Klondike Gold Drills 30.97 g/t Au (1.0 oz/t Au) over 0.5 meters and also 1464 g/t Ag (47.1 oz/t) over 3.52 meters
3123 – 595 BURRARD STREET
VANCOUVER, B.C. CANADA V7X 1J1
TELEPHONE: 604-609-6138
FAX: 604-609-6145
WWW.KLONDIKEGOLDCORP.COM
Klondike Gold Drills 30.97 g/t Au (1.0 oz/t Au) over 0.5 meters and
also 1464 g/t Ag (47.1 oz/t) over 3.52 meters
March 24, 2022 TSX Venture Exchange Symbol – KG
Vancouver, British Columbia, Canada, March 24, 2022, Klondike Gold Corp. (TSX.V: KG; FRA:
LBDP; OTCQB: KDKGF) (“Klondike Gold” or the “Company”) is pleased to report results of 2021
Phase 4 diamond drilling at its Klondike District Property, located in the Dawson Mining District,
Yukon, Canada. Phase 4 tested for mineralization associated with graphitic thrust faults over a 4
km strike length along Eldorado Creek including at the Gay Gulch gold showing.
Highlights from Phase 4 drilling along Eldorado Creek include:
• 1,464 g/t Ag (47.1 oz/t Ag) over 3.52 meters from 77.25 meters in EC21-436
• 30.97 g/t Au over 0.5 meters from 40.0 meters in EC21-439 at Gay Gulch Showing
Peter Tallman, Klondike Gold’s CEO states “ The multi-ounce silver intersection in EC21 -436 is
exciting. To the best of our knowledge, this is the first like it in the Klondike District and is
associated with the major Eldorado Creek thrust fault adjacent to the Gay Gulch gold showing.
We look forward to follow-up drill testing in this area of Eldorado Creek in 2022.”
ELDORADO CREEK AREA PHASE 4 DRILLING
Phase 4 drilling test ed over a lateral distance of 4.0 km targeting graphitic thrust f aults along
Eldorado Creek. Thirteen (13) holes totalling 886 meters were completed in October 2021. Phase
4 drilling follows from the identification in 2021 by the Company’s geology team of major
graphitic thrust faults at the Lone Star Zone and Stander Zone associated with the persistence of
gold-bearing sheeted quartz veins intersected in Phase 2 - Lone Star Zone (see News Releases
September 22, 2022 and September 27, 2022) and Phase 3 - Stander Zone (see News Release
March 1, 2022) drilling adjacent to these faults.
The objective of Phase 4 was to determine if observed graphitic outcrops along Eldo rado Creek
including at Gay Gulch gold showing were associated with thrust faults, determine their
orientation, and test for presence of mineralization. See Figure 1 and Figure 2 for Phase 4 drill
hole locations and Table 1 for significant assay results.
Page 2 of 6
The Phase 4 drill program was successful in extending gold mineralization at the Gay Gulch
showing. EC21-439 intersected sheeted gold-bearing quartz veins hosted within and adjacent a
graphitic thrust fault with the best individual assay of 30.97 g/t A u over 0.50 meters from 40.0
meters downhole. Additionally, EC21-440 intersected sheeted gold-bearing quartz veins across
a broader interval, interpreted to be a ‘mineralization halo’ that assayed 0.29 g/t Au over 30.0
meters from 33.0 meters downhole. I ntersections are approximately true width based on
oriented core measurements of gold bearing veins.
The Phase 4 drill program also intersected high grade silver -tungsten mineralization hosted
within graphitic fault breccia located adjacent to the Gay Gulch showing. EC21-436 assayed 1,464
g/t silver (47.1 oz/t silver) with 0.8% tungsten over 3.52 meters from 77.25 meters in EC21 -436.
The true width of this intersection is unknown based on this one intersection point. The fault and
high grade silver mineralization intersected by EC21-436 remains open in all directions.
Table 1: 2021 Eldorado Creek (Phase 4) Significant Results:
Hole ID From
(m) To (m) Grade (g/t
Au)
Grade (g/t
Ag)
Length
(m)
EC21-433 nsa
EC21-434 nsa
EC21-435 nsa
EC21-436 77.25 80.77 1464 3.52
EC21-437 nsa
EC21-438 nsa
EC21-439 40.00 44.50 3.61 4.50
including 40.00 40.50 30.97 0.50
EC21-440 33.00 63.00 0.29 30.00
including 43.00 50.00 0.46 7.00
EC21-441 49.00 50.00 1.33 1.00
EC21-442 nsa
EC21-443 nsa
EC21-444 nsa
EC21-445 32.00 33.00 3.82 1.00
*nsa= no significant assay
Collar locations are shown in Figures 1 and 2 below.
Page 3 of 6
Figure 1: Phase 4 drill holes along central Eldorado Creek (downslope of the Stander Zone
‘main’ subarea shown in upper right).
Page 4 of 6
Figure 2: Phase 4 drill holes along southeast Eldorado Creek including the Gay Gulch showing.
