Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KNT.TO ·

K92 announces results, including 6.8m at 53.34 g/t Au, 106 g/t Ag and 1.16% Cu (56.45 g/t

Drill Results

Suite 488 – 1090 West Georgia Street

Vancouver, British Columbia

Canada V6E 3V7

Telephone: (604) 687-7130

Facsimile: (604) 608-9110

NEWS RELEASE

9 February 2018 Vancouver, British Columbia

K92 MINING INC.

K92 announces results, including 6.8m at 53.34 g/t Au, 106 g/t Ag and 1.16% Cu (56.45 g/t

AuEq) in KMDD0049 – the most southerly hole Drilled from Diamond Drill Cuddy 2 (DDC2)

• Multiple wide intervals of high grade mineralization from hole KMDD0049

• Drillhole intersections are above the current working levels

• Drilling ongoing

K92 Mining Inc. (“K92”) (TSX-V: KNT) (OTCQB: KNTNF) has intersected multiple intervals of

high grades of gold in drill hole KMDD0049, which is a drill hole on the most southerly line being

drilled from diamond drill cuddy 2 (DDC2) orientated 25 o upwards, above the current working

level.

Included within the results is the highest grade and best intersection K92 has achieved from Kora

vein K2, being 6.8 m (4.75 true width) @ 56.45 g/t AuEq along continuing high grades in Kora

vein K1, being 5.6m (3.27 true width) @ 41.71 g/t AuEq . Additional to these wide intervals of

high grade, an intersection into a cross cutting link structure designated Kora KL2 returned an

assay of 2.8m (1.96 true width) @ 13.33 g/t AuEq . K92 believes that the presence and results

related to this second link stru cture potentially indicates tha t the current high grade being

encountered in Kora K1 continues further to the south.

K92 Chief Executive Officer John Lewins states, “In the same week as K92 has declared the

achievement of commercial production, it is extremely pleasing to report results from possibly the

best hole we have drilled to date in Kora North. This and other results from the mining,

development and drilling at Kora North over th e last month have been outstanding and continue

to build our knowledge of the deposit and its potential. We continue to see remarkable consistency,

intercepting mineralization in almost every single hole drilled from the first two underground drill

cuddies and look forward to continuing our drilling program aimed at defining the potential of the

Kora Deposit.”

Tables 1 and 2 below provide a summary of the results from the latest diamond grade control drill

hole drilled into the Kora North Vein system. Table 1 provides a summary of the significant

intercepts from the hole, while Table 2 provides details of collar location and hole orientation.

Table 1.0 Kainantu Gold Mine – Significant Intercepts from Kora Underground Diamond

Drilling

Hole_id From (m) To (m) Interval

(m)

True

width (m) Gold g/t Silver g/t Copper % Gold

equivalent Comment

KMDD0049 40.55 44 3.45 2.02 1.37 3.00 0 2.04 K1E

including 40.55 40.8 0.25 0.15 4.13 6.00 0 4.71

including 41.45 42.35 0.90 0.53 2.43 4.00 1 3.40

including 43.6 44 0.40 0.23 2.06 4.00 1 3.38

KMDD0049 44.5 50.1 5.6 3.27 40.81 16 0.46 41.71 K1W

including 44.5 45.78 1.28 0.75 25.01 4 0.24 25.43

including 45.78 46.5 0.72 0.42 1.41 16 0.97 3.09

including 46.5 47.3 0.8 0.47 22.58 8 0.16 22.93

including 47.3 48.45 1.15 0.67 152.70 46 0.40 153.90

including 48.45 50.1 1.65 0.96 1.13 7 0.58 2.11

KMDD0049 76.7 79.5 2.8 1.96 7.86 34 3.29 13.33 KL2

including 77.2 78.1 0.9 0.63 22.21 85 9.64 38.03

including 78.1 79.5 1.4 0.98 1.14 11 0.35 1.82

KMDD0049 91.9 98.7 6.8 4.75 53.34 106 1.16 56.45 K2

including 91.9 92.2 0.3 0.21 1.22 22 0.53 2.32

including 92.2 93.4 1.2 0.84 0.57 17 0.22 1.13

including 93.4 94.5 1.1 0.77 7.84 29 0.34 8.74

including 94.5 95.5 1 0.70 7.07 33 0.14 7.71

including 95.5 96.9 1.4 0.98 159.40 400 3.94 170.50

including 96.9 98 1.1 0.77 81.31 53 1.20 83.81

including 98 98.7 0.7 0.49 47.65 12 0.15 48.04

Notes

Gold Equivalent uses Copper price – US$2.90/lb; Silver price US$16.5/oz and Gold price of US$1300/oz

Table 2.0 Kainantu Gold Mine – Collar Locations for Kora Underground Diamond Drilling

Hole_id Collar location Collar orientation EOH

depth (m) Lode

Local

north

Local

East mRL Dip Local

azimuth

KMDD0049 59361.95 29897.80 1206.41 -6.4 281.7 85.5 Kora

K92 Mine Geology Manager and Mi ne Exploration Manager, Mr. Andr ew Kohler, PGeo, a

qualified person under the meaning of Canadian National Instrument 43-101, has reviewed and is

responsible for the technical content of this news release. Data verification by Mr. Kohler includes

significant time onsite reviewing drill core, face sampling, un derground workings and discussing

work programs and results with geology and mining personnel.

On behalf of the company,

John Lewins, Chief Executive Officer and Director

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: Thi s

news release includes certain “forward-looking statements” under applicable Canadian securities

legislation. Forward-looking stat ements are necessarily based u pon a number of estimates and

assumptions that, while consider ed reasonable, are subject to k nown and unknown risks,

uncertainties, and other factors which may cause the actual res ults and future events to differ

materially from those expressed or implied by such forward-look ing statements. All statements

that address future plans, activities, events or developments that the Company believes, expects or

anticipates will or may occur are forward-looking information, including statements regarding the

realization of the preliminary economic analysis for the Project, expectations of future cash flows,

the proposed plant expansion, pote ntial expansion of resources and the generation of further

drilling results which may or may not occur. Forward-looking st atements and information

contained herein are based on certain factors and assumptions r egarding, among other things, the

market price of the Company’s securities, metal prices, exchang e rates, taxation, the estimation,

timing and amount of future exploration and development, capita l and operating costs, the

availability of financing, the r eceipt of regulatory approvals, environmental risks, title disputes,

failure of plant, equipment or processes to operate as anticipated, accidents, labour disputes, claims

and limitations on insurance coverage and other risks of the mi ning industry, changes in national

and local government regulation of mining operations, and regul ations and other matters.. There

can be no assurance that such statements will prove to be accur ate, as actual results and future

events could differ materially from those anticipated in such s tatements. Accordingly, readers

should not place undue r eliance on forward-looking statements. The Company disclaims any

intention or obligation to update or revise any forward-looking statements, whether as a result of

new information, future events or otherwise, except as required by law.