins showing the location of the latest drill holes are provided in
Figures 6 and 7, respectively.
A plan map for Wera showing rock chip samples is provided in Figure 8.
A regional location map is provided in Figure 9.
Core photograph of drill hole KARDD0061 is provided in Figure 10.
Photograph of Wera rock chip samples is provided in Figure 11.
Table 1
Significant Intercepts from Arakompa Diamond Drilling
Hole ID From
(m)
To
(m)
Interval
(m)
True width
(m)
Gold
g/t
Silver
g/t
Copper
% Gold Eq Vein
KARDD0041 407.50 440.00 32.50 19.50 1.06 43 0.11 1.73 Bulk Intersection
KARDD0041 373.00 374.60 1.60 0.96 4.77 4 0.05 4.89 AR2
KARDD0041 407.50 415.50 8.00 4.80 3.28 170 0.25 5.65 AR1
including 407.50 411.00 3.50 2.10 5.74 385 0.51 10.99 AR1
6
Hole ID From
(m)
To
(m)
Interval
(m)
True width
(m)
Gold
g/t
Silver
g/t
Copper
% Gold Eq Vein
KARDD0041 519.30 521.60 2.30 1.38 1.68 15 1.00 3.42
KARDD0045 462.10 475.40 13.30 9.71 0.84 4 0.10 1.03 Bulk Intersection
KARDD0045 470.50 474.15 3.65 2.66 2.31 8 0.16 2.65 AR1
KARDD0046 329.40 391.60 62.20 49.76 0.87 5 0.10 1.08 Bulk Intersection
KARDD0046 332.80 338.30 5.50 4.40 2.88 5 0.15 3.17 AR1
KARDD0046 346.00 348.60 2.60 2.08 2.56 16 0.59 3.66
KARDD0046 369.50 375.60 6.10 4.88 2.12 3 0.09 2.29
KARDD0047 123.90 185.90 62.00 42.78 0.19 13 0.02 0.37 Bulk Intersection
KARDD0047 294.20 319.60 25.40 17.53 1.23 8 0.13 1.52 Bulk Intersection
KARDD0047 154.80 155.80 1.00 0.69 0.09 540 0.25 6.73 AR1
KARDD0047 307.60 311.40 3.80 2.62 6.38 44 0.61 7.84
KARDD0048 378.00 423.42 45.42 32.25 0.99 1 0.03 1.05 Bulk Intersection
KARDD0048 215.10 216.30 1.20 0.85 11.80 3 0.00 11.84
KARDD0048 234.20 235.10 0.90 0.64 13.65 3 0.01 13.70
KARDD0048 393.70 395.30 1.60 1.14 11.15 2 0.04 11.24 AR2
KARDD0048 413.00 417.80 4.80 3.41 3.11 1 0.06 3.22 AR1
KARDD0049 320.60 351.80 31.20 22.15 1.17 3 0.11 1.38 Bulk Intersection
KARDD0049 334.00 342.50 8.50 6.04 1.13 6 0.23 1.55
KARDD0049 345.10 351.80 6.70 4.76 3.35 2 0.11 3.55 AR1
including 345.10 346.20 1.10 0.78 14.45 6 0.19 14.80 AR1
KARDD0050 612.00 637.30 25.30 18.98 0.61 5 0.21 1.00 Bulk Intersection
KARDD0050 93.70 98.70 5.00 3.75 1.17 11 0.11 1.48
KARDD0050 290.10 297.30 7.20 5.40 0.41 14 0.20 0.88
KARDD0050 351.70 358.00 6.30 4.73 1.26 6 0.05 1.40
KARDD0050 409.10 410.20 1.10 0.82 2.94 1 0.02 2.97
KARDD0050 466.00 467.40 1.40 1.05 2.69 21 0.21 3.26
KARDD0050 530.10 537.40 7.30 5.47 0.98 6 0.14 1.27 AR2
KARDD0050 580.00 586.10 6.10 4.58 1.11 5 0.32 1.68 AR1
KARDD0050 622.00 626.20 4.20 3.15 1.12 9 0.35 1.76
KARDD0050 633.00 634.40 1.40 1.05 3.11 28 1.06 5.10
KARDD0051 394.30 409.20 14.90 11.18 0.59 5 0.23 1.01 Bulk Intersection
