K92 Mining Announces High Grade Judd 1265 Level Development Results – Total Strike Extension of 211 Metres Averaged 21.69 G/T AuEq at 3.9 Metre J1 Vein Width

Corporate Updates

Suite 488 – 1090 West Georgia Street

Vancouver, British Columbia

Canada V6E 3V7

Telephone: +1 (604) 687-7130

Facsimile: +1 (604) 608-9110

www.k92mining.com

NEWS RELEASE

K92 MINING ANNOUNCES HIGH GRADE JUDD 1265 LEVEL DEVELOPMENT

RESULTS – TOTAL STRIKE EXTENSION OF 211 METRES AVERAGED 21.69 G/T

AUEQ AT 3.9 METRE J1 VEIN WIDTH

• Judd Vein #1 (“J1 Vein”) 1265 Level development encountered significant high-grade

mineralization along both the northern and southern extension drives. Since the

August 23, 2021 press release, the combined extensions totalled 211 metres strike and

recorded an average J1 Vein thickness of 3. 9 metres at 21.69 g/t gold equivalent

(“AuEq”)(1) or 20.36 g/t Au, 0.76% Cu and 24 g/t Ag from channel sampling.

• Northern extension over 97 metres recorded an average vein thickness of 3.8 metres at

18.29 g/t AuEq or 16.85 g/t Au, 0.85% Cu and 24 g/t Ag from channel sampling.

• Southern extension over 114 metres recorded an average vein thickness of 4.0 metres

at 24.44 g/t AuEq or 23.20 g/t Au, 0.69% Cu and 25 g/t Ag from channel sampling.

• The development drive s continue to report solid geotechnical competency , multiple

high-grade faces at significant frequency, with 26% of faces recording average J1 Vein

grades of +10 g/t AuEq from channel sampling. Channel sampling results include:

o 5.2m thickness at 350.52 g/t AuEq or 346.62 g/t Au, 2.01% Cu and 97 g/t Ag

o 2.9m thickness at 152.26 g/t AuEq or 149.47 g/t Au, 0.66% Cu and 150 g/t Ag

o 5.6m thickness at 97.27 g/t AuEq or 95.59 g/t Au, 0.80% Cu and 48 g/t Ag

o 5.7m thickness at 95.57 g/t AuEq or 90.55 g/t Au, 1.54% Cu and 232 g/t Ag

o 2.6m thickness at 49.30 g/t AuEq or 42.89 g/t Au, 4.12% Cu and 74 g/t Ag

o 3.8m thickness at 40.90 g/t AuEq or 39.52 g/t Au, 0.57% Cu and 49 g/t Ag, and

o 5.8m thickness at 22.52 g/t AuEq or 19.65 g/t Au, 1.74% Cu and 44 g/t Ag.

• Mineralization style continues to be intrusive related, Au-Cu-Ag, and similar to Kora.

The results compare favorably with reported drilling and the 1235 Level that recorded

development over 288 metres with an average J1 Vein thickness of 3.7 metres at 11.64

g/t AuEq, including 179 metres at 3.7m vein thickness at 15.39 g/t AuEq.

• Long hole drilling has commenced at the Judd Vein System with the first production

stope on target for Q4, representing an entirely new mining front.

(1) Gold equivalent (AuEq) exploration results is calculated using longer term commodity prices with a copper price

of US$3.30/lb, silver price of US$21/oz and gold price of US$1,600/oz.

2

Vancouver, British Columbia, October 27, 2021 - K92 Mining Inc. (“K92” or the “Company”)

(TSX: KNT; OTCQX: KNTNF) is pleased to announce that it has completed an additional 211

metres of development, extending to both the north and south along the Judd 1265 Level J1 Vein,

within the +2.5km strike, sparsely explored Judd Vein System at the Kainantu Gold Mine in Papua

New Guinea. This is the second sublevel developed on Judd Vein #1. Judd is located near mine

infrastructure, sub -parallel and approximately ~1 50-200 metres west of the producing Kora

deposit.

