Jaguar Mining Reports Financial Results FOR the Third Quarter 2024 __________________________________________________________________________________________

Financials

1

JAGUAR MINING INC.

1400-25 Adelaide Street East, Toronto, Ontario M5C 3A1 T: 416-847-1854

JAGUAR MINING REPORTS FINANCIAL RESULTS FOR THE THIRD QUARTER 2024

__________________________________________________________________________________________

Toronto, November 8, 2024 – Jaguar Mining Inc. ("Jaguar" or the "Company") (TSX:JAG, OTCQX:JAGGF)

today announced financial and operating results for the third quarter ended September 30, 2024. All figures are in

US Dollars, unless otherwise expressed.

Third Quarter Highlights

• Gold production was 16,912 ounces, marginally lower than the 17,316 ounces produced in the third quarter of

2023. The net reduction reflects 16% fewer tonnes processed, substantially offset by 24% higher head grades.

• Gold sold was 15,726 ounces, representing a 5% decrease from the 16,502 ounces sold in the third quarter of

2023, mainly reflecting the slightly lower year-over-year production. Realized gold prices for the quarter were

$2,474 per ounce, an increase of 29% over the $1,916 per ounce realized in the third quarter of 2023.

• Cash operating costs per ounce¹ sold decreased by 7% to $1,101 per ounce of gold sold from $1,188 per ounce

of gold sold in the third quarter of 2023, reflecting a 12% reduction in Operating Costs.

• All-in sustaining costs (AISC) per ounce¹ increased by 7% to $1,831 per ounce of gold sold from $1,7 04 per

ounce of gold sold in the third quarter of 2023. The increase mainly reflects higher sustaining capital

investments in the Faina zone at the Turmalina mine, which became operational in the second quarter of 2024

and is still in the process of ramping up production.

• As the Faina zone had its first production and gold sales during the second quarter of 2024 , its ongoing

development costs were reclassified from growth capital to sustaining capital. Over $2.0 million of growth capital

incurred during the second quarter was reclassified in the current quarter to sustaining capital, which generated

a negative figure for reported mine site non-sustaining capital at the Turmalina mine.

• The elevated rate of development capital invested in the Faina zone during the quarter was to support the

planned ramp-up of production in 2025 from this zone. Low production volume of 1,819 ounces from the Faina

zone, combined with high levels of sustaining capital which included the catch -up of second quarter 2024

sustaining capital, resulted in the Turmalina mine’s AISC per ounce sold being elevated this quarter.

• Revenue for the quarter was $ 38.9 million, representing a 23% increase from the $31.6 million in revenue in

the third quarter of 2023. This increase was driven by higher realized gold prices year -over-year and w as

partially offset by fewer ounces sold.

• Operating costs for the quarter were $ 17.3 million, a reduction of 12% compared to operating costs of $ 19.6

million in the third quarter of 2023.

• Net income for the quarter was $2.3 million, a decrease of $1.5 million compared to net income of $3.8 million

in the third quarter of 2023. Adjusted net income 1 for the quarter , excluding the impact of $6.0 million in

provisions for civil and labour litigations, was $8.3 million ($0.10 per share).

2

JAGUAR MINING INC.

1400-25 Adelaide Street East, Toronto, Ontario M5C 3A1 T: 416-847-1854

• Free cash flow1 for the quarter was $4.8 million, an increase of $3.3 million compared to free cash flow of $1.5

million in the third quarter of 2023. Free cash flow per ounce1 sold for the quarter was $306 per ounce compared

to $92 per ounce in the third quarter of 2023. Free cash flow is defined as operating cash flow less asset

retirement obligation expenditures and sustaining capital expenditures.

Cash position and working capital1

• As of September 30, 2024, the Company had cash and cash equivalents of $ 41.6 million, compared to a

balance of $22.0 million at December 31, 2023. Cash and cash equivalents increased by approximately $19.6

million during the first nine months of the year, mainly reflecting the impact of higher realized gold prices and

the receipt of other accounts receivable of $4.0 million from BHP in March 2024.