KARDD0051 388.40 389.20 0.80 0.60 0.79 6 0.44 1.55
KARDD0051 395.30 398.10 2.80 2.10 1.48 6 0.52 2.37 AR2
KARDD0051 403.20 408.00 4.80 3.60 0.68 10 0.34 1.33
KARDD0051 501.20 501.70 0.50 0.38 2.39 6 0.01 2.47
KARDD0051 509.70 510.70 1.00 0.75 2.82 45 0.83 4.65
KARDD0051 524.00 525.10 1.10 0.83 2.34 29 0.33 3.20
KARDD0052 533.00 608.40 75.40 45.24 0.58 5 0.25 1.04 Bulk Intersection
KARDD0052 111.10 112.20 1.10 0.66 2.37 22 0.17 2.88
KARDD0052 372.00 375.00 3.00 1.80 0.91 17 0.22 1.45
7
Hole ID From
(m)
To
(m)
Interval
(m)
True width
(m)
Gold
g/t
Silver
g/t
Copper
% Gold Eq Vein
KARDD0052 542.40 546.30 3.90 2.34 0.74 35 0.20 1.46 AR2
KARDD0052 557.70 562.00 4.30 2.58 0.73 4 0.45 1.47
KARDD0052 590.20 592.00 1.80 1.08 1.02 5 0.18 1.37
KARDD0052 601.80 608.40 6.60 3.96 2.31 19 0.72 3.66 AR1
including 606.20 608.40 2.20 1.32 4.71 51 1.81 8.12 AR1
KARDD0053 480.40 490.00 9.20 6.90 0.88 1 0.11 1.06 Bulk Intersection
KARDD0053 130.00 132.10 2.10 1.58 1.80 35 0.27 2.62
KARDD0053 461.30 466.00 4.70 3.53 0.97 3 0.08 1.12 AR1
KARDD0053 480.80 489.00 8.20 6.15 0.93 1 0.11 1.12
KARDD0054 310.40 328.40 18.00 13.50 0.90 2 0.04 1.00 Bulk Intersection
KARDD0054 182.60 184.90 2.30 1.73 0.69 16 0.11 1.04
KARDD0054 317.90 324.30 6.40 4.80 2.21 4 0.10 2.42 AR2
including 323.10 324.30 1.20 0.90 9.85 8 0.17 10.21 AR2
KARDD0055 572.20 592.00 19.80 13.86 0.88 2 0.08 1.02 Bulk Intersection
KARDD0055 643.40 659.80 16.40 11.48 0.54 4 0.27 1.02 Bulk Intersection
KARDD0055 299.00 300.30 1.30 0.91 2.15 24 0.38 3.03
KARDD0055 572.20 575.80 3.60 2.52 3.80 3 0.13 4.05 AR2
KARDD0055 617.40 618.00 0.60 0.42 1.39 14 0.90 2.96 AR1
KARDD0055 644.40 647.10 2.70 1.89 0.63 3 0.27 1.09
KARDD0055 650.90 656.10 5.20 3.64 1.03 10 0.56 2.02
KARDD0055 658.60 659.80 1.20 0.84 1.15 2 0.14 1.39
KARDD0056 345.50 417.60 72.10 51.91 0.80 10 0.05 1.00 Bulk Intersection
KARDD0056 345.50 346.90 1.40 1.01 1.51 32 0.25 2.27
KARDD0056 353.50 361.20 7.70 5.54 5.25 61 0.04 6.02 AR2
including 353.50 355.00 1.50 1.08 22.29 224 0.01 24.90 AR2
KARDD0056 375.60 377.70 2.10 1.51 1.54 34 0.19 2.23
KARDD0056 410.20 412.30 2.10 1.51 0.73 7 0.34 1.35 AR1
KARDD0056 481.50 485.30 3.80 2.74 0.91 14 0.20 1.38
KARDD0056 528.60 534.60 6.00 4.32 0.34 24 0.38 1.21
KARDD0057 588.80 711.10 122.30 88.06 0.16 2 0.18 0.46 Bulk Intersection
KARDD0057 127.90 133.10 5.20 3.74 5.06 26 0.14 5.57
KARDD0057 317.20 319.00 1.80 1.30 1.69 31 0.44 2.74
KARDD0057 493.60 495.30 1.70 1.22 1.13 14 0.28 1.72 AR2
KARDD0057 551.20 551.70 0.50 0.36 5.17 38 2.17 9.01 AR1
KARDD0057 616.10 617.60 1.50 1.08 0.67 35 0.35 1.62
KARDD0058 427.10 483.80 56.70 40.82 0.39 2 0.08 0.54 Bulk Intersection
