Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

JAG.TO ·

Jaguar Mining Turmalina Exploration Results Extend Orebody C Down Plunge and Laterally Along Strike, Updates Infill Drilling

Exploration Programs

NEWS RELEASE

February 27, 2019 TSX: JAG

FOR IMMEDIATE RELEASE

Jaguar Mining Turmalina Exploration Results Extend Orebody C Down Plunge and Laterally

Along Strike, Updates Infill Drilling

Toronto, February 27, 2019 – Jaguar Mining Inc. ("Jaguar" or the "Company") (TSX: JAG) today announced

drilling results from 19 holes over 4,523m as part of its growth exploration drill program on Orebody C, and

46 holes over 4,708m from infill drilling (39 holes at C-SE and 7 holes at C-Central) completed since June 2018

(Refer News Release February 26 and June 18, 2018) at Turmalina Gold Mine (“Turmalina”). The growth drilling

focused on targeting Orebody C extensions down plunge and laterally along str ike, and to upgrade mineral

resources to mineral reserves.

Turmalina Exploration Highlights

● Drill results c onfirm the structure hosting Orebody C extends to depth beyond mine level 8 ,500m down

plunge (400m vertically) from current operations and remains open at depth

● Drill results confirm changes in the plunge direction of the higher-grade ore shoot as mapped structurally in

mine development on levels 3 and 4 in Q3 2018

● 4 growth exploration holes intersected grade x thickness of > 10 GM including an intercept of 7.08 g/t Au

over 3.85m (ETW 3.2m)

● Completed infill drilling on Orebody C to upgrade and covert mineral resources to mineral reserves between

levels 3 and 5

● Key infill drilling intersections on Orebody C-SE include 5.76 g/t Au over 29.63m (ETW 22.69m), 6.40 g/t

Au over 14.80m (ETW 12.56m) and 5.65 g/t Au over 26.54m (ETW 19.09m)

● Infill drilling continued to define wide; high-grade intercepts in 19 intersections with a grade x th ickness of

> 10 GM including 15 intersections with grade x thickness > 25 GM, 5 intersections with grade x thickness

> 50 GM and 3 intersections with grade x thickness > 100 GM

● 8 infill holes targeting Orebody C-Central based on the new plunge interpretation include two higher grade

intersections from the drilling in this area completed to date of 18.35 g/t Au over 8.76m (ETW 8.23m) and

9.95g/t Au over 2.29m (ETW 2. 0m). Intersections appear to define a high -grade plunging mineralized

shoot, which extends over a strike length of approximately 50m

Definitions: ETW – estimated true width, g/t Au – grams per tonne gold, m – metres, Grade (g/t Au) x Thickness

(m) = GM (gram – meters)

Ben Guenther Interim CEO, Jaguar Mining commented: “We continue to improve our geological understanding

of Orebody C through structural mapping, targeted growth drilling and prioritized infill drilling. This stra tegic

approach enables us to plan and develop shallow mineralization that will provide Turmalina with additional ore

faces and operational flexibilit y. Development of C Central will also provide exploration platforms for

C NW and extend the orebody latera lly to increase longer term production capability. We look forward to

reporting our update Mineral Resources and Mineral Reserves during March 2019.”

2

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Jon Hill, Expert Advisor, Geology and Exploration, Jaguar Mining Management Committee commented: “During

2018 exploration programs focused on upgrading mineral resource s to mineral reserves on both principle

orebodies at Turmalina. Concurrently, the Compan y has significantly advanced the understanding of the

structural and related geological controls on Orebody C mineralization through detailed geological mapping of

current and ongoing underground development. The recognition of a new plunge control to the distribution of

the higher grade and wider mineralized zones clearly broadens the potential to find additional higher -grade

mineralized “pay shoots” at shallower depths along the strike of the host structure and, more significantly, depth

extensions, down plunge from the C-Central and C-NW historically mined open pits.”

“The recent high-grade intercept on orebody C-Central with a grade x thickness value > 150 GM is encouraging

as we begin to evaluate previously under -tested areas assuming the newly identified plunge control. This work

is being prioritized as any increase in grade, tonnes and ounces per vertical meter added in shallow areas of

the mine may l everage access from existing infrastructure and provide more flexibility in the mine plan and

ultimately potential for higher production”.

