Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KIB.V ·

Kiboko resumes 11,000 m over 67 holes Phase 1 drill program at its Harricana Gold Project located near Val-d’Or, Québec

Exploration Programs

KIBOKO GOLD INC.

#201 – 1405 St Paul Street

Kelowna, British Columbia V1Y 2E4

+1 (778) 381-5949

www.kibokogold.com

All amounts are in Canadian dollars, unless otherwise stated.

Kiboko resumes 11,000 m over 67 holes Phase 1 drill program at its

Harricana Gold Project located near Val-d’Or, Québec

Kelowna, British Columbia (January 13, 2023) – Kiboko Gold Inc. (TSXV: KIB) (“Kiboko” or the

“Company”) is pleased to announce that a diamond drill rig has been mobilized to site to continue

the Company’s systematic Phase 1 exploration program at its Harricana Gold Project. The Harricana

Gold Project (the “Project” or “Harricana Project”) is located 55 kilometres north of Val-d’Or,

Québec, in the world-renowned Abitibi gold belt.

Highlights:

- 11,000 m over 67 holes expected to be drilled in Phase 1

- 8,212 m of drilling over 55 holes drilled in 2022

- 2,800 m over 12 holes planned in Q1/23

- Reporting of assay results from 2022 drilling expected soon

- Maiden mineral resource targeted for Q2/2023

Phase 1 program of 11,000 m over 67 drill holes expected to be completed in Q1/2023

Between mid-September and late November 2022, a total of 8,212 metres (“m”) were drilled over

55 holes at the Fontana area of the Project, using both HQ diamond core and reverse circulation

(“RC”) drilling.

A diamond drill rig has been mobilized to site to complete the winter portion of the Phase 1

exploration program. The winter program consists of 12 orientated HQ diamond drill holes totaling

2,800 m for a total Phase 1 program of approximately 11,000 m over 67 holes.

Reporting of assay results expected soon

A portion of the assay results from drilling in 2022 have been received. The Company is in the

process of reviewing the results and expects to provide a summary shortly.

Maiden mineral resource targeted for second quarter of 2023

The Company believes that the areas targeted in the Phase 1 exploration program have the

potential to support a near-surface, pit-constrained mineral resource estimate. The Company

continues to target reporting a maiden mineral resource for a portion of the Fontana area of the

Harricana Project in the second quarter of 2023.

Trading Symbol: TSXV: KIB

2 | KIBOKO GOLD INC.

Exploration intended to verify historical Fontana drilling and partially validate Exploration Targets

The Phase 1 program is intended to verify a significant portion of the 79,565 m of historical Fontana

area drilling, characterize gold mineralization in the wall rock surrounding the main vein systems,

and partially validate the Fontana area Exploration Targets (as defined herein).

The near surface Exploration Targets for the Fontana area of the Project total 13.6 million to 23.1

million tonnes at a range of grades of 3.0 to 3.4 grams of gold per tonne (“g/t Au”). All of the

Exploration Targets for the Harricana Project are summarized in Table 1 at the end of this release.

The Company cautions that while the Exploration Targets are based upon results from historical

drilling, the potential quantity and grade of the Exploration Targets are conceptual in nature, there

has been insufficient verifiable exploration to define a mineral resource, and it is uncertain if further

exploration will result in any of the Exploration Targets being delineated as a mineral resource.

The Phase 1 exploration program is only intended to partially validate a portion of the Exploration

Targets for the Fontana area of the Project, which does not have any mineral resources or mineral

reserves. For further details regarding scientific or technical information relating to the Harricana

Project, including the recommended exploration programs to validate the Exploration Targets,

please refer to the technical report entitled “Harricana Gold Project Technical Report, Duverny

Township, Québec” with an effective date of April 1, 2022, and an issue date of May 2, 2022 (the

“Harricana Technical Report”), which is filed under the Company’s SEDAR profile at

www.sedar.com.

Additional information about Kiboko and its Harricana Gold Project can be found on SEDAR at

www.sedar.com and on the Company’s website at www.kibokogold.com.

Qualified Person

Ivor W.O. Jones, B.Sc. (Hons), M.Sc., FAusIMM, P. Geo., Vice-President Technical Services & Project

Evaluation of Kiboko, is the Company’s designated Qualified Person within the meaning of National

Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr. Jones has

reviewed and approved the pertinent technical or scientific disclosure in this news release.

