Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KG.V ·

Klondike Gold Discovers 300-meter Southeastern Extension to Stander Zone in Drilling Including 21.50 g/t Au over 4.0 meters (Including 76.07 g/t Au Over 1.0 Meter and 9.50 g/t Au Over 1.0 Meter) and 4.84 g/t Au

Drill Results

October 29, 2024

Vancouver, BC, Canada

Klondike Gold Discovers 300-meter Southeastern

Extension to Stander Zone in Drilling Including 21.50 g/t

Au over 4.0 meters (Including 76.07 g/t Au Over 1.0

Meter and 9.50 g/t Au Over 1.0 Meter) and 4.84 g/t Au

over 9.0 Meters (Including 35.44 g/t Au over 0.5 Meter)

Klondike Gold Corp. (TSX.V: KG; FRA: LBDP; OTCQB: KDKGF) (“Klondike Gold” or the “Company”) is

pleased to announce eleven drill hole results which tested for a southeastern extension of Stander

Zone gold mineralization within the Company’s 100% owned 727 km2 Klondike District Property (the

“Property”) in the Dawson mining district, Yukon, Canada. (see Figure 1).

Highlights Summary

• High grade gold-bearing quartz vein zones with in the Stander Zone southeastern extension

demonstrate significant lateral and down -dip continuity. These new intersections correlate

well with those mapped within the Stander Zone MRE.

• EC24-534 intersected a quartz vein zone averaging 21.50 g/t Au over 4.0 meters from 96.50

meters including individual quartz veins assaying 76.07 g/t Au ( 2.45 opt Au) over 1.0m and

9.54 g/t Au over 1.0m.

• EC24-541 intersected a quartz vein zone averaging 4.84 g/t Au over 9.0m from 118.0m

including two high grade intervals of 35.44 g/t Au over 0.50m and 18.59 g/t Au over 0.60m.

• Mineralization intersected in these drill holes remains open to depth and along strike.

• Additional drill results are pending.

Peter Tallman, Klondike Gold’s President & CEO states ; “ These results reveal a 300 -meter strike

extension to the stacked high grade gold quartz vein zones that is the economic target within the

Stander Zone. This drilling adding 50% to the southeastern strike length of Stander Zone

mineralization with these high -grade intervals is an excellent result and a significant predictive

success by the exploration team. Our work continues to demonstrate the considerable unrealized

economic potential of the Klondike District Property as we unlock and derisk the value for our

shareholders.”

In 2024 the Company conducted a resource expansion and discovery drill program targeting Stander

Zone gold mineralization as outlined in the Company’s November 10, 2022 Mineral Resource

Estimate (“MRE”)1. A total of 26 holes for 4,160.52m were completed in this overall program divided

into phases targeting specific Stander Zone adjacent subareas.

Eleven core holes reported here (EC24-518 to EC24-520, EC24-532, EC24-535, and EC24-38 to EC24-

541) tested a 300 meter southeastern strike length for continuity of gold mineralization beyond the

2022 Stander Zone MRE extents. These holes successfully intersected significant intervals of high

grade gold mineralization to extend the strike length of the Stander Zone 300 meters to the southeast

beyond the 600 -meter length of the MRE extents. Summary results are shown in Table 1 and drill

hole collar locations are shown in Figure 1.

Table 1: Summary of Significant Gold Intervals at Stander Zone Eastern Extension

Hole ID From (m) To (m) Interval (m) Au (g/t)

EC24-518 38.00 39.50 1.50 2.60

EC24-519 23.20 26.00 2.80 1.08

And 59.50 60.15 0.65 11.15

EC24-520 127.00 129.00 2.00 0.63

EC24-532

No significant

assay

EC24-533 49.00 54.00 5.00 1.48

Including 50.00 50.50 0.50 9.67

EC24-534 96.50 100.50 4.00 21.50

Including 96.50 97.50 1.00 9.54

And 99.50 100.50 1.00 76.07

EC24-535 61.50 62.50 1.00 2.13

EC24-538

No significant

assay

EC24-539 45.50 50.00 4.50 0.77

Including 49.00 50.00 1.00 2.26

And 80.50 83.00 2.50 6.51

Including 82.00 83.00 1.00 11.79

EC24-540 42.50 43.50 1.00 5.63

And 53.00 56.00 3.00 1.87

EC24-541 118.00 127.00 9.00 4.84

Including 124.00 124.50 0.50 35.44

And 125.50 126.10 0.60 18.59

The intersection lengths reported here are estimated true widths (“ETW”) 2. These 2024 results are

not included in the Company’s November 10, 2022 Stander Zone mineral resource estimate (“MRE”)1

which was based upon 40 initial holes completed from 2015 through 2021 using a gold price of $1,700

USD and a 0.2 g/t Au cut-off.

Figure 1: 2024 Stander Zone program drill hole location map with 2022 MRE pit outline for

reference. Drill holes in this release are labelled.

Discussion

New understanding of the Stander Zone and deeper drilling in 2024 has demonstrated multiple

stacked gold-bearing ‘quartz vein zones’ exhibiting along-strike and 35o dip continuity. New drilling

reported in this news release has intersected high grade quartz vein zones continuing 300 meters to

the southeast beyond the extent of the Mineral Resource area. This follows the previous news release

(see NR 22 October, 2024) reporting extension of mineralization adjacent and beneath the Mineral

Resource with similar high gold grades.

