Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

JAG.TO ·

Jaguar Announces Turmalina Mine Infill Diamond Drill Results, Resumption Of Growth Exploration Drilling Infill diamond drilling results confirm model grades and thickness of main orebodies , Orebody A: 15.22 g/t Au over 8.36m (including 20.20 g/t Au over 5.55m)

Drill Results

NEWS RELEASE

January 28, 2020 TSX: JAG

FOR IMMEDIATE RELEASE

Jaguar Announces Turmalina Mine Infill Diamond Drill Results,

Resumption Of Growth Exploration Drilling

Infill diamond drilling results confirm model grades and thickness of main orebodies

,

Orebody A: 15.22 g/t Au over 8.36m (including 20.20 g/t Au over 5.55m)

Orebody C: 8.02 g/t Au over 7.66m (including 19.35 g/t Au over 2.75m)

Toronto, January 2 8, 2020 – Jaguar Mining Inc. ("Jaguar" or the "Company") (TSX: JAG) is pleased to

announce results of its 2019 Infill diamond drilling campaign and the resumption of growth exploration drilling

activities at its Turmalina Mine Operation (“Turmalina”).

Infill drilling completed in 2019 confirms expected modelled grade and thickness of both Orebody A and Orebody

C which are the source of current production. This drilling is expected to support replacement of Mineral

Reserves net of 2019 production depletion.

Definitions: ETW – estimated true width, g/t Au – grams per tonne gold, m – metres, grade (g/t Au) x thickness

(m) = GM (gram – metres)

At Turmalina, 11 infill drilling intersections reported grade (g/t Au) x thickness (m) results > 25 GM (refer to Table

1, Figure 1 and Appendix 1 , 2) with the best results from Orebody A , including 15.22 g/t Au over 8.36m

(including 20.20 g/t Au over 5.55m) and Orebody C including 8.02 g/t Au over 7.66m (including 19.35 g/t

Au over 2.75m).

Contractors, Major Drilling , have mobilized an underground diamond rig dedicated to growth exploration at

Turmalina through 2020. This drilling will initially focus on evaluating the important C-SE Block between level 6

and level 8 and below current level 8 access development as well as test priority targets on Orebody A, Orebody

B and C-Central / NW (Figure 1). The location of planned and targeted 2020 infill and growth exploration drilling

is presented in Figure 2.

Vern Baker CEO, Jaguar Mining commented : “Resumption of growth expl oration drilling at Turmalina is an

important milestone in Jaguar´s ongoing transformatio n to stabilize, grow and sustain production from its key

operations in the prolific Iron Quadrangle of Bra zil. The highly successful prior cycle of growth exploration

Investment by Jaguar , commenced in late 2016 , culminated in a material increase in the company’s Mineral

Resource inventory in 2017 -2018 and Mineral R eserve inventory in early 2019 . Infill Drilling activities at

Turmalina in 2019 are expected to replace 2019 mine depletion. With a sustained four-year reserve inventory

underpinning the Company’s planned production at current mining rates going forward, this growth exploration

cycle will focus on adding new, high -quality Mineral Resource and Mineral Reserve ounces contiguous with

existing mining infrastructure, while leveraging existing excess pl ant capacity. In parallel, the exploration team

is working to progress the next generation of priority, near-mine brownfields targets, supporting the Company’s

immediate and longer-term growth objectives.”

Jon Hill, Expert Advisor, Geology and Explorat ion, Jaguar Mining Management Committee commented : “The

previous investment in the growth exploration cycle (2016-2019) at Jaguar, successfully provided the company

with a solid and sustainable four-year reserve inventory at low discovery and conversion costs. This new cycle

of growth exploration will focus on targeting a number of clear, near-term productivity and growth opportunities,

which have been either recently discovered, recognized or under-explored mineralized zones. These compelling

targets have been generated through a combination of high -quality geological and structural mapping and

careful review of historical data by the Geology and Exploration Team. The benefits of this approach are proven,

and we expect to once again deliver material value t o Jaguar via strong, researched drill programs supported

by a successful and highly motivated team.”

2

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Turmalina Gold Mine Drill Results showing intercepts reporting greater than 25 gram meters.