About Kiboko Gold Inc.

Kiboko is a Canadian-based gold exploration company focussed on advancing it’s 102 km2

Harricana Project, located 55 km north of Val-d’Or, Québec, within the world-renowned southern

Abitibi gold belt. Kiboko’s shares trade on the TSX Venture Exchange under the symbol “KIB”.

For further information, please contact:

Jeremy Link

President and CEO

[email protected]

+1 (778) 381-5949 x 1

Brad Boland

Executive Vice-President & CFO

[email protected]

+1 (778) 381-5949 x 2

Trading Symbol: TSXV: KIB

3 | KIBOKO GOLD INC.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

This news release includes certain “forward-looking statements” which are not comprised of historical facts. Forward

looking statements include estimates and statements that describe the Company’s future plans, objectives or goals,

including words to the effect that the Company or management expects a stated condition or result to occur.

Forward looking statements may be identified by such terms as “believes”, “anticipates”, “expects”, “estimates”,

“may”, “aims”, “targets”, “could”, “would”, “will”, or “plan”. Since forward-looking statements are based on

assumptions and address future events and conditions, by their very nature they involve inherent risks and

uncertainties. Although these statements are based on in formation currently available to the Company, the

Company provides no assurance that actual results will meet management’s expectations. Risks, uncertainties, and

other factors involved with forward-looking information could cause actual events, results, performance, prospects

and opportunities to differ materially from those expressed or implied by such forward looking information.

Forward looking information in this news release includes, but is not limited to the Company’s objectives, goals or

future plans, statements, exploration results, potential mineralization, verification of historical drilling results; the

Company’s cost estimates and plans to execute and complete its Phase 1 exploration program including the

completion of a maiden mineral resource; exploration and mine development plans; and the timing of the

commencement of operations and estimates of market conditions. Factors that could cause actual results to differ

materially from such forward-looking information include, but are not limited to failure to identify mineral resources,

the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental,

environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations

and other Indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future,

changes in equity markets, inflation, scarcity and cost of skilled and unskilled labour, changes in exchange rates,

fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying

significantly from estimates and the other risks involved in the mineral exploration and development industry, an

inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited

to the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and travel

and supply chains, and those risks set out in the Company’s public documents filed on SEDAR. Although the

Company believes that the assumptions and factors used in preparing the forward-looking information in this news

release are reasonable, undue reliance should not be placed on such information, which only applies as of the date

of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all.

The Company disclaims any intention or obligation to update or revise any forward-looking information, whether

as a result of new information, future events or otherwise, other than as required by law.

Trading Symbol: TSXV: KIB

4 | KIBOKO GOLD INC.

Table 1: Harricana Gold Project – Near Surface Exploration Targets Summary

Material Tonnage Range Grade Range

Project Area (millions) (g/t Au)

Vein

Fontana 10.9 – 15.4 3.5 – 4.3

Monpas 3.0 – 4.2 2.1 – 4.8

Duvay 2.2 – 2.5 2.8 – 5.7

Wall Rock

Fontana 2.7 – 7.7 0.9 – 1.6

Monpas 0.7 – 2.1 0.9 – 1.6

Duvay 0.5 – 1.2 0.9 – 1.6

Vein + Wall Rock Combined

Fontana 13.6 – 23.1 3.0 – 3.4

Monpas 3.7 – 6.3 1.9 – 3.7

Duvay 2.7 – 3.7 2.4 – 4.4

Total Harricana Gold Project 20.0 – 33.1 2.7 – 3.6

The Company cautions that while the Exploration Targets are based upon the results from 784

historical diamond drillholes totalling 108,681 m of drilling, the potential quantity and grade of the

Exploration Targets are conceptual in nature, there has been insufficient verifiable exploration to

define a mineral resource, and it is uncertain if further exploration will result in any of the Exploration

Targets being delineated as a mineral resource. For additional information regarding the

Exploration Targets, please review sections 9.4 – Exploration Targets and 26 - Recommendations in

the Harricana Technical Report that is available on the Company’s website (www.kibokogold.com)

and under its profile on SEDAR (www.sedar.com).