Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KFR.V ·

Kingfisher Metals Reports 234 meters of 1.0% Copper Equivalent, within 558 meters of 0.64% CuEq at HWY 37 Project,

Drill Results

Kingfisher Metals Reports 234 meters of 1.0% Copper

Equivalent, within 558 meters of 0.64% CuEq at HWY 37 Project,

Golden Triangle, British Columbia

VANCOUVER, BC / ACCESS Newswire / September 10, 2025 / Kingfisher Metals Corp.

(TSXV:KFR)(FSE:970)(OTCQB:KGFMF) ("Kingfisher" or the "Company") is pleased to

announce initial results from the 2025 drilling program at the HWY 37 Project. The 849 km 2

HWY 37 Project is located within the Golden Triangle, British Columbia.

HW-25-004 has returned one of the highest and longest grade copper-gold intercepts ever

completed at the Williams porphyry copper-gold deposit. The drillhole intercepted 557.8

meters 1 of 0.29% copper, 0.30 g/t gold, and 1.6 g/t silver (0.64% CuEq) 2 (Table 1).

Importantly this hole highlights a body of strong bornite mineralization demonstrating the

potential for additional high-grade porphyry copper gold deposits at the HWY 37 Project.

Highlights include:

• HW-25-004 : 557.8 meters at 0.64% CuEq from 328.10 meters

o Including 234.35 meters at 1.00% CuEq from 328.10 meters

Dustin Perry, CEO of Kingfisher, states "In these initial drill results we see clear

confirmation of our exploration concepts - consistent vertical grade and expansion of the

bornite-rich stockwork. The new data de-risks the broader project targets, justifies future

drill meters, and strengthens our conviction that we're advancing a value-creating asset for

shareholders. "

HW-25-004 Summary

HW-25-004 was collared at 169 o degrees and -75 o dip (Figure 1 & 2), upslope and north of

potassic alteration at Williams. After passing through the Williams thrust fault at 327

meters (m), the drill cut into copper-bearing potassic alteration ( Figure 3). Well-developed

potassic alteration with chalcopyrite-bornite-diginite is present from 328 to 805 m

downhole with chalcopyrite-dominant mineralization from 805 to end of hole at 885.9 m.

Bornite occurs at surface at the discovery outcrop 1040 m elevation (m el.) and has been

intersected in historical drilling down to 480 m el. These new results extend bornite

mineralization to 340 m el., or 140 m deeper than previously known (Figure 2). The higher-

grade subinterval of 328.10 to 562.45 m is associated with several syn-mineral porphyry

phases and elevated copper is best developed in high fracture zones, breccia and higher

vein density at the margin to the porphyry contacts. This subinterval is interpreted to be the

hot core of the sulfide system, as bornite > chalcopyrite. Bornite-rich cores to porphyry

systems are commonly associated with associated elevated gold grades. This is the first

intercept of the deeper extents of the bornite > chalcopyrite body and the vertical extent of

this body is unknown.

Table 1: Hole HW-25-004 Assay Results

Hole From (m) To (m) Interval 1

(m)

Cu % Au g/t Ag g/t CuEq 2

%

HW-25-004 328.10 885.90 557.80 0.29 0.30 1.6 0.64

Incl. 328.10 562.45 234.35 0.44 0.49 2.3 1.00

Figure 1: Plan View Historical and 2025 Drillhole Locations

Figure 2. Plan view of Williams deposit area

Figure 3: Hole HW-25-004 Cross Section with 130m window width, Williams Deposit

Table 1. Summary of Diamond Drill Holes

Hole

ID Zone

Easting

(mE)

North

(mN) Azi

( o )

Dip

( o )

Final

Depth

(m)

Status

UTM NAD83 Zone

09

HW-

25-

001

Williams 409395 6344077 119 -80 803 Complete , samples

shipped to assay lab

HW-

25-

002

East

Williams 409769 6343628 292 -85 550 Complete , samples

shipped to assay lab

Hole

ID Zone

Easting

(mE)

North

(mN) Azi

( o )

Dip

( o )

Final

Depth

(m)

Status

UTM NAD83 Zone

09

HW-

25-

003

East

Williams 410086 6343432 286 -68 668 Complete , samples

shipped to assay lab

HW-

25-

004

Williams 409510 6344131 169 -75 886

Reported in this release,

Samples were

prioritized

HW-

25-

005

Upper

Hank 410475 6341586 295 -76 282

Lost hole at 282 m short

of proposed depth - no

plans to send for assay

at this time

HW-

25-

006

Upper

Hank 410475 6341586 295 -77 839

Complete , samples

shipped to assay lab.

