Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

KLD.V ·

Kenorland Minerals Reports a Grassroots Discovery of Widespread Gold Mineralisation at the Opinaca Project, Quebec

Exploration Programs

Kenorland Minerals Reports a Grassroots

Discovery of Widespread Gold Mineralisation

at the Opinaca Project, Quebec

Vancouver, British Columbia--(Newsfile Corp. - January 21, 2026) -

Kenorland Minerals Ltd.

(TSXV:

KLD) (OTCQX: KLDCF) (FSE: 3WQ0) ("

Kenorland"

or the "

Company

") is pleased to report a

grassroots gold discovery at the Opinaca Project (the "

Project

"), located in the James Bay region of

Quebec. Kenorland is the current operator and holds a 3% net smelter return ("

NSR

") royalty on the

Project, which is 100% owned by Targa Exploration Corp. ("

Targa

"). Assays from all 8 drill holes

completed in the campaign, totaling in 3,665 metres of drilling, are reported herein.

Drill Highlights:

Discovery of widespread gold mineralisation intersected in 7 of 8 drill holes over a 4-km target

area with no prior drilling or known mineral occurrences.

High-grade intercepts include hole

25OPDD007 of 3.65m at 13.88 g/t Au, including 0.30m at

166.14 g/t Au

with +10 specs of visible gold (VG), and 25OPDD006 that returned 4.79m at 2.39

g/t Au, including 0.70m at 14.80 g/t Au.

Broad zones of gold mineralisation across three fences including; 70.55m at 0.17 g/t Au (incl.

8.10m at 0.38 g/t Au) in 25OPDD004; 16.85m at 0.69 g/t Au (incl. 3.25m at 2.23 g/t Au) in

25OPDD003; and 16.00m at 0.43 g/t Au (incl. 1.50m at 3.13 g/t Au) in 25OPDD008.

Mineralisation style analogous to the regionally significant, intrusion-related, Cheechoo gold

deposit*.

Figure 1. Plan map of Opinaca drilling

with highlights from this press release

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6489/281017_73f31684540f2899_001full.jpg

Discussion of Results

The 2025 fall drill program represents the first-ever drilling at the Project, following two years of

systematic exploration. Prior to this program, no historical drilling or documented gold occurrences had

been reported within the target area. The maiden drill program comprised eight (8) diamond drillholes

totaling 3,665 metres, designed to test a 4-km-wide area located at the head of an extensive gold-in-till

and heavy mineral concentrate (HMC) gold grain anomaly, as well as anomalous rock samples returning

up to 6.67 g/t Au identified through prospecting.

Widespread gold mineralisation was intersected across the target area along three separate drill

fences. Mineralisation is hosted within all lithologies including felsic tonalitic intrusives with moderate to

strong albite alteration, moderately to strongly deformed meta-wacke, felsic pegmatite and fine-grained

mafic intrusive units. Foliation-parallel quartz-feldspar-biotite ± arsenopyrite veins associated with gold

cross-cut all lithologies.

The spatial association of gold with albite-altered tonalites, quartz-feldspar veinlets, arsenopyrite, and

pegmatites is similar to the Cheechoo gold deposit* (Sirios Resources), also located in the James Bay

region, underscoring the potential for a significant intrusion-related gold system at the Opinaca Project.

Figure 2. 166.14 g/t Au quartz-amphibole-arsenopyrite-gold vein from 25OPDD007, 459.85-460.15m

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6489/281017_73f31684540f2899_002full.jpg

Results from each of the three drill fences are summarized below:

Western Fence: Targeted up-ice of a gold grain in till anomaly in proximity to an interpreted NE

trending structure.

3.65m at 13.88 g/t Au including 0.30m at 166.14 g/t Au

was intersected in

25OPDD007 with

+10 specs of visible gold (VG)

, associated with a quartz-amphibole-

arsenopyrite vein in meta-wacke. Drillhole 25OPDD007 also returned

15.05m at 0.59 g/t Au

including 2.45m at 2.81 g/t Au

hosted in albite-altered tonalite.

Central Fence: Drilling undercut multiple anomalous boulder samples at surface. Drillhole

25OPDD006 returned 4.79m at 2.39 g/t Au including 0.70m at 14.80 g/t Au in meta-wacke. Holes

25OPDD003 and 25OPDD004 returned

16.85m at 0.69 g/t Au including 3.25m at 2.23 g/t Au

and 70.55m at 0.17 g/t Au including 8.10m at 0.38 g/t in meta-wacke with folded quartz-feldspar-

biotite-arsenopyrite veinlets.

Eastern Fence: One drill hole targeted up-ice of a till geochemical anomaly; 25OPDD008

intersected

16.00m at 0.43 g/t Au incl. 1.50m at 3.13 g/t Au

in meta-wacke.

Table 1: Table of assay results from the maiden drill program

HOLE ID

From (m)

To (m)

Interval (m)

Au (g/t)

25OPDD001

160.63

161.52

0.89

2.71

And

189.92

192.35

2.43

0.96

And

216.20

217.00

0.80

3.43

25OPDD002

No Significant Results

25OPDD003

309.15

326.00

16.85

0.69

Incl.

