Kalo Gold Advances Exploration at Vatu Aurum Project, Fiji
1
Kalo Gold Corp.
Suite 1507, 1030 West Georgia Street
Vancouver, British Columbia
V6E 2Y3, Canada
www.kalogoldcorp.com
(TSX.V: KALO)
Kalo Gold Advances Exploration at Vatu Aurum Project, Fiji
VANCOUVER, BRITISH COLUMBIA – AUGUST 7, 2025 -- KALO GOLD CORP. (TSX-V: KALO) ("Kalo" or the "Company") is
pleased to provide a comprehensive update on exploration activities at its 100%-owned, 367 km² Vatu Aurum Project,
located on Fiji’s Vanua Levu Island. The 2025 field season, which began in mid-May, has confirmed structural features
and hydrothermal indicators consistent with vertically intact epithermal systems.
● 15,495 soils, 1,907 metres trenching, and 1,352.7 metres drilling (seven holes) completed to date, with assays
pending and two additional holes currently in progress
● Namalau Trend – Dua: six drill holes completed (VA25-DH01 to DH05 and DH07 - 1,104.2 m): Vein-hosted
sulphides intersected, boiling zone indicators with vuggy and bladed quartz textures, polymictic breccias, and
transitions from lower temperature to higher temperature alteration assemblages
● Initial drilling confirms key feeder structures and hydrothermal alteration zones at both Dua and Qiriyaga
Complex – Vunisea (VA25-DH06 – 248.5 m): supporting vert ically intact epithermal and diatreme-hosted gold
models
● All drill core is logged, split, and shipped to ALS Laboratories (Australia) for gold fire assay and multi-
element ICP-MS analysis VA25-DH01–DH02 in lab; DH03–DH05 en route; DH06–DH07 splitting underway
Next Steps
● Assay reporting from the first set of drill holes (expected Q3 2025)
● Drilling expansion into new targets including Rua, QC 2 and Buca based on trench ing, soil anomalies, and
structural mapping
● Follow-up drilling at priority structures at Dua and Vunisea
● Vectoring refinement using XRF data, TerraSpec and path finder element halo analysis to guide drilling to the
most prospective zones
Safety and Sustainability
Kalo Gold remains committed to responsible exploration based on international best practices in health, safety,
environmental stewardship, and community engagement. The Company has recorded zero lost-time injuries (LTIs)
during the 2025 field season.
All field activities are digitally tracked through SiteDocs, ensuring real-time compliance and accountability. Kalo is
working toward third-party certification of its safety and sustainability system s by year-end, aligning with global
Sustainability standards. Engagement continues with lo cal stakeholders and government to support inclusive
exploration and long-term value creation in Fiji.
Qualified Person Statement
All scientific and technical information in this news release has been prepared or reviewed by Andrew Randell, P. Geo,
a Qualified Person as defined by National Instrument 43-101. Mr. Randell is independent of the Company, has conducted
multiple site visits, and directly superv ises the Vatu Aurum exploration program. He has verified the data disclosed,
including sampling, analytical methods, QA/QC protocols, and field procedures.
2
About Kalo Gold Corp.
Kalo Gold Corp. (TSX-V: KALO) is a gold exploration company focused on low-sulphidation epithermal systems in Fiji.
The 100%-owned Vatu Aurum Pr oject spans 367 km² on Vanua Levu, located in a preserved volcanic-back arc setting
with district-scale gold potential.
Exploration is centered on the Auru m Epithermal Field and Qiriyaga Comp lex, where drilling, trenching, and
geochemistry have outlined multiple structurally controlled gold targets. Kalo’s technical programs are led by SGDS Hive.
On behalf of the Board of Directors of Kalo Gold Corp.
Terry L. Tucker, P.Geo
President and Chief Executive Officer
and
Kevin Ma, CPA, CA
Executive Vice President, Capital Markets and Director
For more information contact, please write to [email protected]
Neither the TSX Venture Exchange nor its Regulation Services Pr ovider (as that term is defined in the policies of the
Exchange) accepts responsibility for the adequacy or accuracy of this press release.
Forward-Looking Statements Disclaimer
This news release contains “forward-looking statements” within the meaning of applic able securities laws. These
statements reflect management’s current expectations, strategic objectives, and exploration priorities at the time of
this release. Forward-looking statements are not statements of historical fact and include, but are not limited to:
The Company’s planned multi-phase exploration and drilling program, including the targeting of structurally
controlled gold zones at Coqeloa, Aurum Prime, Namalau, Loma, Buca Trends, and the Qiriyaga Complex.
Interpretations of geological features, mineralization continuity, and depo sit potential, based on geophysical
surveys, surface sampling, and histor ical drill data, which ar e subject to change as additional drilling and
verification work is conducted.
The potential for district-scale gold mineralization, su bject to further exploratio n, drilling, and independent
verification.
All exploration results, including geoc hemical data and historical intercepts , are preliminary in nature and do
not constitute a mineral resource estimate. Further expl oration, including drilling, is required to confirm the
continuity, grade, and extent of mineralization at the Vatu Aurum Project.
The Company’s ability to secure suffic ient financing, obtain necessary re gulatory approvals, and establish
strategic partnerships to advance exploration and development activities.
Exploration Risks & Uncertainties
Forward-looking statements are subject to geological, financia l, and regulatory risks that may cause actual results to
differ materially from those anticipated. These risks include, but are not limited to:
Exploration risk: There is no guarantee that current exploration activities will result in an economically viable
mineral resource.
Drilling uncertainty: Trench and soil sampling results are not necessarily indicative of subsurface mineralization,
and drilling is required to confirm continuity, grade, and extent.
Permit and regulatory risks: Exploration activities are subject to government approvals, environmental
regulations, and permitting requirements.
Funding constraints: The Company’s ability to execute exploration programs depends on market conditions
and financing availability.
3
Commodity price volatility: Gold price fluctuations may impact the economic fe asibility of any future
discoveries.
Forward-looking statements contained in this news release are based on current expectations, estimates, forecasts, and
projections about Kalo Gold Corp.’s business, as well as beliefs and assumptions made by the Company’s management.
Readers are cautioned that forward-looking statements are based on assumptions that may not prove to be correct.
Actual results may differ materially due to several known and unknown risks and uncertainties that are beyond the
control of the Company.
Kalo Gold Corp. does not undertake any obligation to update or revise any forward-looking statements, except as
required by applicable securities la ws. Readers should not place undue re liance on forward-looking information
contained in this release.
For a more detailed discussion of risks an d uncertainties, please refer to Kalo Go ld Corp.’s public filings on SEDAR+ at
www.sedarplus.ca.
Figure 1: Plan map of the Namalau Trend – Dua showing drill collar locations as of August 2025.
4
Figure 2: Plan map of the Qiriyaga Complex – Vunisea showing drill collar location as of August 2025