Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KG.V ·

Klondike Gold Commences 2018 Drilling

Exploration Programs

3123 – 595 BURRARD STREET

VANCOUVER, B.C. CANADA V7X 1J1

TELEPHONE: 604-609-6110

FAX: 604-609-6145

WWW.KLONDIKEGOLDCORP.COM

Klondike Gold Commences 2018 Drilling

May 24, 2018 TSX Venture Exchange Symbol – KG

Vancouver, British Columbia, Canada, May 24, 2018 , Klondike Gold Corp. (TSX.V: KG; FRA: LBDP)

(“Klondike Gold” or the “Company”) is pleased to announce the commencement of its 2018 diamond drill

program at the Company’s wholly owned Klondike District property, Yukon Territory. A minimum total of

$2.5 million is budgeted for 2018 including an estimated 5,000 meters of drilling (see March 9, 2018 news

release). All major work contracts have been finalized, with work components underway or scheduled to

begin early in June. The Company has completed a structural and geological compilation, producing the

first geology map of the Klondike District subdividing previously “Undifferentiated Klondike Schist”, which

will help focus exploration efforts on the most prospective geologic targets. The Company welcomes Ian

Perry, P. Geo. to fill the role of Vice President, Exploration.

Summary

• 2018 diamond drill program has commenced at the Lone Star Zone. An estimated 5,000 meters of

drilling is planned to test the Lone Star Zone, the Gold Run target, and others in 2018.

• SRK to refine structural and lithologic mapping beginning in June.

• New-Sense Geophysics Ltd. to complete 3,000-line kilometers of helicopter -borne magnetic,

radiometric and VLF-EM surveying beginning in June.

• GroundTruth Exploration to collect 5,000 soils throughout the Klondike District property.

• Ian Perry, P. Geo. is appointed as Vice President of Exploration.

Drill Strategy

The initial phase of drilling now underway is designed to test surface gold mineralization at both the Lone

Star Zone and the newly discovered Gold Run target located 35 kms southeast, along strike on the Rabbit

Creek Thrust trend. Later phases of drilling are planned to include testing of the Lone Star Zone, the

Nugget Zone, and other targets.

At the Lone Star Zone, the first series of shallow holes are designed to systematically test selected section

lines to provide information on the lateral and vertical geometry and continuity of gold mineralization.

Drilling procedures will include using oriented core tools with both NTW and HTW diameter core, and

systematic use of XRF analyzers. Plans also include drilling specific locations across the Lone Star Zone to

be used for preliminary metallurgical tests. The Lone Star Zone is located 20 km from Dawson at the

northwest end of the Klondike District proper ty. A total of approximately 20 holes are initially planned,

with additional holes to follow as the summer progresses.

At the new Gold Run target, prospecting in late 2017 located three “lost” c.1900 mine shafts. Visible gold

was observed in quartz vein material within sorted, hand-stacked tailings piles adjacent to each of these

shafts within a 300-meter by 200-meter area. In total 27 prospecting samples were collected from quartz

material in the three tailings piles and all contained gold (0.6 g/t to 55 g/t Au). These prospecting samples

are very selective in nature, non -representative rock grab samples collected to test for the presence or

absence of gold. Systematic additional test results may vary significantly. Individual quartz vein pieces

with selvages suggest individual veins are only 10 cm to 50 cm in width. The old shafts are located in a

similar structural position to Lone Star Zone above a major thrust fault (inferred to be a continuation of

the ‘Rabbit Creek thrust’) and adjacent to an interpreted secondary fault (inferred to be the ‘Bonanza

fault’ or equivalent) . The Gold Run target is located 35 km from the Lone Star Zone and 55 km from

Dawson. A total of 4 holes are planned to test for geology and mineralization and will be followed by soil

surveying to help identify anomalous trends, with additional holes contingent upon positive results.

2018 Work Contracts

SRK Consulting has been contracted to conduct structural and lithologic mapping through the Klondike

District property. The objective of this work is to identify district -scale structures and the disposition of

individual lithologies adjacent to these faults, which will compliment the compilation recently completed

by Klondike Gold staff. Field work is scheduled to begin by mid-June and be completed by mid-August.