Since the Company’s August 23, 2021 press release announcing initial development results over

a strike length of 83 metres on the Judd 1265 Level J1 Vein , underground development towards

both the north and south continued to record high grade mineralization. The combined extension

totals 211 metres at an estimated average grade of 21.69 g/t AuEq or 20.36 g/t Au, 0.76% Cu and

24 g/t Ag at an average vein thickness of 3.9 metres from channel sampling . The development

extension to the north recorded a strike l ength of 97 metres with an average grade of 18.29 g/t

AuEq or 16.85 g/t Au, 0.85% Cu and 24 g/t Ag of undiluted J1 Vein extracted at an average vein

thickness of 3.8 metres that ranged from 2.5 metres to near drive width (over 5.5 metres) based on

underground channel sampling. The development extension to the south recorded a strike length

of 114 metres with an average grade of 24.44 g/t AuEq or 23.20 g/t Au, 0.69% Cu and 25 g/t Ag

of undiluted J1 Vein extracted at an average vein thicknes s of 4.0 metres that ranged from 1.7

metres to near drive width (over 5.5 metres) based on underground channel sampling.

Importantly, the development recorded a significant frequency of high grade with 26% of faces

recording J1 Vein average grades greater than 10 g/t AuEq from channel sampling. Some of the

high-grade J1 Vein channel sampling results, include:

- 5.2 m thickness at 350.52 g/t AuEq or 346.62 g/t Au, 2.01% Cu and 97 g/t Ag;

- 2.9 m thickness at 152.26 g/t AuEq or 149.47 g/t Au, 0.66% Cu and 150 g/t Ag;

- 5.6 m thickness at 97.27 g/t AuEq or 95.59 g/t Au, 0.80% Cu and 48 g/t Ag;

- 5.7 m thickness at 95.57 g/t AuEq or 90.55 g/t Au, 1.54% Cu and 232 g/t Ag;

- 2.6 m thickness at 49.30 g/t AuEq or 42.89 g/t Au, 4.12% Cu and 74 g/t Ag;

- 3.8 m thickness at 40.90 g/t AuEq or 39.52 g/t Au, 0.57% Cu and 49 g/t Ag; and

- 5.8 m thickness at 22.52 g/t AuEq or 19.65 g/t Au, 1.74% Cu and 44 g/t Ag.

Several of the higher grade J1 Vein channel samples, including 5.2 m thickness at 350.52 g/t AuEq

or 346.62 g/t Au, 2.01% Cu and 97 g/t Ag and 5.7 m thickness at 95.57 g/t AuEq or 90.55 g/t Au,

1.54% Cu and 232 g/t Ag , were recorded along the southern development drive in an area

approximately 10 metres above hole JDD0006 that recorded 7.25 metres at 256.09 g/t Au, 113 g/t

Ag and 0.42% Cu (258.01 g/t AuEq, 5.30m true width) on the J1 Vein ( see November 9, 2020

press release – K92 Mining Announces Initial Phase 1 High -Grade Judd Vein System Drilling

Results, Including 7.25m at 258.01 g/t AuEq). JDD0006 is one of the highest -grade intersections

drilled by K92 at the Kainantu Mine.

The development drive is designed as a return airway (“RAD”) with dimensions of 5.5 m x 5.5 m,

which is significantly larger than an ore drive or long hole stopes would be. Incorporating excess

dilution from the development drive, the combined northern and southern extensions extr acted

18,454 tonnes at 15.54 g/t gold equivalent AuEq or 14.56 g/t Au, 0.56% Cu and 18 g/t Ag. The

3

Southern drive extension extract ed 10,024 tonnes at 17.77 g/t AuEq or 16.86 g/t Au, 0.51% Cu

and 18 g/t Ag and the northern drive extension extracted 8,430 tonnes at 12.89 g/t AuEq or 11.83

g/t Au, 0.63% Cu and 17 g/t Ag.