Vern Baker, President and CEO of Jaguar, stated : “ Results for this quarter reflect our continued focus on the

development of new mining areas at both of our operations. We are encouraged by the Faina zone at the Turmalina

mine which contributed 1,819 ounces to our production from a combination of development ore and our first stoping

block. Overall grades were at an average head grade of 4.39 g/t. The stoping tonnes were less than half the total

tonnage processed at average grades of over 5.0 g/t. Development of this area is going well and in the fourth

quarter we expect to increase both development me ters and diamond drilling meters at the Faina zone. In 2025 ,

we plan to continue developing at high er rates and expect to see an increase in production to full rates starting in

2026.

Development of the BA zone at the Pilar mine also continued. Accesses reaching or progressing towards five

separate sub-levels of the BA zone continued during the quarter for the purposes of test stoping in several levels

starting in the fourth quarter. Diamond drilling also continued and our next MRMR update should reflect ounces in

this part of the BA zone.

The focus on development of new sub-levels for the purpose of future production at both mines led to limited work

in historical mining areas during the quarter, resulting in lower tonnes processed and higher waste tonnes moved.

Efforts to maximize production grades combined with the addition of the higher-grade Faina ore led to improved

head grades. Our average head grade increased significantly year-over-year from 2.95 g/t to 3.67 g/t.

On the cost side, our cash operating costs per ounce were 7% lower , the result of the higher grades, while our

AISC’s increased due to the inclusion of development expenditures as sustaining capital at the Faina zone rather

than as growth capital as in prior quarters. The elevated A ISC per ounce seen this quarter is expected to improve

as production at Faina increases.

During the quarter, we continued to benefit from a strong realized gold price. We added over $4 million in cash and

ended the quarter with approximately $42 million dollars, almost doubling our cash position over the past nine

months. This positions us to continue investing in the development of our ore zones which will grow ounce

production. It also allows us to invest in additional projects which support our growth plan to significantly increase

production over the next five years.”

1 This is a Non -GAAP financial performance measure with no standard definition under IFRS. For more details, refer to the Non -GAAP

Performance Measures section of the MD&A

3

JAGUAR MINING INC.

1400-25 Adelaide Street East, Toronto, Ontario M5C 3A1 T: 416-847-1854

Third Quarter 2024 Results

($ thousands, except where indicated) Three months ended Nine months ended

September 30 September 30

2024 2023 2024 2023

Financial Data

Revenue $38,910 $31,621 $116,266 $100,656

Operating costs 17,313 19,603 55,525 59,677

Depreciation 4,941 6,697 19,930 18,682

Gross profit 16,656 5,321 40,811 22,297

Net income 2,304 3,785 18,600 5,154

Per share ("EPS") 0.03 0.05 0.24 0.07

Adjusted Net income 1,3 8,301 3,785 25,083 5,154

Adjusted EPS 1,3 0.10 0.05 0.32 0.07

EBITDA 12,267 11,354 49,442 29,813

Adjusted EBITDA 1,2 19,853 10,187 53,555 33,223

Adjusted EBITDA per share 1,2 0.25 0.14 0.68 0.45

Cash operating costs (per ounce sold) 1 1,101 1,188 1,101 1,138

All-in sustaining costs (per ounce sold) 1 1,831 1,704 1,643 1,682

Average realized gold price (per ounce)1 2,474 1,916 2,305 1,920

Cash generated from operating activities 12,751 6,346 41,626 26,684

Free cash flow1 4,807 1,524 23,547 7,247

Free cash flow (per ounce sold) 1 306 92 467 138

Sustaining capital expenditures 1 9,650 6,534 21,055 22,053

Non-sustaining capital expenditures1 866 5,038 8,510 10,788

Total capital expenditures 10,516 11,572 29,565 32,841

1 Average realized gold price, sustaining and non-sustaining capital expenditures, cash operating costs and all-in sustaining costs, free cash flow,

adjusted net income, adjusted earnings per share, EBITDA and adjusted EBITDA, and adjusted EBITDA per share are non-GAAP financial performance

measures with no standard definition under IFRS. Refer to the Non-GAAP Financial Performance Measures section of the MD&A.

2 Adjusted EBITDA excludes non-cash items such as impairment, foreign exchange, stock-based compensation and write downs. For more details refer to

the Non-GAAP Performance Measures section of the MD&A.