KARDD0058 141.50 142.70 1.20 0.86 5.34 29 0.25 6.06
KARDD0058 361.80 363.60 1.80 1.30 0.96 3 0.04 1.06
KARDD0058 427.10 428.70 1.60 1.15 1.09 2 0.20 1.42 AR2
KARDD0058 441.20 442.50 1.30 0.94 0.87 1 0.13 1.10
8
Hole ID From
(m)
To
(m)
Interval
(m)
True width
(m)
Gold
g/t
Silver
g/t
Copper
% Gold Eq Vein
KARDD0058 480.20 483.80 3.60 2.59 1.04 3 0.10 1.22 AR1
KARDD0059 476.00 498.20 22.20 15.98 0.72 5 0.16 1.02 Bulk Intersection
KARDD0059 281.30 283.40 2.10 1.51 0.78 29 0.46 1.83
KARDD0059 353.80 357.20 3.40 2.45 0.93 12 0.02 1.11
KARDD0059 459.50 460.20 0.70 0.50 4.18 39 1.00 6.21 AR2
KARDD0059 489.60 493.30 3.70 2.66 3.34 22 0.84 4.92 AR1
KARDD0060 608.70 633.60 24.90 16.19 0.45 8 0.30 1.01 Bulk Intersection
KARDD0060 462.00 466.60 4.60 2.99 1.34 10 0.16 1.70
KARDD0060 476.70 478.50 1.80 1.17 1.97 46 0.83 3.80 AR1
KARDD0060 501.10 503.00 1.90 1.24 3.72 21 0.52 4.78
KARDD0060 541.50 543.70 2.20 1.43 0.48 14 0.31 1.14
KARDD0060 614.00 618.40 4.40 2.86 1.39 24 0.54 2.51
KARDD0061 343.00 439.10 96.10 76.88 2.48 4 0.07 2.64 Bulk Intersection
KARDD0061 343.00 345.00 2.00 1.60 3.78 3 0.03 3.86
KARDD0061 374.30 375.50 1.20 0.96 0.80 5 1.24 2.80 AR2
KARDD0061 414.60 421.66 7.06 5.65 27.48 18 0.15 27.92 AR1
including 416.50 419.10 2.60 2.08 64.60 42 0.27 65.50 AR1
KARDD0061 431.10 431.50 0.40 0.32 14.90 5 0.02 14.99
KARDD0061 437.20 438.10 0.90 0.72 13.01 48 1.36 15.70
KARDD0062 334.60 367.40 11.90 9.52 0.69 7 0.15 1.00 Bulk Intersection
KARDD0062 334.60 337.80 3.20 2.56 1.25 17 0.08 1.57 AR2
KARDD0062 341.70 346.50 4.80 3.84 0.76 5 0.28 1.25
KARDD0062 362.20 367.40 5.20 4.16 0.79 11 0.28 1.35 AR1
KARDD0062 493.70 495.60 1.90 1.52 0.74 11 0.03 0.92
KARDD0063 503.80 514.50 10.70 7.49 0.97 4 0.11 1.20 Bulk Intersection
KARDD0063 291.00 292.10 1.10 0.77 5.84 10 0.11 6.12
KARDD0063 471.60 473.00 1.40 0.98 2.83 7 0.11 3.09 AR1
KARDD0063 476.40 476.90 0.50 0.35 8.25 16 0.15 8.68
KARDD0063 510.50 514.50 4.00 2.80 2.12 5 0.16 2.44
KARDD0064 387.70 414.00 26.30 19.99 0.62 6 0.17 0.96 Bulk Intersection
KARDD0064 355.60 356.90 1.30 0.99 2.16 18 0.32 2.86
KARDD0064 387.70 390.00 2.30 1.75 4.49 18 0.57 5.59 AR1
KARDD0064 408.30 410.00 1.70 1.29 0.76 13 0.27 1.33
KARDD0065 297.00 987.4 690.40 641.30 0.17 2 0.17 0.30% CuEq Bulk Porphyry-
style Intersection
including 349.70 745.00 395.30 363.38 0.24 2 0.20 0.38% CuEq Bulk Porphyry-
style Intersection
including 429.80 479.00 49.20 37.39 0.82 4 0.18 1.15 Bulk Intersection
KARDD0065 429.80 435.90 6.10 4.64 3.33 21 0.36 4.14 AR1
KARDD0065 446.10 452.80 6.70 5.09 1.31 2 0.16 1.59
KARDD0065 476.70 479.00 2.30 1.75 2.96 8 1.05 4.70