Mineralization continues to be intrusive related, gold-copper-silver, and similar to Kora . Ground

conditions are competent and are expected to be amenable to mining widths similar to the average

Judd #1 Vein thickness and those currently mined at Kora, which is a minimum of 2 metres wide

for long hole stoping and minimum 3 metres wide for cut and fill. Towards the south, Judd has

extensive artisanal mine workings at surface in addition to high grade shallow historic intersections

such as BKDD0002 recording 3.0 m at 278.2 g/t Au and 0.21% Cu and 053BD02 recording 9.0 m

at 8.32 g/t Au and 1.11% Cu (See Figure 2). Similar to Kora, the results to date have shown higher

and lower grade areas and importantly, the development results also correspond well with reported

drilling and the 1235 Level that recorded 288 metres of development with an average J1 Vein

thickness of 3.7 m at 11.64 g/t AuEq, including 179 m at 3.7m thickness at 15.39 g/t AuEq (see

January 26, 2021 press release: K92 Mining Announces Judd Underground Development

Extension Results - Average J1 Vein Grade of 18.70 g/t AuEq at 3.8 m Width).

As a result of the promising drilling, underground development and metallurgical results to date,

Judd has become an entirely new mining front and major exploration focus. On mining, long hole

drilling has commenced and first production stoping is on track for the fourth quarter . This is

expected to provide a significant boost to operational flexibility . On exploration, a larger drill

program is planned to start at Judd imminently with at least two thirds of underground drill rigs

allocated to Judd by early November. Exploration and development results will form the basis for

the upcoming maiden Judd resource estimate and geostatistics / top-cuts, targeting Q1 2022.

John Lewins, K92 Chief Executive Officer and Director, stated, “The latest development results

continue to demonstrate the significant potential of the Judd Vein System. Along the 1265 Level,

development to the north and south recorded both high grades and solid thickness. Development

along the level has recorded a total of 294 metres of continuous J1 Vein mineralization, averaging

3.8 metres vein thickness at 20.34 g/t AuEq or 18.60 g/t Au, 1.03% Cu and 26 g/t Ag from channel

sampling. These results are su pported by strong 1235 Level and exploration drilling results to

date.

The results also recorded a solid frequency of high grades, with 26% of faces recording average

J1 Vein grades of +10 g/t AuEq from channel sampling . Encouragingly, several high -grade

channel samples are proximal to , and support previously reported high-grade drilling results,

including hole JDD0006 that recorded 7.25 metres at 256.09 g/t Au, 113 g/t Ag and 0.42% Cu

(258.01 g/t AuEq, 5.30m true width). JDD0006 is located approximately 10 metres below the 1265

Level southern development channel samples 5.2-metre thickness at 350.52 g/t AuEq or 346.62 g/t

Au, 2.01% Cu and 97 g/t Ag and 5.7-metre thickness at 95.57 g/t AuEq or 90.55 g/t Au, 1.54% Cu

and 232 g/t Ag.

While exploration at Judd is still in its early days, it is not only open along strike to the south and

north, up -dip and down -dip, but also has at least four known veins, a known strike length of

+2.5km that is sparsely drilled and similar mineralization to Kora. Importantly , vectors to the

4

south, including extensive artisanal mining on surface and shallow historical high -grade

intersections are very promising.

We are pleased to report that exploration activities at Judd will be rapidly expanding imminently.

By early November, we plan to have at least two -thirds of our underground drill rigs on Judd,

after infill drilling at Kora concludes for its updated resource estimate later this year. Activities

at Judd South are also planned, with surf ace mapping and sampling underway, as part of a

program also targeting Kora South. Drilling at Kora South recently commenced from surface, and

we expect opportunities to target Judd South as well.

Lastly, we are very excited to be commencing production stoping at Judd this quarter. Long-hole

drilling is underway and production stoping at an entirely new mining front is expected to provide

a notable boost to operational flexibility. As Judd is near Kora’s mine infrastructure, we have the

ability to quickly pivot from exploration success to production, which is a major advantage that

we plan to continue to leverage going forward.”

See Figure 1 for location map of the Judd Vein System, 1235 and 1265 Level, surrounding veins

and infrastructure.

See Figure 2 for Judd Vein Long-Section with current Judd Vein interpretations.

See Figure 3 for a plan view of the 1265 Level Judd Vein #1 underground channel sampling.