3 Excluding the impact ($6.0 million) of provisions for civil litigation ($2.7 million) and labour litigation ($3.3 million) in Q3 2024.

and the impact of ($6.5 million) of provisions for civil litigation ($2.7 million) and labour litigation ($3.8 million) in the nine months ended September 30,

2024.

Three months ended Nine months ended

September 30 September 30

2024 2023 2024 2023

Operating Data

Gold produced (ounces) 16,912 17,316 49,918 52,222

Gold sold (ounces) 15,726 16,502 50,440 52,427

Primary development (metres) 1,824 1,027 4,622 3,837

Exploration development (metres) 89 523 567 1,142

Secondary development (metres) 1,411 1,417 3,706 4,060

Definition, infill, and exploration drilling (metres) 10,140 14,575 26,212 34,650

4

JAGUAR MINING INC.

1400-25 Adelaide Street East, Toronto, Ontario M5C 3A1 T: 416-847-1854

Non-GAAP performance

The Company has included the following Non-GAAP performance measures in this document: cash operating costs

per ounce of gold sold, all-in sustaining costs per ounce of gold sold, average realized gold price (per ounce of gold

sold), sustaining capital expenditures, non-sustaining capital expenditures, adjusted operating cash flow, free cash

flow, earnings before interest, taxes, depreciation and amortization (EBITDA), adjusted EBIT DA and working

capital. These Non-GAAP performance measures do not have any standardized meaning prescribed by IFRS and,

therefore, may not be comparable to similar measures presented by other companies.

The Company believes that, in addition to conventional measures prepared in accordance with IFRS, certain

investors use this information to evaluate the Company’s performance. Accordingly, they are intended to provide

additional information and should not be considered in isolation or as a substitute for measures of performance

prepared in accordance with IFRS. More specifically, Management believes that these figures are a useful indicator

to investors and management of a mine’s performance as they provide : (i) a measure of the mine’s cash margin

per ounce, by comparison of the cash operating costs per ounce to the price of gold; (ii) the trend in costs as the

mine matures; and (iii) an internal benchmark of performance to allow for comparison against other mines. The

definitions of these performance measures and reconciliation of the Non -GAAP measures to reported IFRS

measures are outlined below.

Reconciliation of Sustaining Capital and Non-Sustaining Capital expenditures1

($ thousands) Three months ended Nine months ended

September 30 September 30

2024 2023 2024 2023

Sustaining capital1

Primary development $ 7,358 $ 3,918 $ 15,202 $ 14,620

Brownfield exploration 358 617 998 1,403

Mine-site sustaining 1,832 1,378 4,545 5,169

Equipment 1,832 1,378 4,545 5,169

Other sustaining capital2 102 621 310 861

Total sustaining capital1 9,650 6,534 21,055 22,053

Non-sustaining capital (including capital

projects)1

Mine-site non-sustaining (840) 3,326 5,534 8,172

Asset retirement obligation - non-

sustaining2 1,706 1,712 2,976 2,616

Total non-sustaining capital1 866 5,038 8,510 10,788

Total capital expenditures $ 10,516 $ 11,572 $ 29,565 $ 32,841

1 Sustaining and non-sustaining capital are non-GAAP financial measures with no standard definition under IFRS. Refer to the non-GAAP Financial

Performance Measures section of the MD&A. Capital expenditures are included in the calculation of all-in sustaining costs and all-in costs.

2 Asset retirement obligation - non-sustaining is related to expenditures with dam closing projects. Payments related to the Company asset retirement

obligation are classified as operating activities in accordance with IFRS financial measures.

5

JAGUAR MINING INC.

