Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

JAG.TO ·

Jaguar Announces Acquisition of Strategic Land Position Extending Roça Grande Mine Concession by 1,000 Hectares; Provides Growth Exploration Update

Mergers & Acquisitions Exploration Programs

NEWS RELEASE

June 21, 2017 2017 – 13

FOR IMMEDIATE RELEASE TSX:JAG

Jaguar Announces Acquisition of Strategic Land Position

Extending Roça Grande Mine Concession by 1,000 Hectares;

Provides Growth Exploration Update

Toronto, Canada, June 21, 2017 - Jaguar Mining Inc. ("Jaguar" or the "Company") (TSX:JAG) is pleased to announce

that it has acquired a strategic Mineral Exploration License (“License”) located 4.5 km west of the Caeté mill operations

(“Caeté Mill”) where the Company currently processes ore from its Pilar Gold Mine (“Pilar” or “Pilar Mine”) and its Roça

Grande Gold Mine (“RG” or “RG Mine”). The Company is also pleased to provide a Growth Exploration Update on its

operations including the Pilar Mine and the Turmalina Gold Mine (“Turmalina” or “Turmalina Mine”), located in Minas Gerais,

Brazil.

New Strategic Land Position at Roça Grande Mine Concession

• The newly acquired License, located 4.5 km west of the Caeté Mill, increases the total registered RG Mine concession

by 1,000 hectares (“ha”). The Company believes that the expanded land position, adds significant value to the overall

RG concession area as it is strategically located just west of the RG Mine, and contains 7.5 km of contiguous Banded

Iron Formation (“BIF”) as well as a large number of historic Portuguese workings from the late 17th and 18th centuries

(refer to Figure #1).

• The License area was originally staked in 1981, and became publically available on May 27, 2016 when it was declared

a Mineral Exploration License in the Brazilian Official Gazette under the ordinance number 830.807/2017. It was

awarded to Jaguar on March 23, 2017 by the Departamento Nacional de Produção Mineral (“DNPM”).

• Within the License area, there are strong magnetic anomalies associated with more than 7.5 km of mapped, highly

prospective, contiguous BIF extensions, including the possibility of a potential gold-bearing BIF hinge zone in the west-

south-west portion of the License area (refer to Figure #2).

• The License area also contains a number of strategic exploration targets including the highly prospective Morro da Mina

target, which forms part of the BIF continuity currently hosting the RG1 mineralization along with additional RG

mineralization which make up the RG complex. Geological and structural mapping with soil sampling is planned for the

Morro da Mina target in the second half of 2017, with the objective of confirming historic gold occurrences in and around

the target (refer to Figure #3)

Mr. Rodney Lamond, President and CEO of Jaguar Mining stated; “The awarding of this new strategic Mineral Exploration

License to Jaguar is another outstanding achievement by our vigilant operations team, who were able to apply for the License

area when it became publically available in mid-2016. It is a very difficult task to maintain an attentive watch for available

concessions in a highly sought after mining district. The new License further consolidates and considerably expands the

total RG concession adjacent to the RG mine and mill operations. The new License area is also highly prospective, containing

a number of old Portuguese workings, and over 7.5 kms of mapped, contiguous BIFs including a potential gold-bearing BIF

hinge in the west-south-west quadrant of the License area. These BIFs form part of the continuity currently hosting the RG

mineralization which make up the entire RG complex. During the second half of the year, Jaguar plans to carry out an

exploration campaign on one of the historic targets, Morro da Mina, to confirm previously identified gold occurrences in and

around the target.”

• Other known historic exploration targets within the new License area include Ajunta Vaca, Vai e Vem, Santo Antonio

and Cachoeira Falcão (refer to Figures #1, #2, and #3). These targets were identified and explored from the late 17th

century to the end of the 19th century. In the 1980’s, Unamgen Mineração e Metalurgia S.A. (“Unamgen”), a Brazilian

mining and exploration company, and a subsidiary of Eldorado Gold (São Bento), conducted an exploration campaign

in and around the License area. The campaign included 2,796 soil samples contained in 10 x 100 metres (“m”) and 20

x 200 m geochemical soil sampling grids, 51 trenches with a total of 4,700 linear m, 17 reverse circulation drill holes

and 2 diamond drill holes for a total of 744 m, which generated a historic resource of 48,000 ounces of gold. Unamgen

eventually departed the area in late 1990, allowing the License to become publically available in May 2016.

