Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

JG.V ·

Japan Gold Expands Project Portfolio with Acceptance of New Prospecting Rights Applications in Hokkaido, Japan

Mergers & Acquisitions Exploration Programs

TSX-V: JG

Japan Gold Corp.

Suite 650 – 669 Howe Street, Vancouver, BC V6C 0B4 Canada

Phone: +1 778-725-1491

www.japangold.com

NEWS RELEASE

Japan Gold Expands Project Portfolio with Acceptance of New Prospecting Rights Applications

in Hokkaido, Japan

July 28, 2017– Vancouver, BC - Japan Gold Corp. (TSX-V: JG) (OTCQB: JGLDF) (“Japan Gold” or the

“Company”) is pleased to announce that it has expanded its project portfolio in Japan with the addition of the

Tenryu Project and an extension to the Buho Project.

The Ministry of Economy, Trade and Industry (METI) has accepted a total of seven new prospecting rights

applications totaling 2,269.2 hectares. Japan Gold now holds priority over these areas and is authorized to

commence surface exploration. The Company’s project portfolio now comprises 59,606 hectares over 12 separate

projects on the three main islands of Japan.

John Proust, Chairman and CEO of Japan Gold, commented, “We are pleased to advance our strategy of acquiring

and developing underexplored gold projects in historically productive gold districts in Japan. These gold targets

have not yet been exposed to modern exploration techniques and offer excellent opportunities for potential new

discoveries. We look forward to advancing our asset base in this fi rst world jurisdiction for the benefit of all

shareholders.”

Tenryu Project

The new Tenryu Project consists of four contiguous prospecting rights applications covering an area of 1,267

hectares and is locate d three kilometres southeast of J apan Gold’s Aibetsu Project. (Refer to Figure 1 for the

location of the Tenryu applications in respect to geology, historic workings and the Aibetsu Project .) Little

information is available on the Tenryu workings which closed in the early 1940’s , however a cyanide gold

extraction plant was located four kilometres downstream of the now collapsed portal which is believed to have

processed ore from Tenryu and other workings nearby in the early 1940’s. Tenryu is hosted in similar volcanic

stratigraphy to the historic mine workings located within Japan Gold’s Aibetsu Project, t he most prominen t of

which, Tokusei produced 38,580 ounces of gold and 472,620 ounces of silver between 1930- 1942¹. The Metal

Mining Agency of Japan completed exploration activities over the Tokusei area between 1998 and 2002, which

culminated in five diamond drill holes for a total of 3,300 m with a peak result of 0.95 m @ 69 g/t gold and 263

g/t silver 2 from 500 m along strike of the mine structure.

Mapping from the 1:50,000 scale Japanese government geological map shows three parallel northeast trending

altered / mineralized zones over a 2.5 by 2 k m zone centered on the Tenryu working now covered by the Japan

Gold applications. A combination of stratigraphy, northeast mineralized structures and a lack of modern

exploration in the region makes this an attractive exploration target in the Company’s growing project portfolio in

Japan.

An initial reconnaissance survey of the area is planned to be completed this year so the pr oject may be ranked

against Japan Gold’s other projects for work prioritization.

Buho Project Extension

The Buho Project is located on the southern margin of the Akaigawa caldera in the Sappaoro- Iwanai mineral

district of southwest Hokkaido, which hosts over 65 hydrothermal metallic deposits. Epithermal mineral deposits

- 2 -

within the district include Chitose (736,000 oz Au @ 14.5 g/t); Tiene (352,000 oz Au @ 7.5 g/t); and Shizukari

(256,000 oz Au @ 7 g/t) 3.

The Buho Project extension comprises three contiguous prospecting rights applications surrounding the existing

Buho block . T he Buho P roject now comprises four applications covering 1,589 hectares (refer to F igure 2 ).

Workings at Buho were explored by the Austpac / Nishio Iwai Joint Venture between 1988 and 1992. Mapping,

geochemical sampling and CSAMT surveying cul minated in five drill holes. D rill hole DDH -B1 intersected a

north-south vein 140 m below exposed sinters on the main ridge and cut brecciated quartz and adularia vein

material giving a result of:

3.5 m @ 22.0 g/t Au and 42.0 g/t Ag, including 0.9 m @ 73 g/t Au and 65 g/t Ag4.

The presence of silica- sinter deposits at surface indicat e the epithermal system is well preserved or not eroded.

The new applications at the Buho Project are designed to cover potential extensions of the known vein system to

the north under younger volcanic cover.

The scale of the area will allow Japan Gold’s geologists to rapidly complete detailed mapping this year and make

decisions for further work requirements including geophysical-electrical methods and ultimately drill testing next

year.

On behalf of the Board of Japan Gold Corp.

“John Proust”

Chairman & CEO

About Japan Gold Corp.

Japan Gold Corp. is a Canadian mineral exploration company focused solely on gold and copper-gold exploration

in Japan. The Company has applied for 180 prospecting rights licenses in Japan for a combined area of 59,606

hectares over twelve separate projects. Thirty-two of the applications have been granted as Prospecting Rights.

The applications cover areas with known gold occurrences and a history of mining, and are prospective for both

high-grade epithermal gold miner alization and gold -bearing lithocaps, which could indicate the presence of

porphyry mineralization. Japan Gold’s leadership team has decades of resource industry and business experience,

and the Company has recruited geologists and technical advisors with experience exploring and operating in Japan.

More information is available at www.japangold.com or by email at [email protected].

Japan Gold Contacts

John Proust

Chairman & CEO

Phone: 778-725-1491

Email: [email protected]

References

1Watanabe, 1996. Genesis of Vein-hosting Fractures in the Kitami Region, Hokkaido, Japan. Resource Geology,

v46(3), pp 151-166, 1996.

2Metal Mining Agency of Japan, Geological Survey Report for Fiscal Year 2002, North Hokkaido Area.

- 3 -

3Garwin, Hall, Watanabe, 2005. Tectonic Setting, Geology, and Gold and Copper Mineralization in Cenozoic

Magmatic Arcs of Southeast Asia and the West Pacific, Economic Geology 100th Anniversary Volume pp. 891–

930.

4Austpac Gold NL. Company Reports, 1988 to 1994.

Cautionary Note

Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. The technical

information in this news release has been reviewed by Japan Gold’s President & Chief Operating Officer, Dr.

Mike Andrews, PhD, FAusIMM, who is a Qualified Person as defined by National Instrument 43-101.

This news release contains forward -looking statements relating to expected or anticipated future events and

anticipated results that are forward -looking in nature and, as a result, are subject to certain risks and

uncertainties, such as general economic, market and business conditions, competition for qualified staff, the

regulatory process and actions, technical issues, new legislation, uncertainties resulting from potential delays or

changes in plans, uncertainties resulting from working in a new political jurisdiction, uncertainties regarding the

results of exploration, uncertainties regarding the timing and granting of prospecting rights, uncertainties

regarding the Company’s ability to execute and implement future plans, and the occurrence of unexpected events.

Actual results achieved may vary from the information provided herein as a result of numerous known and

unknown risks and uncertainties and other factors.

- 4 -

Figure 1, Tenryu Project Applications on simplified geology with historic workings.

- 5 -

Figure 2, Buho Project applications, on simplified geology with historic workings.