1400-25 Adelaide Street East, Toronto, Ontario M5C 3A1 T: 416-847-1854

Reconciliation of Free Cash Flow1

Reconciliation of Cash Operating Costs, All-In Sustaining Costs and All-In Costs per Ounce Sold1

($ thousands, except where indicated) Three months ended Nine months ended

September 30 September 30

2024 2023 2024 2023

Cash generated from operating activities $ 12,751 $ 6,346 $ 41,626 $ 26,684

Adjustments

Asset Retirement Obligation 1,706 1,712 2,976 2,616

Sustaining capital expenditures2 (9,650) (6,534) (21,055) (22,053)

Free cash flow $ 4,807 $ 1,524 $ 23,547 $ 7,247

Ounces of gold sold 15,726 16,502 50,440 52,427

Free cash flow per ounce sold $ 306 $ 92 $ 467 $ 138

1 This is a non-GAAP financial performance measure with no standard definition under IFRS.

2 Further detail on the sustaining capital expenditures composition can be found on the reconciliation of sustaining capital and non-sustaining capital

expenditures in the non-GAAP reconciliation.

($ thousands, except where indicated) Three months ended Nine months ended

September 30 September 30

2024 2023 2024 2023

Operating costs $ 17,313 $ 19,603 $ 55,525 $ 59,677

General & administration expenses 1,755 1,786 5,650 5,475

Corporate stock-based compensation 6 39 442 834

Sustaining capital expenditures¹ 9,650 6,534 21,055 22,053

All-in sustaining cash costs 28,724 27,962 82,672 88,039

Reclamation (operating sites) 64 160 208 160

All-in sustaining costs $ 28,788 $ 28,122 $ 82,880 $ 88,199

Non-sustaining capital expenditures 866 5,038 8,510 10,788

Exploration and evaluation costs (greenfield) 510 819 1,470 2,751

Reclamation (non-operating sites) (59) (4) (125) (2)

Care and maintenance (non-operating sites) 166 195 506 538

All-in costs $ 30,271 $ 34,170 $ 93,241 $ 102,274

Ounces of gold sold 15,726 16,502 50,440 52,427

Cash operating costs per ounce sold² $ 1,101 $ 1,188 $ 1,101 $ 1,138

All-in sustaining costs per ounce sold² $ 1,831 $ 1,704 $ 1,643 $ 1,682

All-in costs per ounce sold² $ 1,925 $ 2,071 $ 1,849 $ 1,951

Average realized gold price $ 2,474 $ 1,916 $ 2,305 $ 1,920

Cash operating margin per ounce sold $ 1,373 $ 728 $ 1,204 $ 782

All-in sustaining margin per ounce sold $ 643 $ 212 $ 662 $ 238

1 Capital expenditures are included in our calculation of all-in sustaining costs and all-in costs.

2 Cash operating costs, all-in sustaining costs and all-in costs are all non-GAAP financial performance measures with no standard definition under

IFRS. Result may not calculate due to rounding.

6

JAGUAR MINING INC.

1400-25 Adelaide Street East, Toronto, Ontario M5C 3A1 T: 416-847-1854

Reconciliation of Net Income to EBITDA and Adjusted EBITDA 1

($ thousands, except where indicated) Three months ended Nine months ended

September 30 September 30

2024 2023 2024 2023

Net Income $ 2,304 $ 3,785 $ 18,600 $ 5,154

Income tax expense 3,401 - 7,923 3,417

Finance costs 1,588 854 2,889 2,505

Depreciation and amortization 4,974 6,715 20,030 18,737

EBITDA1 $ 12,267 $ 11,354 $ 49,442 $ 29,813

Changes in other provisions and VAT taxes 7,061 536 7,878 964

Foreign exchange loss (gain) 519 (1,742) (4,207) 1,612

Stock-based compensation 6 39 442 834

Adjusted EBITDA1 $ 19,853 $ 10,187 $ 53,555 $ 33,223

Weighted average outstanding shares 79,236,709 73,973,766 79,132,709 73,089,569

Adjusted EBITDA per share1 $ 0.25 $ 0.14 $ 0.68 $ 0.45

1 This is a non-GAAP financial performance measure with no standard definition under IFRS.

Working Capital1

($ thousands)

September 30 December 31

2024 2023

Cash and cash equivalents $ 41,599 $ 22,041

Other current assets:

Restricted cash 978 897

Inventory 16,402 15,639

Recoverable taxes 4,504 5,584

Other accounts receivable 298 310

Prepaid expenses and advances 2,084 1,556

Current liabilities:

Accounts payable and accrued liabilities (16,012) (16,082)

