Kiplin Metals Receives Permit FOR Its Cluff Lake ROAD Uranium Project IN Athabasca, Saskatchewan, Canada
NEWS RELEASE
KIPLIN METALS RECEIVES PERMIT FOR ITS CLUFF LAKE ROAD
URANIUM PROJECT IN ATHABASCA, SASKATCHEWAN, CANADA
September 12th, 2022 – Kiplin Metals Inc. (TSX-V: KIP) (the “Company” or “Kiplin”) announces that the
Company has received the requisite exploration permits for its upcoming geophysical survey program at
the Company’s Cluff Lake Road (CLR) Uranium Project in northwestern Saskatchewan. The Company is
the beneficiary of a 100% interest in the Cluff Lake Road Uranium Project and controls all exploration and
development of the Project at this time.
The survey is to consist of up to 40-line kilometers, in a roughly east west direction, and will be integrated
with data from previous surveys to develop targets for diamond drilling. The purpose of the survey is to
define drill targets which are prioritized by radon gas soil anomalies, identified within interpreted faults.
The Company is applying for the requisite permits and expects to be drilling within the next 60 days.
Peter Born, Director of Kiplin, commented “we are very pleased to receive this permit, and appreciate the
Province’s support of our upcoming exploration plan. This program will allow us to advance the Cluff Lake
Road Uranium Project meaningfully.”
The Company intends to initiate this exploration program as quickly as possible and will provide updates
on the timing of its work program as they become available.
Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and
is responsible for, and has approved, the technical information contained in this release.
About Kiplin Metals Inc.
Kiplin Metals Inc. is a mineral exploration company. We create value for our shareholders by identifying
and developing highly prospective mineral exploration opportunities. Our strategy is to advance our
projects from discovery all the way to production. This vertically integrated strategy allows Kiplin Metals
to achieve exceptional shareholder value through the entire life-cycle of the mining process.
Cluff Lake Road Uranium Project. Kiplin Metals has the right to earn a one-hundred percent interest in
the Cluff Lake Road Uranium Project (the “CLR Project”). The CLR Project covers ~531ha in the
southwestern Athabasca Basin in northern Saskatchewan, where several new discoveries, including the
Arrow and Tripe R Uranium deposits have been made. The CLR Project is 5km east of the Cluff Lake Road
(Hwy 955), which leads to the historic Cluff Lake Mine, which historically produced approximately
62,000,000lbs of yellowcake uranium.
Exxeter Gold Project covers an area of 715ha located in Val d’Or Quebec, one of the premier gold camps
in the world which produced over 113.4M oz Au by the end of 2019. The project covers 3.8km of the
Cadillac Tectonic zone, which is the principal geologic structure responsible for cold mineralization in the
Val d’Or.
For further information, contact the Company at [email protected], or visit the Company’s website
at www.kiplinmetals.com.
On behalf of the Board,
Kiplin Metals Inc.
For further information, contact the Company at 604-622-1199.
On behalf of the Board of Directors,
“Peter Born”
Director
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other
than statements of historical fact, are to be considered forward looking. Although the Company believes the expectations
expressed in such forward -looking statements are based on reasonable assumptions, such statements are not guarantees of
future performance and actual results or developments may di ffer materially from those in forward -looking statements. There
can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation
of such uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the
applicable laws.