2

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T- 416 847 1854

Growth Exploration Update

Pilar Mine

• Deep exploration: The deep horizon exploration drive in the hanging wall of the mine at Level 7-4 is now complete, with

three contract diamond drills currently in operation. The drilling program is designed to extend resources targeting Levels

11-16 up to 350 m below current development and 250 vertical m below the current Inferred Resources. The program

will test the down-plunge extension and continuity of Orebodies BFII, BF, and BA. Drilling results for this program will

be announced in the second half of 2017. It is expected that the drilling results will add to the Mineral Reserves and

Mineral Resources of Pilar, which are expected to be updated in early Q1 2018. (See Figure #4).

• Pacheca Target: To date, we have completed 2,032 m (nine holes) of surface diamond drilling at Pacheca (refer to

Table #1). The exploration program also included a 221 ha aerial magnetic survey, which confirmed the identification of

several additional magnetic anomalies, along with 428 soil samples and 90 chip samples. Results from the diamond

drill program to date have intersected minor intervals of gold; however, mineralized gold-bearing trends have not yet

been identified due to the degree of complex BIF deformation and folding along the Pacheca target. Data collected to

date is currently being modeled, mapped, and reviewed for further interpretation of the complex nature of the target.

Further exploration at the Pacheca Target will be results driven.

• Cubas Target: To date, we have completed 1,951 m (three holes) of surface diamond drilling at Cubas. The program

also included a 516 ha topographic survey, an aerial magnetic survey to be completed at the end of June, and the

collection of 611 soil samples and eight chip samples. The deep diamond drilling campaign was successful in targeting

the Cubas IP anomaly, which it intersected at 678 m from surface. Drilling intersected approximately 33 m of massive

sulphides predominantly composed of pyrrhotite (> 80%), pyrite (<10%), and chalcopyrite. Arsenopyrite and/or antimony

minerals typically associated with gold bearing deposits were not associated with the massive sulfides. However, the

ability to intersect and identify massive sulfides at this depth is very important, as these types of massive sulphides can

be a predecessor for, or related to, potential deep gold-bearing deposits. The geological data from the drilling program

is currently being reviewed and interpreted for a future deep drill step-out program in and around the Cubas target.

• Exploration work is currently being conducted around the old Pilar ore body located near the current ventilation raise. A

topographic survey along with soil samples and channel trench samples are being collected. Results of this program

will be assayed, compiled, and announced in due course.

Turmalina Mine

• Deep exploration: The deep horizon exploration platform on Level 10-1 is now complete. Diamond drilling from the

platform is intended to reach Levels 12-16, up to 420 vertical m below the current development and 300 m below the

current Inferred Resources. Up to four contracted underground exploration drills will be moved from Pilar to Turmalina

to complete deep drilling once the exploration program is completed at Pilar. (See Figure #5).

• Currently at Turmalina, there are three diamond drills in operation, focused on infill drilling of the resources within

previously announced Mineral Reserves and Minerals Resources (see news release March 30, 2017). This program is

targeting the downward extension of the high-grade Orebody A, 90 m below the current mining areas. An additional drill

campaign has begun to confirm the downward extension of the higher-grade shoots contained within Orebody C, which

should improve the interpretation of mineralization 500 m below the current Inferred Resources. The campaign will

commence in July and results will be announced in the second half of 2017.

Qualified Person

Scientific and technical information contained in this press release has been reviewed and approved by Geraldo Guimarães

Vieira dos Santos, BSc Geo., MAIG-3946 (CP), Geology Manager, who is an employee of Jaguar Mining Inc., and is a

“qualified person” as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”).