Notes payable (3,041) (3,295)

Lease liabilities (1,434) (1,953)

Current tax liability (2,699) (1,381)

Other taxes payable (820) (1,334)

Reclamation provisions (3,784) (4,298)

Legal and other provisions (8,319) (5,068)

Working capital¹ $ 29,756 $ 12,616

1 This is a non-GAAP financial performance measure with no standard definition under IFRS.

Qualified Person

Scientific and technical information contained in this press release has been reviewed and approved by Jonathan

Victor Hill, BSc (Hons) (Economic Geology - UCT), FAUSIMM, Advisor Exploration and Geology to Jaguar Mining

7

JAGUAR MINING INC.

1400-25 Adelaide Street East, Toronto, Ontario M5C 3A1 T: 416-847-1854

Inc., and is a "qualified person" as defined by National Instrument 43 -101 - Standards of Disclosure for Mineral

Projects ("NI 43-101").

The Iron Quadrangle

The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in

1699–1701 of gold contaminated with iron and platinum -group metals in the southeastern corner of the Iron

Quadrangle gave rise to the name of the town Ouro Preto (Black Gold). The Iron Quadrangle contains world -class

multi-million-ounce gold deposits such as Morro Velho, Cuiabá, and São Bento. Jaguar holds the second largest

gold land position in the Iron Quadrangle with over 42,000 hectares.

About Jaguar Mining Inc.

Jaguar Mining Inc. is a Canadian -listed junior gold mining, development, and exploration company operating in

Brazil with three gold mining complexes and a large land package with significant upside exploration potential from

mineral claims. The Company's principal operating assets are located in the Iron Quadrangle, a prolific greenstone

belt in the state of Minas Gerais and include the MTL Mining Complex (Turmalina mine and plant) and Caeté Mining

Complex (Pilar and Roça Grande mines, and Caeté plant). The Roça Grande mine has been on temporary care

and maintenance since April 2019. The Company also owns the Paciência Mining Complex (Santa Isabel mine and

plant), which ha d been on care and maintenance since 2012 and is planned to restart in early 2025 . Additional

information is available on the Company's website at www.jaguarmining.com.

For further information please contact:

Vernon Baker

Chief Executive Officer

Jaguar Mining Inc.

[email protected]

416-847-1854

Alfred Colas

Chief Financial Officer

Jaguar Mining Inc.

[email protected]

416-847-1848

Forward-Looking Statements

Certain statements in this news release constitute "forward -looking information" within the meaning of applicable Canadian securities

legislation. Forward-looking statements and information are provided for the purpose of providing information about manage ment's

expectations and plans relating to the future. All of the forward -looking information made in this news release is qualified by the

cautionary statements below and those made in our other filings with the securities regulators in Canada. Forward-looking information

contained in forward -looking statements can be identified by the use of words such as "are expected," "is forecast," "is targeted,"

"approximately," "plans," "anticipates," "projects," "anticipates," "continue," "estimate," "believe" or variations of such words and phrases

or statements that certain actions, events or results "may," "could," "would," "might," or "will" be taken, occur or be achie ved. All

statements, other than statements of historical fact, may be considered to be or include forward-looking information. This news release

contains forward-looking information regarding, among other things, expected sales, production statistics, ore grades, tonnes milled,

recovery rates, cash operating costs, definition/delineation drilling, th e timing and amount of estimated future production, costs of

production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration, development

and mining activities, currency fluctuations, capital requirements, project studies, mine life extensions, restarting suspended or disrupted

8

JAGUAR MINING INC.

1400-25 Adelaide Street East, Toronto, Ontario M5C 3A1 T: 416-847-1854

operations, continuous improvement initiatives, and resolution of pending litigation. The Company has made numerous assumptio ns

with respect to forward-looking information contained herein, including, among other things, assumptions about the estimated timeline

for the development of its mineral properties; the supply and demand for, and the level and volatility of the price of, gold; the accuracy

of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; th e receipt of

necessary permits; market competition; ongoing relations with employees and impacted communities; political and legal developments

in any jurisdiction in which the Company operates being consistent with its current expectations including, without limitation, the impact