Face Sampling Methodology, QA/QC and Qualified Person

Face channel samples under geological control, were taken across the full face of both the exposed

lode system and any waste rock, with sample intervals ranging from 0.1 to 1m in width depending

on the geologist’s interpretation. Two samples were taken per interval at waist and knee height

and the corresponding widths recorded. Sample lengths are <1.5m , with samples approximately

3.5 kg in size . Samples were separately assayed for gold, copper and silver , and the results

averaged out using length weighting and channel orientation before entry into the database. K92’s

procedure includes the insertion standards, blanks and duplicates for the face sampling. Gold

assays are by the fire assay method. Copper and silver assay s are by three-acid-digestion method

(nitric, perchloric & hydrochloric mix).

K92 maintains an industry-standard analytical quality assurance and quality control (QA/QC) and

data verification program to monitor laboratory performance and ensure high quality assays.

Results from this program confirm reliability of the assay results. All sampling and analytical work

for the mine exploration program is performed by Intertek Testing Services (PNG) LTD, an

independent accredited laboratory that is located on site. External check assays for QA/QC

purposes are performed at SGS Australia Pty Ltd in Cairns, Queensland, Australia.

The analytical QA/QC program is currently overseen by Andrew Kohler, PGeo, Mine Geology

Manager and Mine Exploration Manager for K92. Andrew Kohler, a qualified person under the

meaning of Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects,

has reviewed and is responsible for the technical content of this news release.

5

About K92

K92 Mining Inc. is engaged in the production of gold, copper and silver from the Kora deposit at

the Kainantu Gold Mine in the Eastern Highlands province of Papua New Guinea, as well as

exploration and development of mineral deposits in the immediate vicinity of the mine. The

Company declared commercial production from Kainantu in February 2018 and is in a strong

financial position.

The Company commenced an expansion of the mine based on an updated Preliminary Economic

Assessment on the property which was published in January 2019 and updated in July 2020. K92

is operated by a team of mining professionals with extensive international mine -building and

operational experience.

On Behalf of the Company,

John Lewins, Chief Executive Officer and Director

For further information, please contact David Medilek, P.Eng., CFA at +1-604-687-7130.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news

release includes certain “forward -looking statements” under applicable Canadian securities

legislation. Forward-looking statements are necessarily based upon a number of estimates and

assumptions that, while considered reasonable, are subject to known and unknown risks,

uncertainties, and o ther factors which may cause the actual results and future events to differ

materially from those expressed or implied by such forward -looking statements. All statements

that address future plans, activities, events, or developments that the Company believ es, expects

or anticipates will or may occur are forward-looking information, including statements regarding

the realization of the preliminary economic analysis for the Kainantu Project, expectations of

future cash flows, the planned plant expansion, prod uction results, cost of sales, sales of

production, potential expansion of resources and the generation of further drilling results which

may or may not occur. Forward -looking statements and information contained herein are based

on certain factors and ass umptions regarding, among other things, the market price of the

Company’s securities, metal prices, exchange rates, taxation, the estimation, timing and amount

of future exploration and development, capital and operating costs, the availability of financin g,

the receipt of regulatory approvals, environmental risks, title disputes, failure of plant, equipment

or processes to operate as anticipated, accidents, labour disputes, claims and limitations on

insurance coverage and other risks of the mining industry , changes in national and local

government regulation of mining operations in PNG, mitigation of the Covid -19 pandemic,

continuation of the lifted state of emergency, and regulations and other matters. There can be no

assurance that such statements will prove to be accurate, as actual results and future events could

differ materially from those anticipated in such statements. Accordingly, readers should not place

undue reliance on forward-looking statements. The Company disclaims any intention or obligation

to update or revise any forward-looking statements, whether as a result of new information, future

events or otherwise, except as required by law.

Figure 1 – Location Map of the Judd Vein System, 1235 and 1265 Level, Surrounding Veins and Infrastructure

7

Figure 2 – Judd Vein System long-section including Judd Vein interpretations (“Interps”) based on sparse drilling

8

Figure 3 – Plan view of the Judd Vein #1 1265 Level underground channel sampling with latest results (face 24 to 80) highlights annotated.