Aldever Applies FOR Permits FOR Urban Barry Drilling
ALDEVER RESOURCES INC. 2200 HSBC Building – 885 West Georgia St, Vancouver, BC, V6C 3E8 www.aldever.com
ALDEVER APPLIES FOR PERMITS FOR URBAN BARRY DRILLING
May 3, 2017
Aldever Resources Inc. (ALD—TSXV) (ALDVF—OTCQB) (17G1—Frankfurt) (“Aldever” or the “Company”) is pleased
to announce that it has submitted the necessary applications for the diamond drilling of its 100% owned Urban Barry
Gold Project, located in central Quebec. The Urban Barry Gold Camp is one of Canada’s premier exploration regions,
principally as a result of recent gold discoveries made by Bonterra Resources. The area hosts two historical gold
deposits, the Windfall Deposit, controlled by Osisko, and the Barry Deposit, controlled by Metanor. Of interest, all
of the deposits in the Urban Barry Gold Camp are associated with one of two region al breaks in the Abitibi
Greenstone rock, both of which bisect and converge on Aldever’s ground, which is surrounded on all sides by claims
controlled by Osisko.
Phase 1 is to include a twenty-five (25) line kilometer Induced Polarization survey and high definition magnetometer
survey over the Urban Barry Deformation Zone, where anomalous mineral values (up to 62 g/tonne Ag and 0.127g/
tonne gold) were obtained in the 2016 programs. The silver results are extremely int eresting as 18 of the samples
returned values higher than 10g/t Ag, with the highest value representing more than 1.8oz/t Ag . These grades,
coupled with silver’s relative immobility, suggest a nearby source of mineralization. Outcrop samples had gold values
ranging from trace to 0.03g/t Au.
Phase 2 calls for 6000 meters of diamond drilling comprised of twenty 300 meter holes, designed to follow up on
soil and geophysical anomalies.
About Aldever
Aldever controls 1,297ha in the Urban Barry Mining district, Quebec, approximately 18 kilometers east of, and within
the same geological district as, Osisko’s Windfall Lake Deposit, which has an estimated mineral resource*of 748,000
ounces of gold at 8.42 g/t gold in the indicated category, and 860,000 ounces of gold at 7.62 g/t gold in the inferred
category.
* Source: Oban Mining Corporation website - SRK (Canada) November 2014 Technical Report. These estimates of gold resources
are sourced from publicly available materials and are not located on the Urban Barry Property. Aldever has not undertaken any
independent investigation of the production/resource estimates, nor has it independently analyzed the publicly available results.
The Company’s Urban Barry Property (UB) is situated within the Urban -Barry Greenstone Belt and lies within the
eastern portion of the Abitibi Subprovince which has an east -west extent of approximately 135 kilometers and
ranges from 4 to 20 kilometers in width along its strike extent. Lithological units within this terrane include sequences
of basalt flows with intercalated felsic rhyoliti es to more mafic volcaniclastic rocks that have been deformed and
metamorphosed to the greenschist facies. The volcaniclastic sequence has been intruded by syn -volcanic to late
(post mineralization) intrusions. Dominant structural fabric s trend to the northeast, with variable dips betw een 30
to 85° to the southeast. The princip al exploration target at the UB Project is a seven -kilometer strike length of
regional scale faulting of the Abitibi Greenstone Belt which lies within the UB Property bounds.
The technical contents of this news release have been reviewed by Abby Peterson, P. Geo. Ms. Peterson is registered
in the Province of Quebec, is a Qualified Person as defined by NI 43-101 and has approved this news release.
For further information,
please contact:
Clive Massey, President
Aldever Resources Inc.,
Phone: (604) 644-6794
or (604) 622-1199
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
This press release contains "forward -looking information" that is based on Aldever’s cu rrent expectations, estimates, forecasts
and projections. This forward-looking information includes, among other things, statements with respect to Aldever’s exploration
and development plans. The words "will", "anticipated", "plans" or other similar words and phrases are intended to identify
forward-looking information. Forward-looking information is subject to known and unknown risks, uncertainties and other factors
that may cause Aldever’s actual results, level of activity, performance or achievements to be materially different from those
expressed or implied by such forward -looking information. Such factors include, but are not limited to: uncertainties related
exploration and development; the ability to raise sufficient capital to fund exploration and d evelopment; changes in economic
conditions or financial markets; increases in input costs; litigation, legislative, environmental and other judicial, regulat ory,
political and competitive developments; technological or operational difficulties or inability to obtain permits encountered in
connection with exploration activities; and labour relations matters. This list is not exhaustive of the factors that may aff ect our
forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance
on such forward -looking information. Aldever disclaims any intention or obligation to update or revise forward -looking
information, whether as a result of new information, future events or otherwise