Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

JG.V ·

Japan Gold Commences Drilling at the Ohra-Takamine Project

Exploration Programs

TSX-V: JG

OTCQB: JGLDF

Suite 650 – 669 Howe Street, Vancouver, BC V6C 0B4 Canada

Phone: +1 778-725-1491

www.japangold.com

NEWS RELEASE

Japan Gold Commences Drilling at the Ohra-Takamine Project

June 26, 2019 – Vancouver, BC – Japan Gold Corp. (TSX-V: JG) (OTCQB: JGLDF) (“Japan Gold”

or the “ Company”) is pleased to report commencement of Phase 1 scout drilling at the Ohra-Takamine

Project in the southern island of Kyushu following approval of its drill program by the Japanese Ministry

of Economy, Trade and Industry (“METI”).

Ohra-Takamine Phase 1 Drilling Program:

The Phase 1 scout drilling program will consist of an initial 4 drill holes, (~2,100 meters) to commence

testing an open-ended, 3.5 km corridor of alteration and epithermal mineralization. The alteration corridor

is host to three historic gold mines, the Ohra, Takamine and Urushi Mines that were in production until the

government-imposed closure occurred in 1943. Drilling will target extensions and parallel vein shoots

below and along strike of shallowly developed mine workings and also further along the alteration corridor

(refer to Figure 1). Diamond core-drilling will be carried out from surface by a company-owned PMC 700

drill rig capable of drilling to depths of up to 700 meters.

“We are very pleased to commence the first of our 2019 drilling program s in th e Southern Kyushu

Epithermal Gold Province, the same province which hosts several other significant historic high-grade gold

mines including the currently producing Hishikari Gold Mine, owned by Sumitomo Metal Mining Co. Ltd.

We also look forward to shortl y announcing commencement of our second 2019 drill program in North

Hokkaido, which will be targeting vein zones below the historic Kitano-o Gold Mine at our Ikutahara

Project”, John Proust, Chairman and CEO commented.

The initial phase of drilling is expected to continue for approximately three months and results will be

released as available.

For more information on the Company’s Projects, please visit our website www.japangold.com

Qualified Person

The technical information in this news release has been reviewed and approved by Japan Gold’s President

& Chief Operating Officer, Dr. Mike Andrews, PhD, FAusIMM, FSEG, who is a Qualified Person as

defined by National Instrument 43-101.

On behalf of the Board of Japan Gold Corp.

“John Proust”

Chairman & CEO

About Japan Gold Corp.

2

Japan Gold Corp. is a Canadian mineral exploration company focused solely on gold and copper -gold

exploration across the three largest islands of Japan: Hokkaido, Honshu and Kyushu. The Company holds

a portfolio of 12 Gold Projects which cover areas with known gold occurrences, a history of mining and

are prospective for high- grade epithermal gold mineralization. The Company also holds a portfolio of 5

Lithocap Projects which could indicate the presence of porphyry mineralization. Japan Gold's leadership

team has decades of resource industry and business experience, and the Company has recruited geologists

and technical advisors with experience exploring and operating in Japan. More information is available at

www.japangold.com or by email at [email protected].

For further information please contact:

John Proust

Chairman & CEO

Phone: 778-725-1491

Email: [email protected]

Website: www.japangold.com

Cautionary Note

Neither the TSX Venture Exchange nor its Regulation Services Provider (as such term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward -looking statements relating to expected or anticipated future events

and anticipated results related to future partnerships and the Company’s 2019 gold exploration program.

These statements are forward -looking in nature and, as a result, are subject to certain risks and

uncertainties that include, but are not limited to, general economic, market and business conditions;

competition for qualified staff; the regulatory process and actions; technical issues; new legislation;

potential delays or changes in plans; working in a new political jurisdiction ; results of exploration; the

timing and granting of prospecting rights; the Company’s ability to execute and implement future plans,

arrange or conclude a joint -venture or partnership; and the occurrence of unexpected events. Actual

results achieved may differ from the information provided herein and, consequently, readers are advised

not to place undue reliance on forward-looking information. The forward-looking information contained

herein speaks only as of the date of this News Release. The Company disclaims any intention or obligation

to update or revise forward ‐looking information or to explain any material difference between such and

subsequent actual events, except as required by applicable law.

3

Figure 1: Ohra-Takamine Project, Phase 1 Drill Proposal Plan

Production figures on Figure 1 referenced from:

1) Michitoshi, Miyahisa, 1967: Report of gold deposits survey in Takamine/Ohra district, Kagoshima

prefecture, Association of Kagoshima Prefecture mineral resources development promotion.

2) Gold Mines of Japan, 1989. The Mining & Materials Processing Institute of Japan.