UPCOMING EVENTS
Klondike Gold Corp will be participating in the following upcoming events:
Red Cloud Financial Services hosted Webinar – April 2, 2022
Metals Investor Forum, Toronto – June 11 to June 12, 2022
PDAC Convention, Toronto – June 13 to June 15, 2022
All events are subject to change.
Upcoming corporate milestones include near- term completion and release of a Geology
Technical Report followed thereafter in 2022 by completion of a mineral resource at the Lone
Star Zone. Field work with 8,000 meters diamond drilling is planned to commence in May 2022.
Page 5 of 6
2021 ASSAY PROTOCOLS
All 2021 drill holes referenced in this release produced NTW (5.71 cm dia.) drill core. Assay
samples from drill core are cut using a diamond saw. Half the core sample interval is bagged,
tagged, and sealed; the other half is returned to the core box with a corresponding tag retained
for reference. Two gold reference standards, two blank samples (a coarse and a fine), and a
coarse sample duplicate per 100 samples, are routinely inserted as part of Klondike Gold’s quality
assurance / quality control (“QA/QC”) program, independent of and additional to the laboratory
QA/QC program.
Sample bags are aggregated into rice bags, sealed, and submitted by Klondike Gold personnel to
Bureau Veritas Mineral Laboratories (“BV L abs”) preparation facility in Whitehorse, YT with
chemical analysis of sample pulps completed in Vancouver, British Columbia. Bureau Veritas Labs
is an accredited ISO 9001:2008 full-service commercial laboratory.
At BV Labs each drill core sample is crush ed to 8 0% passing 2 mm size. A 500 g subsample is
pulverized to >85% passing -75 microns size (200 mesh; c ode PRP70-500). All samples of 500 g
are sieved to 106 microns (140 mesh) for “metallic screen” assaying. The +140 mesh fraction is
weighed and assayed for gold by fire assay (“FA”) fusion with a gravimetric finish (code FS631). A
30 g subsample of the -140 mesh fraction is assayed for gold by fire assay (“FA”) fusion with an
atomic absorption (“AA”) finish (code FA430). All over-limit results in excess of 10 ppm (10 g/t)
for both silver and gold are re -assayed using a 30 g subsample and assayed by FA with a
gravimetric finish (c ode FA530 -Au/Ag). Total gold grade is then calculated using a weighted
average of the plus and minus fraction assay results . Samples were also analyzed for multi-
element chemistry , including copper and tungsten, by ultratrace ICP -MS analysis (AQ251+U
code). Samples over -limit in lead are rerun by a high -detection limit ICP -ES procedure (Code
MA370).
QUALIFIED PERSONS REVIEW
The technical and scientific information contained within this news release has been reviewed
and approved by Peter Tallman, P.Geo., President of Klondike Gold Corp. and Qualified Person as
defined by National Instrument 43 -101 policy. Detailed technical information, specifications,
analytical information and procedures can be found on the Company’s website.
ABOUT KLONDIKE GOLD CORP.
Klondike Gold Corp. is a Vancouver based gold exploration company advancing its 100% -owned
Klondike District Gold Project lo cated at Dawson City, Yukon Territory, one of the top mining
jurisdictions in the world. The Klondike District Gold Project targets gold associated with district
scale orogenic faults along the 55 -kilometer length of the famous Klondike Goldfields placer
district. To date, multi- kilometer gold mineralization has been identified at both the Lone Star
Zone and Stander Zone, among other targets. The Company is focused on exploration and
development of its 586 square kilometer property accessible by schedule d airline and
Page 6 of 6
government-maintained roads located on the outskirts of Dawson City, YT within the Tr’ondëk
Hwëch’in First Nation traditional territory.
ON BEHALF OF KLONDIKE GOLD CORP.
“Peter Tallman”
President and CEO
(604) 609-6138
E-mail: [email protected]
Website: www.klondikegoldcorp.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Disclaimer for Forward-Looking Information
“This press release contains “forward-looking information” and “forward-looking statements” within the meaning of
applicable securities laws. This information and statements address future activities, events, plans, developments
and projections. All statements, other than statements of historical fact, constitute forward- looking statements or
forward-looking information. Such forward- looking information and statements are frequently identified by words
such as “may,” “will,” “should,” “anticipate,” “plan,” “expect,” “believe,” “estimate,” “intend” and similar
terminology, and reflect assumptions, estimates, opinions and analysis made by management of Klondike in light of
its experience, current conditions, expectations of future developments and other factors which it believes to be
reasonable and relevant. Forward- looking information and statements involve known and unknown risks and
uncertainties that may cause Klondike’s actual results, performance and achievements to differ materially from those
expressed or implied by the forward-looking information and statements and accordingly, undue reliance should not
be placed thereon.
Risks and uncertainties that may cause actual results to vary include but are not limited to the availability of
financing; fluctuations in commodity prices; changes to and compliance with applicable laws and regulations,
including environmental laws and obtaining requisite permits; political, economic and other risks; as well as other
risks and uncertainties which are more fully described in our annual and quarterly Management’s Discussion and
Analysis and in other filings made by us with Canadian securities regulatory authorities and available at
www.sedar.com. Klondike disclaims any obligation to update or revise any forward- looking information or
statements except as may be required.”