Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KC.V ·

Kutcho Copper Drills 11.5m of 1.9% CuEq* (including 1.5m of 6.6% CuEq*) at Esso Below Existing Resource Model; Drills 21.9m of 3.3% CuEq* and 10.4m of 5.3% CuEq*at Main Deposit

Drill Results

Kutcho Copper Corp. | 717 – 1030 West Georgia Street | Vancouver, British Columbia | Canada | V6E 2Y3

Telephone: (604) 628-5623 | www.kutcho.ca

Kutcho Copper Drills 11.5m of 1.9% CuEq* (including 1.5m of 6.6% CuEq*) at

Esso Below Existing Resource Model; Drills 21.9m of 3.3% CuEq* and 10.4m of 5.3%

CuEq*at Main Deposit

Vancouver, B.C., October 2, 201 8. Kutcho Copper Corp. (TSXV: KC) (OTC: KCCFF ) (“Kutcho

Copper” or the “Company”) is pleased to announce final drill results from the Esso deposit and initial results

from the Main deposit at its 100% owned Kutcho high grade copper-zinc project located in British

Columbia.

Drill hole KC18-225-W1 is the final hole drilled at Esso and returned 11.5m of 1.9% CuEq* including a

1.5m high grade intersection of 6.6% CuEq*. This hole intersected a copper mineralized carbonate-silica

exhalite, followed by 38m of lapilli tuff, containing 20 -25% pyrite and 3% chalcopyrite. Within this tuff,

several intervals of high grade chalcopyrite stringers occur that extends mineralization below the resource

block model.

Vince Sorace, President & CEO, stated, “We have now completed all the field work required on the Esso

deposit for the Feasibility Study. We will now embark on generating a new mineral resource estimate for

Esso while completing resource expansion drilling on the Main deposit. The results from hole KC18-225-

W1 are particularly exciting as it consists of a previously unrecognized stringer zone to the Esso lens that

lies outside of the current mineral resource block model and may be discordant to the main trend of

mineralization. As a result, the intersection remains open down dip and along strike.”

Drill holes KC18-234 to KC18-242 are distributed throughout the Main deposit and are designed to collect

metallurgical samples, geotechnical information and convert mineral resources from inferred to indicated

categories. Highlights from the Main deposit include:

 KC18-237 with 3.1m of 1.65% Cu, 5.2% Zn, 38.9 g/t Ag and 0.41 g/t Au or 4.4% CuEq*

 KC18-239 with 18.8m of 1.8 0% Cu, 1. 4% Zn, 30.2 g/t Ag and 0.28 g/t Au or 2.8% CuEq *

(Including 6.4m of 3.8% CuEq* and including 4.3m of 4.1% CuEq*)

 KC18-240 with 14.4m of 1.62% Cu, 4. 4% Zn, 31.9 g/t Ag and 0.54 g/t Au or 4. 1% CuEq *

(including 10.4m of 5.3% CuEq* and including 2.2m of 13.7% CuEq*

 KC18-242 with 21. 9m of 1.7 4% Cu, 2.5% Zn, 37.5g/t Ag and 0.32 g/t Au or 3. 3% CuEq *

(Including 7.4m of 5.5% CuEq*)

Drilling confirmed mineralization tenor and grade throughout the Main deposit and continues to

demonstrate the high grade in the deposit.

Kutcho Copper Corp.

-2-

Hole ID

From

(m)

To

(m)

Interval

(m)** Cu % Zn % Ag g/t Au g/t CuEq*%

KC18-222 to KC18-

225 Engineering Holes (Not Assayed)

KC18-225-W1 540.30 551.83 11.53 1.02 0.5 54.0 0.25 1.9

including 540.30 541.83 1.53 3.43 0.2 320.1 0.36 6.6

KC18-226 to KC18-

233 & KC18-236 Engineering Holes (Not Assayed)

KC18-234 33.20 36.72 3.52 1.00 0.9 12.5 0.13 1.6

including 34.16 35.38 1.22 1.36 0.0 25.4 0.22 1.7

KC18-235 Results Pending

KC18-237 65.82 70.42 4.60 1.19 3.6 27.1 0.29 3.1

including 66.57 69.67 3.10 1.65 5.2 38.9 0.41 4.4

KC18-238 115.22 143.98 28.76 0.78 1.4 16.4 0.32 1.7

including 125.00 143.98 18.98 1.07 1.9 22.7 0.42 2.3

including 127.45 137.80 10.35 1.21 3.1 29.3 0.58 3.1

KC18-239 102.71 121.52 18.81 1.80 1.4 30.2 0.28 2.8

including 115.12 121.52 6.40 2.59 1.4 40.7 0.44 3.8

including 117.26 121.52 4.26 2.66 1.7 42.8 0.48 4.1

KC18-240 36.45 50.82 14.37 1.62 4.4 31.9 0.54 4.0

including 39.10 49.46 10.36 2.08 6.0 41.1 0.69 5.3

including 43.53 45.68 2.15 4.59 17.7 85.5 1.81 13.7

KC18-241 100.00 108.31 8.31 1.20 0.2 27.0 0.25 1.7

and 123.50 132.00 8.50 1.59 0.4 19.9 0.26 2.1

including 123.50 130.41 6.91 1.89 0.3 23.5 0.29 2.4

KC18-242 33.03 54.89 21.86 1.74 2.4 37.5 0.32 3.3

including 37.66 45.09 7.43 3.18 3.4 67.7 0.44 5.5

including 50.00 54.89 4.89 2.11 4.6 49.8 0.71 4.9

*CuEq = Copper Equivalent calculated using $2.75/t Cu, $1.10/t Zn, $17.00/Oz Ag, $1250/Oz Au