The Iron Quadrangle

The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in 1699-1701

of black gold contaminated with iron and platinum-group metals in the southeastern corner of the Iron Quadrangle gave rise

to the name of the town Ouro Preto (Black Gold). The Iron Quadrangle contains world-class multi-million ounce gold deposits

such as Morro Velho, Cuiabá, and São Bento. Jaguar holds the second largest gold land position in the Iron Quadrangle with

just over 25,000 hectares.

3

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T- 416 847 1854

About Jaguar Mining Inc.

Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in Brazil with

three gold mining complexes, and a large land package with significant upside exploration potential from mineral claims

covering an area of approximately 192,000 hectares. The Company’s principal operating assets are located in th e Iron

Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the Turmalina Gold Mine Complex and the

Caeté Gold Mine Complex, which combined produce more than 95,000 ounces of gold annually. The Company also owns

the Paciência Gold Mine Complex, which has been on care and maintenance since 2012. Additional information is available

on the Company's website at www.jaguarmining.com.

For further information please contact:

Rodney Lamond

President & Chief Executive Officer

[email protected]

416-847-1854

Joanne Jobin

Vice President, Investor Relations

[email protected]

416-847-1854

FORWARD-LOOKING STATEMENTS

Certain statements in this news release constitute "forward -looking information" within the meaning of applicable Canadian securities

legislation. Forward-looking statements and information are provided for the pur pose of providing information about management's

expectations and plans relating to the future. All of the forward-looking information set forth in this news release is qualified by the cautionary

statements below and those made in our other filings with the securities regulators in Canada. Forward-looking information contained in

forward-looking statements can be identified by the use of words such as "are expected", "is forecast", "is targeted", "approximately", "plans",

"anticipates", "projects", "continue", "estimate", "believe" or variations of such words and phrases or statements that certain actions, events

or results "may", "could", "would", "might", or "will" be taken, occur or be achieved. All statements, other than statements of historical fact,

may be considered to be or include forward-looking information. These forward-looking statements are made as of the date of this news

release and the dates of technical reports, as applicable. This news release contains forward-looking information regarding potential and,

among other things, expected production, statistics, ore grades, tonnes milled, recovery rates, cash operating costs, and

definition/delineation drilling at the Turmalina Gold Mine, the timing and amount of estimated future production, costs of production, capital

expenditures, costs and timing of the development of projects and new deposits, success of exploration, development and mining activities,

currency fluctuations, capital requirements, project studies, mine life extensions, and continuous improvement initiatives. The Company has

made numerous assumptions with respect to forward-looking information contained herein, including, among other things, assumptions

about the estimated timeline and for the development of the drill program at the Turmalina Gold Mine and its mineral properties; the supply

and demand for, and the level and volatility of the price of, gold; the accuracy of reserve and resource estimates and the as sumptions on

which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees

and impacted communities; and political and legal developments in any jurisdiction in which the Company operates being consistent with

its current expectations including, without limitation, the impact of any potential power rationing, tailings facility regulation, exploration and

mine operating licenses and permits being obtained and renewed and/or there being adverse amendments to mining or other laws in Brazil

and any changes to general business and economic conditions. Forward-looking information involves a number of known and unknown

risks and uncertainties, including among others: the risk of Jaguar not meeting the forecast plans regarding its opera tions and financial

performance; uncertainties with respect to the price of gold, labor disruptions, mechanical failures, increase s in costs, environmental

compliance and changes in environmental legislation and regulation, weather delays and increased costs or production delays due to natural

disasters, power disruptions, procurement and delivery of parts and supplies to the operations; uncertainties inherent to capital markets in

general (including the sometimes volatile valuation of securities and an uncertain ability to raise new capital) and other risks inherent to the

gold exploration, development and production industry, which, if incorrect, may cause actual results to differ materially from those anticipated

by the Company and described herein. In addition, there are ris ks and hazards associated with the business of gold exploration,

development, mining and production, including without limitation environmental hazards, tailings dam failures, industrial accidents and

workplace safety problems, unusual or unexpected geological formations, pressures, cave-ins, flooding, chemical spills, and gold bullion

thefts and losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Although we have attempted

to identify important factors that could cause actual actions, events or results to differ materially from those described in forward -looking

statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Important

factors that could cause actual actions, events or results to differ materially from expectations (or those described in forward -looking

statements) are discussed in greater detail in Jaguar’s annual information form for the year ended December 31, 2016, under the heading

“Risk Factors”. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events

could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking

information. The Company expressly disclaims any intention or obligation to update or revise any forward-looking statements, whether as a

result of new information, future events or otherwise.

