Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KDK.V ·

Kodiak Provides Update on Drill Program at MPD Copper-Gold Porphyry Project in Southern British Columbia

Exploration Programs

Kodiak Provides Update on Drill Program at

MPD Copper-Gold Porphyry Project in

Southern British Columbia

Vancouver, British Columbia--(Newsfile Corp. - August 13, 2020) -

Kodiak Copper Corp. (TSXV:

KDK) (the "Company" or "Kodiak") is pleased to provide an update on its fully funded Phase II drill

program at its 100% owned MPD copper-gold porphyry project in Southern British Columbia.

Kodiak commenced drilling at MPD on July 13 (see Kodiak news release dated July 13, 2020) and the

program is progressing well. Highlights so far include:

The 2020 Phase II drill program has to date focused on the

Gate Zone

area where Kodiak

reported the significant discovery earlier this year of an extensive porphyry copper-gold zone

including the

highest grade copper-gold intervals

ever reported in drill core from the property

All new Phase II drill holes have successfully intersected prospective sulphide-bearing,

altered porphyritic host rocks

consistent with a well-developed alkalic porphyry system

Current Phase II drilling aims to expand the

known dimensions and define the geological

controls

at the Gate Zone

Core samples are being shipped to ALS Canada Ltd. in North Vancouver, BC for preparation and

final analysis.

Assay results from the Phase II drilling will be reported from late August

onwards

Drilling is on schedule, and the Company

has completed three holes totalling 2345 metres of

4000 planned metres of drilling

as of August 12

With encouraging results

the current drill program should be expanded into Q4 2020

128 rock samples and 357 soil samples

were collected as part of Kodiak's

Dillard East

gold

prospecting program. These samples have also been shipped to ALS Canada Ltd. for analysis,

with results pending.

Claudia Tornquist, President and CEO of Kodiak said, "Our Phase II drill program is progressing

efficiently and we are very pleased to observe encouraging alteration with sulphide mineralization in all

drill holes. Just over half of the planned meterage has been completed to date. We are looking forward

to the first new Phase II drill results in the coming weeks and are already planning the next phase of work

and a potential acceleration of our drilling."

Phase II Drilling at MPD Project - August 2020

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/3803/61647_kodiak2.jpg

2020 Phase II Drill Program

The 2020 exploration program at MPD began with a property-wide ZTEM

TM

airborne geophysical

survey which provided important data down to a depth of 1000 metres which is helping the Company

prioritise targets for this and future drill campaigns (see Kodiak news releases dated April 8, 2020 and

June 17, 2020).

Mobilization of field staff and equipment commenced mid-July for 2020 Phase II diamond drilling at

MPD. The program is initially focused on expanding significant drill results from the Gate Zone, using

step-out drilling to expand the high-grade mineralization drilled last year. The Company has also

identified several additional high-priority targets across the MPD project believed to have strong

potential for similar copper-gold mineralization. Most of these targets have encouraging shallow

historical drill holes, and/or positive trench and surface sampling results. The 2020 Phase II drill program

at MPD will consist of approximately 4000 metres of core drilling with results expected in Q3/Q4.

Jeff Ward, P.Geo, Vice President Exploration and the Qualified Person as defined by National

Instrument 43-101, has reviewed and approved the technical information contained in this release.

For further information please contact Mr. Knox Henderson, Investor Relations, at 604-551-2360 or

[email protected]

.

On behalf of the Board of Directors

Kodiak Copper Corp.

Claudia Tornquist

President & CEO

About Kodiak Copper Corp.

Kodiak is focused on its portfolio of 100% owned copper porphyry projects in Canada and the USA. The

Company's most advanced asset is the MPD copper-gold porphyry project in the prolific Quesnel Trough

in south-central British Columbia, Canada, where the Company made a discovery of high-grade

mineralization in 2020. Kodiak also holds the Mohave copper-molybdenum-silver porphyry project in

Arizona, USA, near the world-class Bagdad mine. The Company's Trapper copper-gold porphyry project

is located in the northern Golden Triangle region of British Columbia.

All three of Kodiak's porphyry

projects have been historically drilled and present known mineral discoveries with the potential to hold

large-scale deposits.

The Company also holds the advanced-stage Kahuna diamond project in Nunavut, Canada. Kahuna

hosts a high-grade, near surface inferred diamond resource and numerous kimberlite pipe targets.

Kodiak's founder and chairman is Chris Taylor who is well-known for his gold discovery success with

Great Bear Resources.

Kodiak is also part of the Discovery Group led by John Robins, one of the most

successful mining entrepreneurs in Canada.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-Looking Statement (Safe Harbor Statement): This press release contains forward looking

statements within the meaning of applicable securities laws.

The use of any of the words "anticipate",

"plan", "continue", "expect", "estimate", "objective", "may", "will", "project", "should", "predict",

"potential" and similar expressions are intended to identify forward looking statements.

In particular,

this press release contains forward looking statements concerning the Company's exploration plans.

Although the Company believes that the expectations and assumptions on which the forward looking

statements are based are reasonable, undue reliance should not be placed on the forward looking

statements because the Company cannot give any assurance that they will prove correct.

Since

forward looking statements address future events and conditions, they involve inherent assumptions,

risks and uncertainties.

Actual results could differ materially from those currently anticipated due to a

number of assumptions, factors and risks.

These assumptions and risks include, but are not limited

to, assumptions and risks associated with conditions in the equity financing markets, and

assumptions and risks regarding receipt of regulatory and shareholder approvals.

Management has provided the above summary of risks and assumptions related to forward looking

statements in this press release in order to provide readers with a more comprehensive perspective

on the Company's future operations.

The Company's actual results, performance or achievement

could differ materially from those expressed in, or implied by, these forward looking statements and,

accordingly, no assurance can be given that any of the events anticipated by the forward looking

statements will transpire or occur, or if any of them do so, what benefits the Company will derive from

them.

These forward looking statements are made as of the date of this press release, and, other than

as required by applicable securities laws, the Company disclaims any intent or obligation to update

publicly any forward looking statements, whether as a result of new information, future events or results

or otherwise.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/61647