**True width estimated to be nominally 85% length of intercepts

TCS Project Update

Kutcho has also completed the field program at TCS that consisted of field mapping, rocks and soil

sampling. The TCS property is located 16km east of Dease Lake and covers the Permo -Triassic Kutcho

formation of bimodal volcanic rocks, which host the Kutcho deposits approximately 90km to the east. TCS

presents a pure greenfields opportunity which has never been drilled. Previous exploration programs have

identified mineralized and altered bedrock in creek outcrops and a 600m by 800m Cu-Zn soil anomaly.

Kutcho Copper Corp.

-3-

Kutcho Copper Corp.

-4-

Kutcho Copper Corp.

-5-

QA/QC Statement on Assay Results

Diamond drilling conducted on the Kutcho property for 2018 is by Cyr Drilling International of Winnipeg,

Manitoba, using Boyles BBS-37 surface drills, with HQ diameter drill rods. All holes were oriented using

an ACT III core orientation tool and after completion of the drill hole, holes were surveyed using a

downhole gyroscopic tool from Terraplus Inc. of Richmond Hill, Ontario . Kutcho systematically inserts

certified standards, blanks, and field duplicates consisting of half core samples into each batch of samples

at regular intervals. Samples are placed in sealed bags and shipped directly to the ALS Minerals preparatory

laboratory in Whitehorse. The 2018 samples are analyzed by ALS Global of Vancouver, British Columbia.

Samples are prepared by crushing the entire sample to 70% passing -2mm, riffle splitting of 250g and

pulverizing the split to better than 85% passing 75 microns. The core samples also undergo a robust

duplicate assay program that tests rejects and pulps for reproducibility. Samples are also sent to an umpire

lab.

The gold assays are determined by Au -AA23 fire assay method which reports in parts per million (ppm)

(equivalent to grams per tonne (g/t)). Any samples greater than 9.00g/t gold are analyzed by Au -GRA21

fire assay method with a gravimetric finish.

Base metal assays are first determined using the ME-ICP41 method, which reports results as part s per

million (ppm). All analyses that reach the overlimits of ME -ICP61 are reanalyzed with an Ore Grade

method. The analytical results are verified with the application of industry standard Quality Control and

Quality Assurance (QA/QC) procedures.

Qualified Person

Rory Kutluoglu, B.Sc. P.Geo., a Qualified Person as defined by National Instrument 43-101, has read and

approved all technical and scientific information contained in this news release. Mr. Kutluoglu is the

Company’s Vice President Exploration.

About Kutcho Copper Corp.

Kutcho Copper Corp. is a Canadian resource development company focused on expanding and developing

the Kutcho high grade copper-zinc project in northern British Columbia. Committed to social responsibility

and the highest environmental standards, the Company intends to progress the Kutcho Project through

feasibility and permitting to a positive construction decision.

Vince Sorace

President & CEO, Kutcho Copper Corp.

For further information regarding Kutcho Copper Corp., please email [email protected] or visit our website

at www.kutcho.ca.

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains certain statements that may be deemed “forward-looking statements” with respect to the

Company within the meaning of applicable securities laws. Forward -looking statements are statements that are not

historical facts and are generally, but not always, identified by the words “exp ects”, “plans”, “anticipates”,

“believes”, “intends”, “estimates”, “projects”, “potential” , “indicates”, “opportunity”, “possible” and similar

Kutcho Copper Corp.

-6-

expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although Kutcho

Copper believes the expectations expressed in such forward-looking statements are based on reasonable assumptions,

such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results

or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties

include, but are not limited to, the Company’s ability to raise sufficient capital to fund its obligations under its property

agreements going forward, to maintain its mineral tenures and concessions in good standing, to explore and develop

the Kutcho project or its other projects, to repay its debt and for general working capital purposes; changes in

economic conditions or financial markets; the inherent hazards asso ciates with mineral exploration and mining

operations, future prices of copper and other metals, changes in general economic conditions, accuracy of mineral

resource and reserve estimates, the potential for new discoveries, the potential to convert inferre d resources to

indicated or measured resources, the potential to optimize the mine plan, the ability of the Company to obtain the

necessary permits and consents required to explore, drill and develop the Kutcho project and if obtained, to obtain

such permits and consents in a timely fashion relative to the Company’s plans and business objectives for the projects;

the general ability of the Company to monetize its mineral resources; and changes in environmental and other laws

or regulations that could have a n impact on the Company’s operations, compliance with environmental laws and

regulations, aboriginal title claims and rights to consultation and accommodation, dependence on key management

personnel and general competition in the mining industry. Forward -looking statements are based on the reasonable

beliefs, estimates and opinions of the Company’s management on the date the statements are made. Except as required

by law, the Company undertakes no obligation to update these forward -looking statements in the event that

management’s beliefs, estimates or opinions, or other factors, should change.