315.75

319.00

3.25

2.23

And

349.47

356.45

6.98

0.40

And

377.87

380.00

2.13

1.40

Incl.

377.87

378.24

0.37

7.45

25OPDD004

115.74

186.29

70.55

0.17

Incl.

132.16

140.26

8.10

0.38

And

310.50

323.61

13.11

0.21

And

333.50

353.61

20.11

0.29

25OPDD005

303.50

305.50

2.00

1.16

And

329.00

340.58

11.58

0.52

Incl.

337.80

338.62

0.82

4.66

25OPDD006

80.74

88.00

7.26

0.21

And

217.50

221.50

4.00

0.37

And

326.50

331.29

4.79

2.39

Incl.

330.00

330.70

0.70

14.80

25OPDD007

269.05

273.50

4.45

0.93

Incl.

271.55

273.50

1.95

1.96

And

283.60

298.65

15.05

0.59

Incl.

284.90

287.35

2.45

2.81

And

310.20

318.00

7.80

0.33

And

357.60

364.50

6.90

0.64

Incl.

363.00

364.50

1.50

2.24

And

394.10

422.55

28.45

0.16

And

459.35

463.00

3.65

13.88

Incl.

459.85

460.15

0.30

166.14

25OPDD008

285.00

301.00

16.00

0.43

Incl.

294.00

295.50

1.50

3.13

† Assay intervals reported are core lengths, true widths have not been determined.

Table 2. Drill hole location and collar table of reported drill from the maiden drill program

HOLE ID

Easting (NAD 83)

Northing (NAD 83)

Elevation (m)

Depth (m)

Dip

Azimuth

25OPDD001

556423

5891755

369.1

450.00

-45

166

25OPDD002

556490

5891481

385.7

449.15

-45

164

25OPDD003

558212

5891668

364.2

420.00

-45

165

25OPDD004

558280

5891395

388.2

450.00

-48

165

25OPDD005

557834

5891039

408.5

411.00

-45

165

25OPDD006

558264

5892105

372.2

573.00

-46

166

25OPDD007

556344

5892129

380.7

519.00

-46

166

25OPDD008

560296

5891309

388.3

393.00

-46

164

The visible gold (VG) sample observed in drillhole 25OPDD007 from 459.85 to 460.15 m originally

assayed >1,000 g/t Au by standard fire assay (FA530). The sample was subsequently re-assayed using

both high-grade fire assay (FA501) and metallic screen fire assay (FS652). The high-grade fire assay

returned 2,328 g/t Au, while the metallic screen assay returned 166.14 g/t Au.

The discrepancy between these results is interpreted to reflect a strong nugget effect related to the

coarse-grained nature of the gold, as well as the limited sample mass available for metallic screen

analysis. For reporting purposes, the metallic screen fire assay result of 166.14 g/t Au has been used in

this press release (Table 1), as it is considered the more representative analytical method.

Figure 3. Opinaca Project location

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6489/281017_73f31684540f2899_003full.jpg

*Cheechoo gold deposit: Open-Pit Indicated 35.0Mt at 1.12 g/t (1.26Moz Au); Open-Pit Inferred 38.2Mt at 1.01 g/t (1.24Moz Au); Underground

Inferred 4.5Mt at 3.09 g/t (0.45Moz Au). Source: PLR Resources, Mineral Resource Estimate Update for the Cheechoo Project, 07/01/2025.

Available at:

www.sirios.com

.

The mineral resources and reserves discussed for Cheechoo are not located on the Opinaca Project. The Company has not verified this

information and it is not being treated as current mineral resources or reserves of the Company. The information is provided for geological context

only.

About the Opinaca Project

The Opinaca Project is located in the James Bay region of Quebec, approximately 50 km south of the

all-season Trans-Taiga Road and regional hydroelectric infrastructure. The Project was originally staked

by Kenorland and subsequently vended to Targa in exchange for equity consideration and 3% NSR

royalty.

Originally evaluated for lithium potential, Kenorland initiated a regional till sampling program in 2023 that

led to the discovery of two significant and distinct gold anomalies characterized by elevated Au-As-W-

Sb geochemical signatures. These results highlighted the potential for an orogenic gold system on the

property and represented the first documented mineral exploration on the Opinaca ground.

Subsequent claim staking expanded the property in the up-ice direction to cover potential bedrock

source areas, resulting in a consolidated land position totaling 85,267 hectares. Follow-up work in 2024

included infill till sampling, expanded grid coverage, and the collection of 10 kg heavy mineral

concentrate samples for gold grain analysis. This work outlined a continuous ~7 km east-west

prospective gold trend, with elevated and spatially coherent gold grain counts consistently observed

down-ice from the interpreted source area.