Figure 1. Long Section of Turmalina mine and with Grade x Thickness projection and the location of the

growth exploration and infill drilling programmes completed to date. Please also note the new plunge

direction relative to that previously used showing the plunge control to high grade ore shoots on

Orebody C now approximating the plunge for the high-grade portion of Orebody A.

3

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Turmalina Orebody C Growth Exploration and Infill Drilling Results

Growth exploration drilling, targeting down dip extensions from level 4, continues to confirm the structure hosting

Orebody C extends to depth beyond mine level 8 approximately 500m down plunge and 400m vertically from

current operations. Importantly, this drilling successfully tested and confirmed the changes in the plunge

direction of the higher-grade ore shoot highlighted by earlier drilling and subsequently geologically – structurally

mapped in the mine development on levels 3 and 4 in Q3-2018 (Refer June 18, 2018 news release).

The new plunge direction assumed is N75/48 (azimuth / dip) (previous N45/55). This high-grade plunge direction

approximates the observed Orebody A high-grade zone plunge of N65/48.

Further drilling is planned for Q2 and Q3 2019 to fully test this ore-shoot between level 4 and level 8 once a new

drilling platform has been prepared for this purpose from the C-ramp on level 5. (Refer figure 2).

Infill drilling on Orebody C focusing on upgrading mineral resources to mineral reserves between levels 3 and 5

was prioritized in Q3 and Q4 to inform the Mineral Resources and Mineral Reserves update during March 2019.

This infill drilling continued to define wide; high-grade intercepts consistent with those previously reported (Refer

news releases dated June18, 2018 and February 26, 2018). In the results released today 19 intersections with

a grade x thickness of > 10 GM including 15 intersections with grade x thickness > 25 GM, 5 intersections with

grade x thickness > 50 GM and 3 intersections with grade x thickness > 100 GM. (Refer figure 3, table 2).

The observed change in the plunge control of the higher grade and wider parts of the Orebody Host Structure

has positive implications for interpreting and targeting additional shallow mineral ization further along the strike

of the Orebody C structure where clear potential exists for the identification and delineation of additional high

grade shoots below the C-Central and C-NW open pits.

Results are reported from 8 infill holes targeting Orebody C-Central along strike from Orebody C-SE (using the

mine drill rig) drilled as part of an ongoing drilling programme testing the potential for additional shallow,

structurally controlled “payshoots” associated with the new plunge interpretation. Two higher grade intersections

are reported from this drilling completed to date; 18.35 g/t Au over 8.76m (ETW 8.23m) and 9.95g/t Au over

2.29m (ETW 2.0m). These two holes define a high -grade plunging mineralized shoot, which extends over a

strike length currently estimated to be of the order of 50m in this area.

Further drilling and evaluation work targeting Orebodies C - Central and C -NW is in progress with the aim of

identifying and delineating mineable material close to existing development that is currently within 150m on

Orebody C-SE level 4. (Refer figure 4 and table 2).

Of Note, results and data from 18 infill drill holes out of the 46 infill drill hole results included in this report were

drilled after the database closed for the estimation at the end of 2018 Mineral Resources and Mineral Reserves.

The hole numbers and coordinate data for these 18 holes are included in Appendix 2.

4

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Turmalina Gold Mine Drill Results and Intercepts

Table 1. Growth Exploration Drilling Results Orebody C. (OREBODY – CSE)

Turmalina Gold Mine

Growth Exploration Drill Results Ore Body C

Hole ID From To Down Hole

Interval (m)

Estimated True

Width (m)

Gold Grade

(g/t)

GT

(ETW)