The Stander Zone mineralization is associated with a 5 kilometer corridor of mineralization adjacent

the major Eldorado Fault now recognized by the Company to be a master control of orogenic gold

mineralization within the Klondike District.

Figure 2: Location of Stander Zone MRE area and other significant nearby gold showings along the

Eldorado Fault.

The overall objectives of 2024 Klondike District Property drill testing at Stander Zone include:

• Diamond drilling to test for expansion of the Stander Zone mineral resource area , and

specifically to follow up high grade (>1 opt Au) gold drill intersections from late 2023; with 7

drill holes still pending.

• Diamond drilling to test for expan sion of extents of Gay Gulch Showing gold mineralization;

with 6 drill holes still pending.

• Prospecting and drill testing for repeated stacked gold -bearing quartz vein zones predicted

by orogenic gold deposit models, targeting potential for deeper gold mineralization.

Figure 3: Klondike District Property extent with location of Stander Zone exploration area (purple

outline) near Dawson.

QUALIFIED PERSON

The technical and scientific information contained within this news release has been reviewed and

approved by Peter Tallman, P.Geo., President and CEO of Klondike Gold and Qualified Person as

defined by NI 43-101 policy. Detailed technical information, specifications, analytical information and

procedures can be found on the Company’s website.

ABOUT KLONDIKE GOLD CORP.

Klondike Gold is a Vancouver based gold exploration company advancing its 100% -owned Klondike

District Gold Project located at Dawson City, Yukon, one of the top mining jurisdictions in the

world. The Klondike District Gold Project targets gold associated with district scale orogenic faults

along the 55-kilometer length of the famous Klondike Goldfields placer district. Multi-kilometer gold

mineralization has been identified at both the Lone Star Zone and Stander Zone, among other

targets. The Company has identified a Mineral Resource Estimate of 469,000 Indicated and 112,000

Inferred gold ounces 1, a milestone first for the Klondike District. The Stander Zone (“MRE”) was

published November 10, 2022 based upon 40 initial holes completed from 2015 through 2021 using

a gold price of $1,700 USD and a 0.2 g/t Au cut-off.

The Company is focused on exploration and development of its 727 square kilometer property

accessible by scheduled airline and government-maintained roads located on the outskirts of Dawson

City, Yukon, within the Tr’ondëk Hwëch’in First Nation traditional territory.

ON BEHALF OF KLONDIKE GOLD CORP.

“Peter Tallman”

Peter Tallman,

President and CEO

FOR FURTHER INFORMATION:

Telephone: (604) 609-6138

E-mail: [email protected]

Website: www.klondikegoldcorp.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

1 The Mineral Resource Estimate for the Klondike District Property was prepared by Marc Jutras, P.Eng., M.A.Sc.,

Principal, Ginto Consulting Inc., an independent Qualified Person in accordance with the requirements of NI 43 -101.

The technical report supporting the Mineral Resource Estimate entitled “NI 43 -101 Technical Report on the Klondike

District Gold Project, Yukon Territory, Canada” has been filed on SEDAR at www.sedarplus.ca effective November 10,

2022. Refer to news release of December 16, 2022.

2 Estimated True Widths for reported vein intercepts are based on oriented core measurements of

individual veins where available or measured angles perpendicular to vein margins, and/or 3D models of

vein intercepts. The measured and model average “sheeted extensional vein” dip is 35o northeasterly, and

typical drill hole dip angle is 55 o southwesterly. Other potentially oblique gold- mineralized veins (eg.

“quartz breccia veins”) may be present. D ifferences between in dividual ETWs and down- hole interval

lengths may vary between drill holes depending on drill hole azimuth and inclination, variations in vein

zone strike and dip, and overall geometries of the different vein systems.

Certain statements contained in this news rele ase constitute “forward -looking statements”. When

used in this document, the words “anticipated”, “expect”, “estimated”, “forecast”, “planned”, and

similar expressions are intended to identify forward- looking statements or information. These

statements are based on current expectations of management, however, they are subject to known

and unknown risks, uncertainties and other factors that may cause actual results to differ materially

from the forward-looking statements in this news release. Readers are cautioned not to place undue

reliance on these statements. Klondike Gold does not undertake any obligation to revise or update

any forward-looking statements as a result of new information, future events or otherwise after the

date hereof, except as required by securities laws.

Forward-looking statements involve numerous risks and uncertainties and actual results might differ

materially from results suggested in any forward -looking statements. These risks and uncertainties

include, among other things, market v olatility; the state of the financial markets for the Company ’s

securities; fluctuations in commodity prices and changes in the Company’s business plans. In making

the forward looking statements in this news release, the Company has applied several material

assumptions that the Company believes are reasonable, including without limitation, that the

Company will continue with its stated business objectives and its ability to raise additional capital to

proceed. Although management of the Company has attempte d to identify important factors that

could cause actual results to differ materially from those contained in forward-looking statements or

forward-looking information, there may be other factors that cause results not to be as anticipated,

estimated or intended. There can be no assurance that such statements will prove to be accurate, as

actual results and future events could differ materially from those anticipated in such statements.

Accordingly, readers should not place undue reliance on forward- looking statements and forward-

looking information. Readers are cautioned that reliance on such information may not be appropriate

for other purposes. The Company does not undertake to update any forward- looking statement,

forward-looking information or financial out-look that are incorporated by reference herein, except in

accordance with applicable securities laws. The Company seeks safe harbor.

For more information on the Company, investors should review the Company’s continuous disclosure

filings that are available at www.sedarplus.ca.