Additional work in September 2024 included tighter-spaced HMC sampling and extensive boulder

prospecting, which returned anomalous gold values (>0.1 g/t Au) from multiple lithologies, including up to

6.67 g/t Au from a laminated quartz vein boulder. In June 2025, a heliborne magnetic-VLF survey

identified a 4 km-long magnetic feature coincident with the core of the gold geochemical footprint, further

refining structural and geological targets.

Qualified Person

Cédric Mayer, M.Sc., P.Geo. (OGQ #02385), Senior Project Geologist at Kenorland, "Qualified Person"

under National Instrument 43-101, has reviewed and approved the scientific and technical information in

this press release.

QA/QC and Core Sampling Protocols

All drill core samples were collected under the supervision of Kenorland employees. Drill core was

transported from the drill platform to the logging facility where it was logged, photographed, and split by

diamond saw prior to being sampled. Samples were then bagged, and blanks and certified reference

materials were inserted at regular intervals. Groups of samples were placed in large bags, sealed with

numbered tags in order to maintain a chain-of-custody, and transported from Chibougamau to Bureau

Veritas Commodities ("

BV

") laboratory in Timmins, Ontario.

Sample preparation and analytical work for this drill program were carried out by BV. Samples were

prepared for analysis according to BV method PRP70-250: individual samples were crushed to 2mm

(10 mesh) and a 250g split was pulverized to 75μm (200 mesh) for analysis and then assayed for gold.

Gold in samples were analyzed using BV method FA430 where a 30g split is analyzed with fire assay by

Pb collection and AAS finish. Over-limits gold samples were re-analyzed using BV method FA530

where a 30g split is analyzed with fire assay by Pb collection and gravimetric finish. Multi-element

geochemical analysis (45 elements) was performed on all samples using BV method MA200 where a

0.25g split is by multi-acid digest with ICP-MS/ES finish. All results passed the QA/QC screening at the

lab, all company inserted standards and blanks returned results that were within acceptable limits.

FA501 and FS652 were additionally completed on the VG sample. FA501 consists of a 2g aliquot taken

from the original pulverized sample and analyzed by fire assay, with appropriate certified reference

materials and replicate assays included to monitor analytical accuracy and precision. FS652 is a

metallic screen fire assay method, in which a 500 g split of the sample is screened to 106 μm. A 50 g

split from both the plus and minus size fractions is analyzed by fire assay with lead (Pb) collection and

gravimetric finish. A duplicate analysis is performed on the minus fraction. The final gold (Au) grade is

calculated based on the measured proportions of the plus and minus fractions from the original 500 g

split.

About Kenorland Minerals

Kenorland Minerals Ltd. (TSXV: KLD) is a well-financed mineral exploration company focused on project

generation and early-stage exploration in North America. Kenorland's exploration strategy is to advance

greenfields projects through systematic, property-wide, phased exploration surveys financed primarily

through exploration partnerships including option to joint venture agreements. Kenorland holds a 4% net

smelter return royalty on the Frotet Project in Quebec, which is owned by Sumitomo Metal Mining

Canada Ltd. The Frotet Project hosts the Regnault gold system, a greenfields discovery made by

Kenorland and Sumitomo Metal Mining Canada Ltd. in 2020, which contains an Inferred Mineral

Resource of 14.5 Mt at 5.47 g/t Au for 2.55 Moz of gold. Kenorland is based in Vancouver, British

Columbia, Canada.

Further information can be found on the Company's website

www.kenorlandminerals.com

.

On behalf of the Board of Directors of Kenorland Minerals,

Zach Flood

President, CEO & Director

For further information, please contact:

Alex Muir, CFA

Corporate Development and Investor Relations Manager

Tel +1 604 568 6005

[email protected]

Cautionary Statement Regarding Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information (together,

"forward-looking statements") within the meaning of applicable securities laws. All statements, other

than statements of historical facts, are forward-looking statements. Generally, forward-looking

statements can be identified by the use of terminology such as "plans", "expects", "estimates",

"intends", "anticipates", "believes" or variations of such words, or statements that certain actions,

events or results "may", "could", "would", "might", "will be taken", "occur" or "be achieved". Forward-

looking statements involve risks, uncertainties and other factors disclosed under the heading "Risk

Factors" and elsewhere in the Company's filings with Canadian securities regulators, that could cause

actual results, performance, prospects and opportunities to differ materially from those expressed or

implied by such forward-looking statements. Although the Company believes that the assumptions

and factors used in preparing these forward-looking statements are reasonable based upon the

information currently available to management as of the date hereof, actual results and developments

may differ materially from those contemplated by these statements. Readers are therefore cautioned

not to place undue reliance on these statements, which only apply as of the date of this news release,

and no assurance can be given that such events will occur in the disclosed times frames or at all.

Except where required by applicable law, the Company disclaims any intention or obligation to update

or revise any forward-looking statement, whether as a result of new information, future events or

otherwise.

This news release may contain information about adjacent properties on which the Company does not

have an interest. The Qualified Person has not verified the information, and it is not necessarily

indicative of the mineralisation on the Project.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/281017