Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KIP.V ·

Kiplin Metals Welcomes $1 Billion Government Support FOR Development of SMR (Small Nuclear Reactor)

Corporate Updates

NEWS RELEASE

KIPLIN METALS WELCOMES $1 BILLION GOVERNMENT SUPPORT FOR

DEVELOPMENT OF SMR (SMALL NUCLEAR REACTOR)

October 27 th, 2022 – Kiplin Metals Inc. (TSX-V: KIP) (the “ Company” or “ Kiplin”) welcomes the recent

announcement (Tuesday, October 25 th 2022) that Canada will provide nearly $1 billion ( C$970 million) in

financing to develop a grid -scale small modular reactor (SMR), a new nuclear technology touted as a key

part of the country's plans to reduce emissions, Natural Resources Minister Jonathan Wilkinson.

See: https://www.cp24.com/news/trudeau-government-invests-nearly-1-billion-in-new-ontario-nuclear-

reactor-1.6124001

According to the IAEA (International Atomic Energy Agency) there are about 50 SMR designs and concepts

globally. Most of them are in various developmental stages and some are claimed as being near -term

deployable. Earlier this year, four provincial governments (Saskatchewan, Ontario, New Brunswick and

Alberta) were pushing ahead with a plan to develop nuclear power in Canada. Don Morgan, minister

responsible for SaskPower in Saskatchewan, and his provincial counterparts said the small -scale reactors

are a good solution to providing clean power in remote communities and to Alberta's oilsands.

Key highlights in the recent Federal government statement include:

• The funding, offered as low -interest debt from the Canada Infrastructure Bank's (CIB) pool

earmarked for clean power investments, would go toward preparation work required prior to nuclear

construction, including project design and site preparation.

• At the Tuesday announcement, Ontario Power Generation (OPG) CEO Ehren Cory revealed the

company will be investing the funds so the SMR reactor can be built and fully functional at the Darlington

Nuclear Generating Station by 2029. Cory was joined by Ontario Minister of Energy, Todd Smith.

• Recognition that nuclear energy is critical to the achievement of Canada's climate goals. Wilkinson

said at the Darlington Energy Complex in Clarington, Ontario, “Canada, like the rest of the G7, is targeting

net-zero emissions by 2050. The government has an intermediate goal to cut emissions 40% to 45% below

2005 levels by 2030. Nuclear power is one source that can help in reaching our climate targets while

addressing growing future demand.”

• Once the SMR is completely built, OPG says it will avoid about 740,000 tonnes of greenhouse gas

emissions each year -- roughly the equivalent of gas emissions from 160,000 gas-powered cars.

Saskatchewan’s Athabasca Basin is Canada’s leading producer of uranium, with 90 per cent exported, and

the remaining 10 per cent fuelling nuclear reactors in Canada. Saskatchewan’s uranium is responsible for

powering approximately 1 in 20 homes in the United States (*). According to the 2021 Fraser Institute

Annual Survey of Mining Companies, Saskatchewan has retained its #1 spot as the best place in Canada,

and is the second-best jurisdiction globally, for mining investment attractiveness.

Kiplin is well positioned in the Athabasca district, with the right to earn a 100-per-cent interest in the Cluff

Lake Road (“CLR”) uranium project. The CLR project covers approximately 531 ha in the southwestern

Athabasca basin and is five km east of the Cluff Lake Road (Hwy 955), which leads to the historic Cluff Lake

mine, which historically produced approximately 62 million pounds of yellowcake uranium. The CLR project

is also completely surrounded by Fission 3.0 Corp.'s high profile Paterson Lake North (PLN) project.

Results from a recent completed exploration program (see Press Release Oct 5, 2022) on the CLR project

will be announced when assays are received.

"The Company welcomes the Federal governments support for development and advancement of the small

modular reactor (SMR) sector. SMR could play a significant role in reducing Canada’s future emissions and

could be allow for energy independence of smaller nort hern communities and enhance development of

remote resource projects. Growth and resurgence in the nuclear sector will require additional uranium

deposits and Kiplin is focused on exploration in the uranium -rich Athabasca district ”, states Director, Dr.

Peter Born.

*(https://www.saskatchewan.ca/business/investment-and-economic-development/key-economicsectors/energy#:~:

text=Saskatchewan%20is%20he%20world%27s%20leading%20supplier%20of%20uranium,1%20in%2020%20homes

%20in%20the%20United%20States.)

Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and is

responsible for, and has approved, the technical information contained in this release.

About Kiplin Metals Inc.

Kiplin Metals Inc. is a mineral exploration company. We create value for our shareholders by identifying

and developing highly prospective mineral exploration opportunities. Our strategy is to advance our

projects from discovery all the way to production. This vertically integrated strategy allows Kiplin Metals to

achieve exceptional shareholder value through the entire life-cycle of the mining process.

Cluff Lake Road Uranium Project. Kiplin Metals has the right to earn a one-hundred percent interest in the

Cluff Lake Road Uranium Project (the “CLR Project”). The CLR Project covers ~531ha in the southwestern

Athabasca Basin in northern Saskatchewan, where several new discoveries, including the Arrow and Tripe

R Uranium deposits have been made. The CLR Project is 5km east of the Cluff Lake Road (Hwy 955), which

leads to the historic Cluff Lake Mine, which historically produced approximately 62,000,000lbs of

yellowcake uranium.

Exxeter Gold Project covers an area of 715ha located in Val d’Or Quebec, one of the premier gold camps in

the world which produced over 113.4M oz Au by the end of 2019. The project covers 3.8km of the Cadillac

Tectonic zone, which is the principal geologic structure responsible for cold mineralization in the Val d’Or.

For further information, contact the Company at [email protected], or visit the Company’s website at

www.kiplinmetals.com.

On behalf of the Board,

Kiplin Metals Inc.

For further information, contact the Company at 604-622-1199.

On behalf of the Board of Directors,

“Peter Born”

Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other

than statements of historical fact, are to be considered forward looking. Although the Company believes the expectations expressed

in such forward -looking statements are based on reasonable assumptions, such statemen ts are not guarantees of future

performance and actual results or developments may differ materially from those in forward-looking statements. There can be no

assurances that such statements will prove accurate and, therefore, readers are advised to rely o n their own evaluation of such

uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the applicable

laws.