Figure 1. Location Infill Drilling Impacts Orebody A, Orebody C-SE and C-Central On Grade X Thickness

Projection.

3

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Table 1. 2019 Infill Drilling Results Orebody A and Orebody C-Central.

Summary of Significant Intersections with greater than 25 gram metres

Jaguar Mining Inc. – Turmalina Mine

Hole ID From

(m)

To

(m)

Down Hole

Interval (m)

Estimated

True Width

(m)

Gold Grade

(g/t Au)

GT

(ETW)

Date

(mm/dd/yyyy) Orebody

FTS1727

103.68 118.48 14.80 12.12 2.45 29.69

5/28/2019

A

131.73 146.11 14.38 11.77 5.56 65.44 A

Including 139.16 143.30 4.14 3.38 12.69 42.91 A

FTS1728 142.68 151.58 8.90 8.36 15.22 127.24 A

Including 143.84 149.74 5.90 5.55 20.20 112.13 A

FTS1729 83.03 89.99 6.96 5.70 4.39 25.02 5/14/2019 A

FTS1731 94.85 106.08 11.23 9.52 3.35 31.89 5/10/2019 A

FTS1740 125.50 136.15 10.65 7.66 8.02 61.43

6/24/2019

C-Central

Including 130.29 134.12 3.83 2.75 19.35 53.21 C-Central

FTS1747 144.51 150.44 5.93 4.67 5.43 25.36 7/4/2019 A

FTS1748 146.79 157.82 11.03 9.03 8.62 77.84

7/5/2019

A

Including 151.50 155.23 3.73 3.00 18.64 55.92 A

FTS1754 150.72 156.51 5.79 4.56 5.49 25.03 7/1/2019 C-Central

FTS1755 92.86 96.03 3.17 2.65 16.65 44.12 7/11/2019 A

FTS1763 50.64 54.48 3.84 3.58 7.04 25.20

9/13/2019

CSE

FTS1764 55.62 58.45 2.83 2.5 29.03 72.58 CSE

4

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Figure 2. Location of 2020 Infill and Growth Exploration Drilling in Orebody A, Orebody C -SE and C -

Central.

2

5

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Figure 3. Location of 2020 Infill and Growth Exploration Drilling in Orebody A, Orebody C -SE and C -

Central.

Table 2. Metreage of 2020 Infill and Growth Exploration Drilling Turmalina Mine.

3

6

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Qualified Person

Scientific and technical information contained in this press release has been reviewed and approved by

Jonathan Victor Hill, BSc (Hons) (Economic Geology - UCT), FAUSIMM, Senior Expert Advisor Geology and

Exploration to the Jaguar Mining Management Committee, who is also an employee of Jaguar Mining Inc., and

is a “qualified person” as defined by National Instrument 43 -101 - Standards of Disclosure for Mineral Projects

(“NI 43-101”).

Quality Control

Jaguar continues to use a quality-control program that includes insertion of blanks and commercial standards in

order to ensure best practice in sampling and analysis.

HQ, NQ, and BQ size drill core is sawn in half with a diamond saw. Samples are selected for analysis in standard

intervals according to geological characteristics such as lithology and hydrothermal alteration. All diamond drill

hole collars are accurately surve yed using a Total Station instrument and down -hole deviations are surveyed

using a non-magnetic Reflex Gyrosmart 642.

Mean grades are calculated using a variable lower grade cut-off (generally 0.5g/t Au). No upper gold grade cut

has been applied to the da ta. However, the requirement for assay top cutting will be assessed during future

resource work.

Half of the sawed sample is forwarded to the analytical laboratory for analysis while the remaining half of the

core is stored in a secure location. The drill core samples from growth exploration drill holes are transported in

securely sealed bags and sent for physical preparation to the independent ALS Brazil (subsidiary of ALS Global)

laboratory located in Vespasiano, Minas Gerais, Brazil. The analysis is con ducted at ALS Global’s respective

facilities (fire assay are conducted by ALS Global in Lima, Peru, and multi -elementary analysis are conducted

by ALS Global in Vancouver, Canada). ALS has accreditation in a global management system that meets all

requirements of international standards ISO/IEC 17025:2005 and ISO 9001:2015. All major ALS geochemistry

analytical laboratories are accredited to ISO/IEC 17025:2005 for specific analytical procedures.

