Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

KALO.V ·

KALO GOLD Drills Additional Thick, Near-Surface, High-Grade GOLD Mineralization, with 69M at 0.91 G/T Au (Including 4M of 5.11 G/T Au), at Vatu Aurum GOLD Project IN Fiji

Drill Results

Kalo Gold Holdings Corp.

Suite 1430, 800 West Pender Street

Vancouver, BC, V6C 2V6

www.kalogoldcorp.com

[email protected]

For Immediate Release

KALO GOLD DRILLS ADDITIONAL THICK, NEAR-SURFACE,

HIGH-GRADE GOLD MINERALIZATION, WITH 69M AT 0.91 G/T

AU (INCLUDING 4M OF 5.11 G/T AU), AT VATU AURUM GOLD

PROJECT IN FIJI

VANCOUVER, BC, CANADA, JULY 13, 2021, KALO GOLD HOLDINGS CORP. (TSX.V: KALO)

(“Kalo Gold,” or the “Company”), is pleased to announce the results from two additional drill holes which

both intersected thick, near surface, gold mineralization at Qiriyaga Hill at Kalo Gold’s 100% owned, large

36sqkm, Vatu Aurum gold project in the South Pacific’s Ring of Fire, in Fiji. The drill holes are part of the

Phase 1 Program, where a total of 4 holes have now been reported of the 8 hole, 1,800m program.

Highlights:

 Drill Hole KGD-04, an in-fill drill hole to the northeast of Qiriyaga Hill, recorded multiple thick,

near surface high-grade gold intersections, over an interval of 69m averaging 0.96 g/t Au,

starting at 21m, including 4m of 5.11g/t Au.

 Drill Hole KGD-03, a step-out drill hole to the northwest of Qiriyaga Hill, located 40m to the

northwest of closest hole (TDD-02), recorded multiple thick intersections, over an interval of

24m averaging 1.01 g/t Au, starting at 21m, including 2m of 6.27g/t Au.

 Results provide further confirmation of the continuity of epithermal-type mineralization, with the

deposit open in multiple directions.

Fred Tejada, Kalo Gold Chief Executive Officer, commented: “The results from the first four holes of the

Phase 1 Drill Program and property-wide exploration campaign have been highly encouraging. Step-out

drilling has continued to intersect wide near-surface gold mineralization in Qiriyaga Hill, and remains

open in multiple directions, highlighting the potential for further expansion. While conducting the drilling

at Qiriyaga Hill, a large focus has also been on geochemical sampling and geophysical surveys regionally

and around Qiriyaga Hill. Initial results have shown significant regional target potential, particularly the

Mouta target which reported, 2g/t Au, 645g/t Ag and 3.12% Cu (19.3g/t AuEq) from rock chip outcrop

sampling and 3.06g/t Au, 819g/t Ag and 1.63% Cu (16.6g/t AuEq) from a historical stockpile grab sample(1).

We look forward to reporting additional survey results focused on the Qiriyaga Zone near-term.”

Note (1): See May 26, 2021 Press Release, Kalo Gold Reports High-Grade Gold-Silver-Copper

Mineralization at Mouta Prospect, IP Survey Results Expand Qiriyaga Hill Target Size and Exploration

Activities Update

Drill Results

The latest drilling results are from two drill holes, KGD-03 and KGD-04, which both intersected thick,

near-surface, gold mineralization from the Phase 1 (8 hole, 1,800m) Drill Program at Qiriyaga Hill. KGD-

04 intersected 69m (down-hole length) of gold mineralization, averaging 0.96 g/t Au, including multiple

intersections of higher grade 4m (34m to 38m) at 5.11g/t Au and 1m at 4.53g/t Au at 83m to 84m. The

gold mineralization is characterized by the presence of an alternating sequence of pervasively silica-clay

alteration containing hairline-wide quartz veinlets and ±fine pyrite disseminations in the fiamme breccia

and mudstone. Gold mineralization occurs in both the oxide and primary zones (base of oxidation at 33.2m

down-hole depth) and is open to the northeast. An increase in carbonate alteration (calcite veins), interpreted

to be a post-gold mineralization event, accompanies lower gold mineralization in the primary zone,

particularly in the hydrothermal breccia. Hole KGD-03 recorded multiple gold intersections, from an

overall intersection of 21m to 45m interval (down-hole length), averaging 1.01g/t Au including 2m @

6.27g/t Au from 37m to 39m.

Results of the first two holes were previously released, and included KGD-01, which recorded multiple

thick gold intersections starting at surface, recording an average intersection of 101 m averaging 0.94 g/t

Au with several higher-grade intervals, including 16 m at 2.08 g/t Au (refer to news release dated March

29, 2021 -- "Vatu Aurum Gold Project Confirming Multiple Thick, Near-Surface Gold Intersections").

