Kutcho Copper Provides Interim Metallurgical Update

Vancouver, B.C., March 14th, 2019. Kutcho Copper Corp. (TSXV: KC) (OTC: KCCFF) (“Kutcho

Copper” or the “Company”) is pleased to provide an update to its metallurgical program based on work led

by Mr. Len Holland of Holland & Holland Consultants, UK, an internationally recognized metallurgical

consultant and Ausenco Limited, a multinational engineering company. Results to date suggest a simplified

reagent suite that could achieve similar recoveries and concentrate grades, but at lower capital and operating

costs compared to the 2017 Kutcho Prefeasibility Study (Please see the Company’s website www.kutcho.ca

for the 2017 NI 43-101 Technical Report or SEDAR www.SEDAR.com)

“The revised metallurgical program test results reveal potential for an important value add ition to the

Kutcho project ,” said Vince Sorace, President and CEO of Kutcho Copper Corp. “The Kutcho team

continues to identify opportunities to enhance the value of the project through previously reported resource

increases, operational efficiencies through areas such as this enhanced metallurgical performance and

progressing towards completion of the Feasibility study”

Optimization Program

Kutcho’s team, led by Mr. Holland, identified an opportunity to improve on the historical metallurgical

work conducted by previous owners of the Kutcho project. The Company has developed an improved

reagent scheme based upon an optimized primary grind and standard zinc depressor reagents to obtain

selectivity between the copper and zinc at a relatively high pH in the copper float. The flowsheet and reagent

scheme presently developed is both simpler and lower operating cost when compared to previous proposed

systems. In addition, lower levels of zinc reporting to the initial copper concentrate should assist in

improving the overall zinc reporting to the zinc circuit.

Grind parameters are typical of those used for polymetallic deposits similar to Kutcho, with a primary grind

anticipated at 60 microns. A regrind on the copper rougher concentrate will be required and is presently

anticipated as +/-25 microns, while the zinc circuit does not require a regrind.

The 2017 Prefeasibility Study utilized life of mine average recoveries of 84.7% copper, 75.7% zinc, 48.0%

silver and 41.2% gold, with the copper concentrate anticipated to grade 27.6% copper and the zinc

concentrate anticipated to grade 55.1% zinc.

“The metallurgical test work is presently in the regrind and cleaner phase to optimize the separation of the

value metals into their respective concentrates. Regrind and cleaner phase test work is anticipated to be

complete within 2 weeks , with lock-cycle test work to be performed thereafter to establish the ove rall

metallurgical parameters for the feasibility study . It is anticipated that the results of the present test work

will be comparable to previous metallurgy, but with lower plant operating and capital costs,” commented

Mr. Holland.

Mr. Holland is an experienced mineral processing engineer with considerable expertise in the recovery of

metals from polymetallic ores spanning several decades on deposits around the world. Mr. Holland has

more than 50 years of experience in world -wide operations and consult ing, in association with, but not

limited to, BP Minerals, Glencore, SNC Lavalin, and First Quantum. The metallurgical test work is being

Kutcho Copper Corp.

-2-

carried out in the Bureau Veritas laboratories in Richmond, BC, Canada, under the direction and supervision

of the Kutcho metallurgical team.

Qualified Person

Leonard Holland, of Holland and Holland Consultants holds a B.Sc. (Hons) in Extraction Metallurgy from

the University of Wales, Swansea, United Kingdom, is a Fellow of the Institution of Materials Mining and

Metallurgy, a Fellow of the Minerals Engineering Society and is a Chartered Engineer. Leonard Holland is

an independent technical consultant with over 5 0 years of global experience in mine development and

metallurgy. Mr. Holland is a "Qualified Person" as defined in National Instrument 43 -101 "Standards of

Disclosure for Mineral Projects" of the Canadian Securities Administrators and has reviewed and approved

this press release.

Rory Kutluoglu, B.Sc. P.Geo., a Qualified Person as defined by National Instrument 43-101, has read and

approved all technical and scientific information contained in this news release. Mr. Kutluoglu is the

Company’s Vice President, Exploration & Development.

About Kutcho Copper Corp.

Kutcho Copper Corp. is a Canadian resource development company focused on expanding and developing

the Kutcho high grade copper-zinc project in northern British Columbia. Committed to social responsibility

and the highest environmental standards, the Company intends to progress the Kutcho Project through

feasibility and permitting to a positive construction decision.

Vince Sorace

President & CEO, Kutcho Copper Corp.

For further information regarding Kutcho Copper Corp., please email [email protected] or visit our website

at www.kutcho.ca.

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies o f the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains certain statements that may be deemed “forward -looking statements” with respect to the

Company within the meaning of applicable secu rities laws. Forward-looking statements are statements that are not

historical facts and are generally, but not always, identified by the words “expects”, “plans”, “anticipates”,

“believes”, “intends”, “estimates”, “projects”, “potential” , “indicates”, “op portunity”, “possible” and similar

expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although Kutcho

Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions,

such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results

or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties

include, but are not limited to, the Company’s ability to raise sufficient capital to fund its obligations under its property

agreements going forward, to maintain its mineral tenures and concessions in good standing, to explore and develop

the Kutcho project or its other projects, to repay its debt and for general working capital purposes; changes in

economic conditions or financial markets; the inherent hazards associates with mineral exploration and mining

operations, future prices of copper and other metals, changes in general economic conditions, accuracy of mineral

resource and reserve estimates, the potential for new discoveries, the potential to convert inferred resources to

indicated or measured resources, the potential to optimize the mine plan, the ability of the Company to obtain the

necessary permits and consents required to explore, drill and develop the Kutcho project and if obtained, to obtain

such permits and consents in a timely fashion relative to the Company’s plans and business objectives for the projects;

the general ability of the Company to monetize its mineral resources; and changes in environmental and other laws

or regulations that could have an impact on the Company’s operations, compliance with environmental laws and

regulations, aboriginal title claims and rights to consultation and accommodation, dependence on key management

Kutcho Copper Corp.

-3-

personnel and general competition in the mining industry. Forward -looking statements are based on the reasonable

beliefs, estimates and opinions of the Company’s management on the date the statements are made. Except as required

by law, the Company undertakes no obligation to update these forward -looking statements in the event that

management’s beliefs, estimates or opinions, or other factors, should change .