The infill drilling results presented on this news release ar e from drill holes completed by both Major Drillin g on

contract and Jaguar Mining Inc´s own drilling machines . The infill samples are transported for physical

preparation and analysis in securely sealed bags to the Jaguar in-house laboratory located at the Roça Grande

Mine, Caeté, Minas Gerais.

For a complete description of Jaguar’s sample preparation, analytical methods and QA/QC procedures, please

refer to the “Technical Report on the Roça Grande and Pilar Operations, Minas Gerais State, Brazil ”, a copy of

which is available on the Company’s SEDAR profile at www.sedar.com.

The Iron Quadrangle

The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in

1699–1701 of gold contaminated with iron and platinum -group metals in the southeastern corner of the Ir on

Quadrangle gave rise to the name of the town Ouro Preto (Black Gold). The Iron Quadrangle contains world -

class multi-million-ounce gold deposits such as Morro Velho, Cuiabá, and São Bento. Jaguar holds t he second

largest gold land position of a gold producer in the Iron Quadrangle with just over 25,000 hectares.

About Jaguar Mining Inc.

Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in

Brazil with three gold mining complexes and a large land package with significant upside exploration potential

from mineral claims covering an are a of approximately 64,000 hectares. The Company's principal operating

assets are located in the Iron Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the

Turmalina Gold Mine Complex and Caeté Mining Complex (Pilar and Roça Gr ande Mines, and Caeté Plant).

The Company also owns the Paciência Gold Mine Complex, which has been on care and mainten ance since

2012. The Roça Grande Mine has been on temporary care and maintenance since April 2018. Additional

information is available on the Company's website at www.jaguarmining.com.

7

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

For further information, please contact:

Vern Baker

Chief Executive Officer

Jaguar Mining Inc.

[email protected]

+55 (31) 3232-7101

Hashim Ahmed

Chief Financial Officer

Jaguar Mining Inc.

[email protected]

416-847-1854

Forward-Looking Statements

Certain statements in this news release constitute "forward-looking information" within the meaning of applicable Canadian

securities legislation. Forward -looking statements and inform ation are provided for the purpose of providing information

about management's expectations and plans relating to the future. All of the forward-looking information set forth in this news

release is qualified by the cautionary statements below and those ma de in our other filings with the securities regulators in

Canada. Forward-looking information contained in forward-looking statements can be identified by the use of words such as

"are expected", "is forecast", "is targeted,” "approximately," "plans," "anticipates," "projects," "continue," "estimate," "believe,"

or variations of such words and phrases or statements that certain actions, events or results "may," "could," "would," "might,"

or "will" be taken, occur or be achieved. All statements, other than statements of historical fact, may be considered to be or

include forward-looking information. These forward-looking statements are made as of the date of this news release and the

dates of technical reports, as applicable. This news release contains forwar d-looking information regarding potential and,

among other things, expected future mineral resources, potential mineral production opportunities, geological and mineral

exploration statistics, ore grades, current and expected future assay results, and definition/delineation/exploration drilling at

the Pilar Gold Mine and the Turmalina Gold Mine in Brazil, as well as forward -looking i nformation regarding costs of

production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration,

development and mining activities, capital requirements, project studies, mine life extensions, and continuous improvement

initiatives. The Company has made numerous assumptions with respect to forward -looking information contai ned herein,

including, among other things, assumptions about the estimated timeline and for the development of the drill program at the