FTS1489 183.00 186.15 3.15 2.34 4.66 10.90

FTS1553 93.95 95.05 1.10 0.90 1.79 1.61

FTS1555 176.00 177.90 1.90 1.70 1.27 2.16

FTS1558

256.80 257.70 0.90 0.87 3.32 2.89

335.30 336.30 1.00 0.97 2.73 2.65

FTS1559 191.00 193.05 2.05 1.98 2.90 5.74

FTS1560 154.30 155.30 1.00 0.85 1.82 1.55

FTS1561 222.35 224.35 2.00 1.90 5.24 9.96

FTS1562 186.45 187.45 1.00 0.89 1.50 1.34

FTS1563 120.45 121.45 1.00 0.90 1.23 1.11

FTS1564 208.35 209.35 1.00 0.90 1.29 1.16

FTS1565 109.30 110.45 1.15 0.95 1.12 1.06

FTS1566 No impact

FTS1567 138.50 139.50 1.00 0.92 3.68 3.39

FTS1568 148.85 151.75 2.90 2.68 4.17 11.18

FTS1569

101.10 103.05 1.95 1.83 1.94 3.55

165.60 169.65 4.05 3.78 2.44 9.22

FTS1646 184.95 188.80 3.85 3.20 7.08 22.66

FTS1647 195.85 198.15 2.30 1.88 1.55 2.91

FTS1668 174.40 180.60 6.20 5.82 2.76 16.06

FTS1678 186.90 189.95 3.05 2.86 1.55 4.43

5

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Figure 2. Location of Growth Exploration Drilling Intersections - Orebody C-SE on Grade x Thickness

projection. Please note holes drilled early in the programme that drilled outside the newly identified

plunge controlling the high grade, wider parts of the targeted Orebody C Structure. Subsequent holes

targeting the new plunge direct ion intersected higher-grade mineralization. The area between level 8

and level 5 that remains untested will be drilled once a drilling site has been prepared off the C – Ramp

on level 5 for this purpose.

Please note assay results reported in the figure below were analyzed at the ALS Laboratory.

6

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Table 2. Infill Drilling Results Orebody C – Turmalina

Please note assay results reported in the tabulation below were analyzed at Jaguar’s Caeté Laboratory.

Turmalina Gold Mine

Infill Drill Results Ore Body C

Hole ID From To Down hole

Interval (m)

Estimated True

Width (m)

Gold Grade

(g/t)

GT

(ETW)