4

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T- 416 847 1854

Figure #1

The newly acquired Mineral Exploration License increases the total registered RG Mine concession area by 1,000 ha.

Figure #2

Strong magnetic anomalies associated with more than 7.5 km of mapped, highly prospective, contiguous BIF extensions,

including the possibility of a potential gold-bearing BIF hinge zone in the west-south-west portion of the License area.

Source: Geophysical Modeling and Integration data of HTEM Conductors in Greenstone Belt Rio das Velhas, Quadrilátero Ferrífero, MG –

Marco A. Couto Jr., Raianny C. R. Ferreira, Orivaldo F. Baltazar, Marcelo S. Marinho, Joanna C. S. Araújo - CPRM - Brazilian Geological Survey,

presented in SimexMin 2016

5

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T- 416 847 1854

Figure #3

Geological and structural mapping with soil sampling will be conducted during the second half of the year, Jaguar plans to

carry out an exploration campaign on one of the historic targets, Morro da Mina, to confirm previously identified gold

occurrences in and around the target.

Source: The Iron Quadrangle Geology Project, CODEMIG - Brazilian Development Company, 2005

Table #1

Pilar Gold Mine

Pacheca Target Drill Results

Hole ID Date From

(m)

To

(m)

Downhole

Interval

(m)

Estimated

True Width

(m)

Gold Grade

(g/t Au)

FPCH001 18/10/2016 45.35 55.05 9.70 8.00 0.34

including 48.35 49.35 1.00 0.83 1.33

18/10/2016 59.45 61.70 2.25 1.85 0.30

18/10/2016 63.50 65.50 2.00 1.65 2.81

including 64.50 65.50 1.00 0.83 5.40

18/10/2016 73.50 78.50 5.00 4.01 0.50

including 75.50 76.50 1.00 0.84 1.50

18/10/2016 86.05 89.05 3.00 2.50 0.15

18/10/2016 240.35 242.1 1.75 1.46 0.20

FPCH002 16/10/2016 66.30 67.80 1.50 1.20 1.20

including 66.30 66.80 0.50 0.40 2.70

16/10/2016 72.25 73.00 0.75 0.60 0.96

16/10/2016 96.15 102.30 6.15 4.95 0.47

16/10/2016 108.60 110.60 3.30 2.70 0.49

FPCH003 03/11/2016 85.05 85.50 0.45 0.45 0.50

FPCH004 16/11/2016 224.10 228.10 4.00 3.95 0.28

16/11/2016 240.60 246.60 6.00 5.90 0.34

6

JAGUAR MINING INC.

First Canadian Place, 100 King Street West, 56th Floor, Toronto, Ontario, Canada M5X 1C9 T- 416 847 1854

Figure #4

Shows the now complete deep horizon exploration drive in the hanging wall of the mine at Level 7-4. The program is targeting

Levels 11 to 16, up to 350 vertical m below current development and 250 m below the current Inferred Resources and will

test the down-plunge extension and continuity of ore bodies BFII, BF, and BA.

Figure #5

Shows the deep horizon exploration platform on Level 10-1. Drilling from the platform is intended to reach Levels 12-16 up

to 420 vertical m below the current development and 300 m below the current Inferred Resources.

MeasuredResources

IndicatedResources

InferredResources

OrebodyBFII

OrebodyBF OrebodyBA

Level-07

Level-09

Level-10

Level-11

Level-12

Level-13

Level-14

Level-16

Level-08

DeepHorizonDrillingPlatform

PILAR GOLD MINE –DeepDrlling

Proposeddrilling