of any potential power rationing, tailings facility regulation, exploration and mine operating licenses and permits being obt ained and

renewed and/or there being adverse amendments to mining or other laws in Brazil and any changes to general business and economic

conditions. Forward-looking information involves a number of known and unknown risks and uncertainties, including among others: the

risk of Jaguar not meeting the forecast plans regarding its operations and financial performance; uncertainties with respect to the price

of gold, labour disruptions, mechanical failures, increase in costs, environmental compliance and change in environmental leg islation

and regulation, weather delays and increased costs or production delays due to natural disasters, power disruptions, procurement and

delivery of parts and supplies to the operations; uncertainties inherent to capital markets in general (including the sometim es volatile

valuation of securities and an uncertain ability to raise n ew capital) and other risks inherent to the gold exploration, development and

production industry, which, if incorrect, may cause actual results to differ materially from those anticipated by the Company and

described herein. In addition, there are risks a nd hazards associated with the business of gold exploration, development, mining and

production, including environmental hazards, tailings dam failures, industrial accidents and workplace safety problems, unusu al or

unexpected geological formations, pressures, cave-ins, flooding, chemical spills, procurement fraud and gold bullion thefts and losses

(and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Accordingly, readers shou ld not place

undue reliance on forward-looking information.

For additional information with respect to these and other factors and assumptions underlying the forward-looking information made in

this news release, see the Company's most recent Annual Information Form and Management's Discussion and Analysis, as well as

other public disclosure documents that can be accessed under the issuer profile of "Jaguar Mining Inc." on SEDAR + at

www.sedarplus.com. The forward-looking information set forth herein reflects the Company's reasonable expectations as at the date of

this news release and is subject to change after such date. The Company disclaims any intention or obligation to update or revise any

forward-looking information, whether as a result of new information, future events or otherwise, other than as required by l aw. The

forward-looking information contained in this news release is expressly qualified by this cautionary statement.

Non-IFRS Measures

This news release provides certain financial measures that do not have a standardized meaning prescribed by IFRS. Readers are

cautioned to review the below stated footnotes where the Company expands on its use of non-IFRS measures.

1. Cash operating costs and cash operating cost per ounce are non-IFRS measures. In the gold mining industry, cash operating costs and

cash operating costs per ounce are common performance measures but do not have any standardized meaning. Cash operating costs

are derived from amounts included in the Consolidated Statements of Comprehensive Income (Loss) and include mine -site operating

costs such as mining, processing and administration, as well as royalty expenses, but exclude depreciation, depletion, share -based

payment expenses, and reclamation costs. Cash operating costs per ounce are based on ounces produced and are calculated by

dividing cash operating costs by commercial gold ounces produced; US$ cash operating costs per ounce produced are derived fro m

the cash operating costs per ounce produced translated using the average Brazilian Central Bank R$/US$ exchange rate. The Company

discloses cash operating costs and cash operating costs per ounce, as it believes those measures provide valuable assistance to

investors and analysts in evaluating the Company's operational performance and ability to generate cash flow. The most direct ly

comparable measure prepared in accordance with IFRS is total production costs. A reconciliation of cash operating costs per ounce to

total production costs for the most recent reporting period, the quarter ended September 30. 2024, is set out in the Company's third

quarter 2024 Management Discussion and Analysis (MD&A) filed on SEDAR+ at www.sedarplus.com.

2. All-in sustaining cost is a non-IFRS measure. This measure is intended to assist readers in evaluating the total costs of producing gold

from current operations. While there is no standardized meaning across the industry for this measure, except for non -cash items the

Company's definition conforms to the all -in sustaining cost definition as set out by the World Gold Council in its guidance note dated

June 27, 2013. The Company defines all -in sustaining cost as the sum of production costs, sustaining capital (capital required to

maintain current operations at existing levels), corporate general and administrative expenses, and in -mine exploration expenses. All-

in sustaining cost excludes growth capital, reclamation cost accretion related to current operations , interest and other financing costs,

and taxes. A reconciliation of all -in sustaining cost to total production costs for the most recent reporting period, the quarter ended

September 30. 2024, is set out in the Company's third quarter 2024 MD&A filed on SEDAR+ at www.sedarplus.com.