Drilling

Company

FTS1537 No impact JAGUAR

FTS1544* 65.20 72.38 7.18 6.99 2.78 19.43 JAGUAR

FTS1545* 74.95 79.10 4.15 3.75 7.57 28.39 JAGUAR

FTS1546* 67.70 69.80 2.10 1.80 4.44 7.99 JAGUAR

FTS1547A* 80.41 83.60 3.19 2.76 2.96 8.17 JAGUAR

FTS1574

82.54 85.44 2.90 2.58 2.80 7.22 JAGUAR

107.67 114.48 6.81 6.06 2.62 15.88 JAGUAR

FTS1627

77.79 80.42 2.63 2.58 3.55 9.16 JAGUAR

102.91 105.06 2.15 2.11 3.45 7.28 JAGUAR

FTS1628A

57.00 59.00 2.00 1.73 9.23 15.97 JAGUAR

73.00 75.00 2.00 1.63 5.13 8.36 JAGUAR

78.00 89.85 11.85 9.70 2.07 20.08 JAGUAR

94.60 96.00 1.40 1.23 4.73 5.82 JAGUAR

FTS1629

66.00 76.00 10.00 7.00 3.78 26.46 JAGUAR

82.00 88.00 6.00 4.24 8.41 35.66 JAGUAR

FTS1630 66.30 84.77 18.47 17.50 3.81 66.68 JAGUAR

FTS1631 56.73 73.00 16.27 14.95 3.82 57.11 JAGUAR

FTS1632 69.22 70.22 1.00 0.90 3.07 2.76 JAGUAR

FTS1649 21.80 35.03 13.23 11.45 1.72 19.69 JAGUAR

FTS1650

20.00 22.10 2.10 1.43 1.43 2.04 JAGUAR

27.35 29.39 2.04 1.76 2.50 4.40 JAGUAR

FTS1651 22.10 45.09 22.99 18.83 2.35 44.25 JAGUAR

FTS1652 29.34 58.97 29.63 22.69 5.76 130.69 JAGUAR

FTS1659

37.13 39.15 2.02 1.98 3.13 6.20 JAGUAR

42.23 43.27 1.04 1.02 4.68 4.77 JAGUAR

FTS1660 26.30 40.67 14.37 9.98 4.63 46.21 JAGUAR

FTS1661

20.70 33.67 12.97 9.17 1.61 14.76 JAGUAR

44.70 47.99 3.29 2.52 3.39 8.54 JAGUAR

FTS1662 32.82 50.72 17.90 15.65 5.03 78.72 JAGUAR

FTS1663

39.22 54.02 14.80 12.56 6.40 80.38 JAGUAR

59.68 68.07 8.39 7.03 2.72 19.12 JAGUAR

FTS1664

49.91 58.59 8.68 6.24 5.32 33.20 JAGUAR

63.22 76.45 13.23 9.51 7.79 74.08 JAGUAR

49.91 76.45 26.54 19.09 5.65 107.86 JAGUAR

FTS1682 48.28 52.08 3.80 2.95 1.23 3.63 JAGUAR

FTS1683

56.88 72.00 15.12 11.91 2.49 29.66 JAGUAR

78.94 79.63 0.69 0.54 20.35 10.99 JAGUAR

7

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

FTS1684

46.85 60.41 13.56 10.97 3.75 41.14 JAGUAR

65.83 68.61 2.78 2.19 8.42 18.44 JAGUAR

FTS1685 49.32 64.34 15.02 13.26 2.42 32.09 JAGUAR

FTS1686 54.10 58.01 3.91 3.51 4.56 16.01 JAGUAR

FTS1687 No impact JAGUAR

FTS1688 43.32 46.17 2.85 2.77 2.09 5.79 JAGUAR

FTS1690*

66.90 74.85 7.95 7.20 2.00 14.40 JAGUAR

105.70 114.46 8.76 8.23 18.35 151.02 JAGUAR

FTS1691*

60.81 61.67 0.86 0.79 1.66 1.31 JAGUAR

81.38 82.36 0.98 0.83 1.51 1.25 JAGUAR

99.65 100.60 0.95 0.86 1.09 0.94 JAGUAR

FTS1692* 137.00 139.29 2.29 2.00 9.95 19.90 JAGUAR

FTS1693* 123.44 124.31 0.87 0.71 4.13 2.93 JAGUAR

FTS1717 100.18 102.20 2.02 1.90 6.20 11.78 JAGUAR

FTS1671 101.00 108.30 7.30 6.32 4.07 25.72 MAJOR

FTS1672 49.91 58.59 8.68 6.24 5.32 33.20 MAJOR

FTS1673 80.60 88.85 8.25 8.00 5.25 42.00 MAJOR

FTS1674

62.50 65.00 2.50 1.05 10.95 11.50 MAJOR

88.45 92.50 4.05 2.02 3.60 7.27 MAJOR

FTS1675 112.00 113.00 1.00 0.76 10.01 7.61 MAJOR

FTS1676

88.00 98.00 10.00 9.06 1.63 14.77 MAJOR

104.60 110.50 5.90 5.34 3.34 17.84 MAJOR

FTS1677

82.67 88.14 5.47 4.91 2.81 13.80 MAJOR

95.70 98.59 2.89 2.45 6.31 15.46 MAJOR

FTS1706 78.00 91.00 13.00 12.05 3.94 47.48 MAJOR

FTS1707

62.75 65.00 2.25 2.11 2.22 4.68 MAJOR

89.30 91.60 2.30 2.16 13.13 28.36 MAJOR

FTS1708 95.65 96.65 1.00 0.85 7.76 6.59 MAJOR

FTS1709 109.60 111.75 2.15 1.90 8.70 16.53 MAJOR

FTS1711 84.00 94.80 10.80 8.50 5.73 48.71 MAJOR

* Infill Drilling Results Orebody C - CENTRAL

8

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Figure 3. Infill Drilling Results and Grade x Thickness Plot - Orebody C-SE

Please note assay results reported in the figure below were analyzed at Jaguar´s Caeté Laboratory.