Pilar Gold Mine (and its expanded exploration footprint) and the Turmalina Gold Mine; its mineral properties; the supply and

demand for, and the level and volatility of the price of, gold; the accuracy of reserve and resource estimates and the

assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition;

ongoing relations with employees and impacted communities; and political and legal developments in any jurisdiction in

which the Company oper ates being consistent with its current expectations including, without limitation, the impact of any

potential power rationing, tailings facility regulation, exploration and mine operating licenses and permits being obtained and

renewed and/or there being adverse amendments to mining or other laws in Brazil and any changes to general business

and economic conditions. Forward -looking information involves a number of known and unknown risks and uncertainties,

including among others: the risk of Jaguar not mee ting its plans regarding its operations and financial performance;

uncertainties with respect to the price of gold, labor disr uptions, mechanical failures, increase in costs, environmental

compliance and change in environmental legislation and regulation, weather delays and increased costs or production delays

due to natural disasters, power disruptions, procurement and delivery of parts and supplies to the operations; uncertainties

inherent to capital markets in general (including the sometimes volatile valuation of securities and an uncertain ability to raise

new capital) and other risks inherent to the gold exploration, develop ment and production industry, which, if incorrect, may

cause actual results to differ materially from those anticipated by the Com pany and described herein. In addition, there are

risks and hazards associated with the business of gold exploration, developm ent, mining and production, including without

limitation environmental hazards, tailings dam failures, industrial accidents and wo rkplace safety problems, unusual or

unexpected geological formations, pressures, cave-ins, flooding, chemical spills, and gold bullion thefts and losses (and the

risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Although we have attempted to identify

important factors that could cause actual actions, events or results to differ materially from those described in forward-looking

statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended.

There can be no assurance that forward -looking statements will prove to be accurate, as ac tual results and future events

could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on

forward-looking information.

8

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T: 416-847-1854

Appendix 1

Infill Drilling Results Orebody A and Orebody C.

Summary of Significant Intersections, Drilling Program

Jaguar Mining Inc. – Turmalina Mine

Hole ID From

(m)

To

(m)

DownHole

Interval (m)

Estimated True

Width (m)

Gold Grade

(g/t Au)

GT

(ETW)

Date

(mm/dd/yyyy)

FTS1626

100.81 102.70 1.89 1.60 3.67 5.87

4/12/2019 112.78 115.33 2.55 1.77 3.20 5.66

147.72 153.17 5.45 3.98 2.01 8.00

FTS1639

113.43 114.56 1.13 1.11 1.02 1.13

8/22/2019

138.43 146.72 8.29 8.00 2.95 23.60

FTS1703 69.02 79.25 10.23 8.85 2.18 19.29 4/8/2019

FTS1704 148.43 151.47 3.04 2.25 7.62 17.15 4/16/2019

FTS1705 60.06 61.03 0.97 0.82 3.04 2.49 4/22/2019

FTS1722 No impact 4/1/2019

FTS1723 66.19 68.02 1.83 1.75 3.95 6.91 4/10/2019

FTS1724

60.03 61.88 1.85 1.53 1.36 2.08

5/28/2019

69.37 73.35 3.98 3.29 1.92 6.32

FTS1727

90.04 94.97 4.93 3.77 1.54 5.81

103.68 118.48 14.80 12.12 2.45 29.69

131.73 146.11 14.38 11.77 5.56 65.44

Including 139.16 143.30 4.14 3.38 12.69 42.91

FTS1728 142.68 151.58 8.90 8.36 15.22 127.24

Including 143.84 149.74 5.90 5.55 20.20 112.13

FTS1729 83.03 89.99 6.96 5.70 4.39 25.02 5/14/2019

FTS1731

94.85 106.08 11.23 9.52 3.35 31.89

5/10/2019 152.25 154.94 2.69 2.55 5.41 13.80

Including 94.85 97.57 2.72 2.30 7.24 16.65

FTS1733

52.86 53.95 1.09 0.83 3.05 2.53

6/5/2019

59.55 63.06 3.51 2.68 1.99 5.33

FTS1734 156.98 157.79 0.81 0.75 2.00 1.50 6/10/2019

FTS1735

130.80 132.01 1.21 1.10 4.83 5.31

6/26/2019

144.05 145.97 1.92 1.85 6.96 12.88

FTS1736 No impact 5/14/2019

FTS1737 104.50 109.75 5.25 2.95 3.13 9.23 6/24/2019

FTS1738

145.37 146.37 1.00 0.80 5.50 4.40

7/8/2019

169.62 173.41 3.79 2.72 4.19 11.40

FTS1740 125.50 136.15 10.65 7.66 8.02 61.43 6/24/2019