Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KGS.V ·

Kingman Engages Godbe Drilling FOR Mohave GOLD Project Phase Ii Program

Exploration Programs

TSX: KGS.V

FSE: 47A1

OTCQB:

KGSSF

KINGMAN ENGAGES GODBE DRILLING FOR MOHAVE GOLD

PROJECT PHASE II PROGRAM

Vancouver, B.C. ( September 14, 2021) Kingman Minerals Ltd. (“Kingman” or the “Company”)

(TSX.V: KGS, FSE: 47A1, OTCQB: KGSSF) is pleased to announce that is has engaged Godbe Drilling

to conduct the Phase II drill program on the Mohave Gold Project in Arizona, USA. The program consists

of an initial five holes and is permitted for up to 24, which will be completed over the coming months.

Mohave Project Update

Kingman completed two underground reconnaissance programs (2020) and an initial drill campaign (Phase

I – March 2021 ) to verify mining and exploration data on the historic Rosebud Mine and property. The

program was designed to investigate the nature, extent and validity of the historic resource. The drill pro-

gram was highly successful in locating vein structures, historic workings and the assays confirmed histori-

cally reported values. The reconnaissance and drill programs also encountered a significant underground

development indicating a productive mine life with reserve potential still untapped. Based on these encour-

aging results, the Company expanded the Project from the initial 20 lode claims to 71 lode claims surround-

ing not only the historic Rosebud Mine, but also the past producing Music Mountain Mine.

Figure 1 – The expanded Mohave Project; yellow shows the original 20 claims, blue shows the expanded project area

and green is the Music Mountain Mine area.

TSX: KGS.V

FSE: 47A1

OTCQB:

KGSSF

Details of each of the five holes drilled in Phase I were reported in news releases on February 26, March

5, March 12, March 24, March 26, March 30, April 1, April 7, April 9, and April 16, 2021. The success of the

drill program warrants further exploration and development of the Mohave Project in previously unexplored

zones.

Phase II Preparation

The technical team has thoroughly reviewed the data and knowledge from prior phases, revisited the his-

torical data and evaluated the structural and lithological controls on mineralization as per drone survey.

With encouraging results and an ambitious strategy in place, the company will conduct its 24-hole program

on a step-by step basis, while carefully monitoring the results of drilling with the performance of the gold

bull market over the coming months . Drilling will start testing the extension of the auriferous vein system

present at and close to surface as well as the deeper level s of a potential precious metals and/or base

metal ore body.

Dr. Peter Born, P. Geo , Qualified Person for Kingman Minerals Ltd. and President and CEO states: “The

Mohave Project deserves to be advanced to uncover its true geological potential. There is no better hedge

against discovery failure than two past-producing mines; one of which is located on the Mohave Project

area and one right proximal to it. Our extensive data room put together over the past two years shows

enormous exploration upside. The market also favours pursuing this exceptional opportunity further and we

expect to bring increased shareholder value with this next program.”

About Kingman

Kingman Minerals Ltd. is currently engaged in the business of precious metal mineral exploration for the

purpose of acquiring and advancing non grass roots mineral properties located in mining friendly

jurisdictions of North America. The Mohave Project (the “Project”) is located in the Music Mountains in

Mohave County, Arizona and is comprised of 71 lode claims which are inclusive of the past producing

Rosebud Mine (the “Rosebud”). High-grade gold and silver veins were discovered in the area in the 1880’s

and were mined mainly in the late 20’s and 30’s. Underground development on the Rosebud property in-

cluded a 400-foot shaft and approximately 2,500 feet of drifts, raises and crosscuts.

For further information please contact:

Arthur Brown, Chairman and Director

(778) 319-2261

www.kingmanminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Ven ture

Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward -looking

information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that

could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or imp lied by

such forward -looking information. Forward -looking information in this news release includes statements regarding, amo ng other

things, the completion transactions completed in the Agreement. Factors that could cause actual results to differ materially from such

forward-looking information include, but are not limited to, regulatory approval processes. Although Kingman bel ieves that the

assumptions used in preparing the forward -looking information in this news release are reasonable, including that all necessary

regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies

as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all.

Kingman disclaims any intention or obligation to update or revise any forward -looking information, whether as a result of new infor-

mation, future events or otherwise, other than as required by applicable securities laws.