Significant Intervals include:

Hole ID From (m) To (m) Interval* (m) Grade (g/t) Au

KGD-03

21.00 45.00 24.00 1.01

including

37.00 39.00 2.00 6.27

167.00 172.00 5.00 0.76

289.00 291.00 2.00 0.45

KGD04

21.0 90.00 69.00 0.96

including

34.0 38.00 4.00 5.11

47.0 52.00 5.00 1.83

57.0 61.00 4.00 1.44

63.0 64.00 1.00 2.50

83.0 84.00 1.00 4.53

*Insufficient data to determine true width. No cut-off grade or internal dilution was applied in the

calculation.

Figure 1. Drill hole location map of Qiriyaga Hill

Figure 2. Section along KGD-01 and KGD-03 showing gold assays and those of adjoining drill holes.

Figure 3. Section along KGD-04 showing gold assays and those of adjoining drill holes.

Sampling, Analysis and QAQC

The Company sends its samples to ALS Minerals laboratory in Brisbane, Australia (“ALS”) for sample

preparation and analysis. The drill core was sampled at 1m intervals and cut into half with an electric-

powered core saw at the at the Company’s exploration camp. Gold was analyzed using Au-AA24 method

(50g split). Multi-element analysis was also carried out using ME-ICP61m and Hg-MS42 methods. Au-

AA24 and ME-ICP61 are also used for rock chips or grab samples. Kalo’s Quality Control and Quality

Assurance (QAQC) protocol for drill core samples includes: 1) field measurement of half core sample

weights,;2) insertion of certified reference materials at 1 in 20 frequency; 3) insertion of Certified Reference

Materials (CRM) or blank sample at 1 in 20 frequency; and 3) insertion of duplicate core samples. ALS has

internal QAQC protocols that include analysis and results monitoring for certified reference materials,

blank samples, and duplicate core samples.

Health & Safety Update

Fiji has been under COVID-19 inter-island travel restrictions since mid-April 2021. Drilling in Qiriyaga

Hill and Vuinubu Ridge will resume when restrictions on inter-island travels are lifted to allow the

Company’s drillers to return to site. Meantime, the Company will continue with the review of surface and

core geology and expand soil sampling in Qiriyaga Zone, mapping of Mouta following the completion of

soil sampling and visit to the other prospects.

Kalo Gold operates solely on the northern Fijian island of Vanua Levu, where there are currently no

confirmed community cases of COVID-19. The Company has implemented additional safety controls to

ensure the health and safety of all employees, contractors, and communities. These measures are in line

with the Fiji Ministry of Commerce, Trade, Tourism and Transport Protocols for COVID Safe Business

Operations. Such measures include employee temperature checks, the implementation of the CareFiji App,

ongoing hygiene training, social distancing, and frequent handwashing.

About Kalo Gold

Kalo Gold is a mineral exploration company focused on the Vatu Aurum gold project on Fiji's north island,

Vanua Levu. Kalo holds two mineral exploration licenses covering over 36,700 hectares of land and on

trend with many of the largest gold deposits in the world in the Southwest Pacific Ring of Fire.

Qualified Person

The technical information in this news release was reviewed by Fred Tejada, P.Geo, a director and officer

of Kalo Gold, a qualified person as defined by National Instrument 43-101 (NI 43-101).

On behalf of Kalo Gold

Fred Tejada

Chief Executive Officer and Director

For more information contact, please contact Kevin Ma, President and Director, at

[email protected] or +1-604-363-0411.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the Exchange) accepts responsibility for the adequacy or accuracy of this press release.

Forward Looking Statements Disclaimer

Certain statements in this release are forward-looking statements, which are statements that are not purely

historical, including any statements regarding beliefs, plans, expectations, or intentions regarding the

future. Forward looking statements in this news release include statements relating to proposed drilling

timeline and the proposed expansion of the exploration program. Forward-looking statements are often

identified by terms such as “will”, “may”, “should”, “anticipate”, “expects” and similar expressions. All

statements, other than statements of historical fact, included in this release, including statements regarding

the proposed drilling timeline and the proposed expansion of the exploration program, are forward-looking

statements that involve risks and uncertainties. There can be no assurance that such statements will prove

to be accurate and actual results, and future events could differ materially from those anticipated in such

statements. Important factors that could cause actual results to differ materially from the Company’s

expectations include quality and quantity of any mineral deposits that may be located, the Company's

inability to obtain any necessary permits, consents or authorizations required for its activities, the

Company's inability to raise the necessary capital to be fully able to implement its business strategies, and

other risks and uncertainties disclosed in the Company’s filing statement dated February 9, 2021 and latest

interim Management Discussion and Analysis filed with certain securities commissions in Canada.

The reader is cautioned that assumptions used in the preparation of any forward-looking statements herein

may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those

predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, many of

which are beyond the control of the Company. The reader is cautioned not to place undue reliance on any

forward-looking information. Such information, although considered reasonable by management at the

time of preparation, may prove to be incorrect, and actual results may differ materially from those

anticipated. Forward-looking statements contained in this news release are expressly qualified by this

cautionary statement. The forward-looking statements contained in this news release are made as of the

date of this news release and the Company will update or revise publicly any of the included forward-

looking statements as expressly required by Canadian securities law.