Redrill of HW-25-005

HW-

25-

007

Lower

Hank 408790 6342028 110 -65 192

Lost hole at 192 m short

of proposed depth - no

plans to send for assay

at this time

HW-

25-

008

Williams 409415 6343882 027 -73 893 Complete , samples

shipped to assay lab

HW-

25-

009

Williams 409586 6343818 255 -82 761 Complete , samples

shipped to assay lab

HW-

25-

010

Williams 409419 6343879 075 -84 797

Complete , detail

logging and sampling in

progress

Hole

ID Zone

Easting

(mE)

North

(mN) Azi

( o )

Dip

( o )

Final

Depth

(m)

Status

UTM NAD83 Zone

09

HW-

25-

011

Lower

Hank 408790 6342028 111 -65 959

Complete , Redrill of

HW-25-007, detail

logging

and sampling in

progress

Summary of Work Completed to date:

• Drilling was completed on September 7 th , totalling 7,630 m

o HW-25-001, -002, -003, -004, -006, -008, and -009 have been sent to the

Bureau Veritas ("BV") lab for assay (currently logging and sampling HW-25-

010 and 011). Failed holes HW-25-005 and -007 will not be assayed at this

time.

• 84 person days of mapping

• >750 soil samples

• >650 surface rocks samples

• 30.7 line-km of IP geophysics

• 1,750 line-km (covering ~319 km 2 ) of airborne Mobile Magnetotellurics (MMT)

geophysical survey

• Light Detection and Ranging (LiDAR) survey covering 256 km 2

Quality Assurance / Quality Control (QAQC)

Drilling on site at the HWY 37 Project was supervised by on-site Kingfisher personnel who

implemented a full QAQC program using coarse blanks, pulp blanks, standards, and

duplicates inserted into the sample stream to monitor analytical accuracy and precision.

The samples were sealed on site using tamper proof seals with unique identifiers. The

samples were sent to the BV lab in Vancouver, British Columbia. BV's quality control

system complies with global certifications for Quality ISO/IEC 17025:2017 - General

requirements for the competence of testing and calibration laboratories . Diamond drill

core samples were analyzed using a combination of BV's MA200 process for low level

concentrations (4 acid digestion/ICP-ES/MS) and MA 370 process for higher level

concentrations (4 acid digestion/ICP-ES). Gold assaying was completed using FA430, a 30-

gram fire assay with AAS finish. If applicable, base metal overlimits were finalized with

titration, and gold overlimits completed with a gravimetric finish. Technical aspects of this

news release have been reviewed, verified, and approved by Tyler Caswell, P .Geo., Vice

President Exploration of Kingfisher, who is a qualified person as defined by National

Instrument 43-101 - Standards of Disclosure for Minerals Projects.

About Kingfisher Metals Corp.

Kingfisher Metals Corp. (https://kingfishermetals.com/) is a Canadian based exploration

company focused on copper-gold exploration in the Golden Triangle, British Columbia.

Through outright purchases and option earn in agreements (Orogen Royalties and Golden

Ridge Resources) the Company has quickly consolidated one of the largest land positions

in the region at the contiguous 849 km 2 HWY 37 Project. Kingfisher also owns (100%) two

district-scale orogenic gold projects in British Columbia that total 641 km 2 . The Company

currently has 88,822,226 shares outstanding.

For further information, please contact:

Dustin Perry, P .Geo.

CEO and Director

Phone: +1 778 606 2507

E-Mail: [email protected]

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies

of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Statements

Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of

mineralization hosted on the Company's property. This news release contains statements

that constitute "forward-looking statements. " Such forward-looking statements involve

known and unknown risks, uncertainties and other factors that may cause the Company's

actual results, performance or achievements, or developments to differ materially from the

anticipated results, performance or achievements expressed or implied by such forward-

looking statements. Forward-looking statements are statements that are not historical

facts and are generally, but not always, identified by the words "expects, " "plans, "

"anticipates, " "believes, " "intends, " "estimates, " "projects, " "potential" and similar

expressions, or that events or conditions "will, " "would, " "may, " "could" or "should" occur.

Forward-looking statements in this news release include, among others, statements

relating to expectations regarding the projects, and other statements that are not historical

facts. By their nature, forward-looking statements involve known and unknown risks,

uncertainties and other factors which may cause our actual results, performance or

achievements, or other future events, to be materially different from any future results,

performance or achievements expressed or implied by such forward-looking statements.

Such factors and risks include, among others: the Company may require additional

financing from time to time in order to continue its operations which may not be available

when needed or on acceptable terms and conditions acceptable; compliance with

extensive government regulation; domestic and foreign laws and regulations could

adversely affect the Company's business and results of operations; the stock markets have

experienced volatility that often has been unrelated to the performance of companies and

these fluctuations may adversely affect the price of the Company's securities, regardless of

its operating performance.

The forward-looking information contained in this news release represents the

expectations of the Company as of the date of this news release and, accordingly, is

subject to change after such date. Readers should not place undue importance on forward-

looking information and should not rely upon this information as of any other date. The

Company undertakes no obligation to update these forward-looking statements in the

event that management's beliefs, estimates or opinions, or other factors, should change.

1 True widths of the reported mineralized interval have not been determined.

2 Assumptions used in USD for the copper equivalent calculation (CuEq) were metal prices

of $4.00/lb copper, $3,000/oz gold, and $30/oz silver. Recovery is assumed to be 80% for

copper, 80% for gold and 80% for silver. The following equations was used to. calculate the

copper equivalence: CuEq = copper (%) + (gold (g/t) x 1.0938) + (silver (g/t) x 0.0109).

Differences may occur due to rounding.

SOURCE: Kingfisher Metals Corp.