New-Sense Geophysics Ltd has been contracted to complete helicopter-borne magnetic, radiometric, and

VLF-EM surveying totalling approximately 3,000 line km covering the Klondike District property, including

portions previously covered by ground surveys. This work is expected to provide a comprehensive view

of structures transecting the district and be completed within this season, potentially allowing for targeted

drilling follow-up. Airborne surveying is scheduled to begin in June.

GroundTruth Exploration is providing drone orthophotography surveying on targeted areas where no

previous coverage exists. Drone surveys have been completed with data delivery expected this week.

Additionally, GroundTruth has been contracted to collect approximately 5,000 soils covering the core

areas of interest within the Klondike District property. Soil sample collection is scheduled to begin in June.

Kluane Drilling has been contracted to provide drilling services. This year the contract includes provision

for oriented core drilling, both NTW and HTW core drilling, and other technical drilling services. In

conjunction with core drilling, Klondike Gold this year will be using InnovX X-ray Fluorescence (“XRF”)

analyzer provided by Reflex as part of the geotechnical suite of data collected from core.

Work Update

Initial field work has been underway since March and has consisted of preparing access routes and drill

sites, relogging and additional sampling of older drill holes, re-assaying of 2017 drill core from the Lone

Star Zone, thin section and whole rock analyses, and re-examination of drill holes along the Nugget fault.

In addition, 2018 field work consisting of prospecting, mapping, drone and fixed-wing aerial surveying for

orthophotography, and drilling is also now underway.

New Appointment

The Company welcomes Ian Perry, P. Geo. to fill the role of Vice President, Exploration. Mr. Perry has

over 35 years of experience including the management of the technical and engineering aspects of

advanced exploration and development projects , both in Canada and internationally. Mr. Perry has

assumed responsibility for directing ongoing exploration.

The technical and scientific information contained within this news release has been reviewed and

approved by Peter Tallman, P.Geo, President of Klondike Gold Corp. and Qualified Person as defined by

National Instrument 43-101 policy.

ABOUT KLONDIKE GOLD CORP.

Klondike Gold Corp. is a Canadian ex ploration company with offices in Vancouver, British Columbia, and

Dawson City, Yukon Territory. The Company is focused on exploration and development of the Lone Star

gold target at the confluence of Bonanza and Eldorado Creeks, within a district scale 553 square kilometer

property accessible by government maintained roads located on the outskirts of Dawson City, YT within

the Tr’ondëk Hwëch’in First Nation traditional territory.

On behalf of Klondike Gold Corp.

“Peter Tallman”

President and CEO

(604) 609-6110

E-mail: [email protected]

Website: www.klondikegoldcorp.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that ter m is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Disclaimer for Forward-Looking Information

“This press release contains “forward-looking information” and “forward- looking stat ements” within the meaning of

applicable securities laws. This information and statements address future activities, events, plans, developments and

projections. All statements, other than statements of historical fact, constitute forward-looking statement s or forward-

looking information. Such forward-looking information and statements are frequently identified by words such as “may,”

“will,” “should,” “anticipate,” “plan,” “expect,” “believe,” “estimate,” “intend” and similar terminology, and reflect

assumptions, estimates, opinions and analysis made by management of Klondike in light of its experience, current

conditions, expectations of future developments and other factors which it believes to be reasonable and relevant.

Forward-looking information and s tatements involve known and unknown risks and uncertainties that may cause

Klondike’s actual results, performance and achievements to differ materially from those expressed or implied by the

forward-looking information and statements and accordingly, undue reliance should not be placed thereon.

Risks and uncertainties that may cause actual results to vary include but are not limited to the availability of financing;

fluctuations in commodity prices; changes to and compliance with applicable laws and regulations, including

environmental laws and obtaining requisite permits; political, economic and other risks; as well as other risks and

uncertainties which are more fully described in our annual and quarterly Management’s Discussion and Analysis and

in other filings made by us with Canadian securities regulatory authorities and available at www.sedar.com. Klondike

disclaims any obligation to update or revise any forward-looking information or statements except as may be required.”