Manson Completes Phase 1 Reconnaissance and Test Geophysics at DJ Jade Project

Exploration Programs

MANSON CREEK RESOURCES LTD.

SUITE 800, 808 - 4

TH

AVENUE S.W., CALGARY, ALBERTA, T2P 3E8

PH: 403.233.0464 FAX: 403.266.2606 WWW.MANSON.CA

NEWS RELEASE SEPTEMBER 11, 2017

News Release: 17-06 Trading Symbol: TSX Venture- MCK

For Further Information Contact: Jean-Pierre Jutras at 1.403.233.0464

Web: http://www.manson.ca

Manson Completes Phase 1 Reconnaissance and Test Geophysics at DJ Jade Project

Calgary, Alberta - Manson Creek Resources Ltd. (TSX.V: MCK) (“Manson”) is pleased to announce

preliminary results from its phase one reconnaissance program at its recently acquired DJ Jade project.

A two week program of initial mapping, prospecting and sampling was conducted between August 20 th and

September 3rd. Picket grids were established in the field over the first two target areas (Lode 1 and Lode

2) to situate and plot geological observations and sample site locations.

A total of approximately 87 pounds of samples were collected from site and are currently being cut for

further testing and evaluation.

The area known as Lode 1 was based on a previously identified, roughly 1 meter wide nephrite jade vein

exposed by hand trenching. Mapping determined that the showing was associated with the contact zone

between an intermediate to felsic intrusive body and both serpentinized bodies and calc-silicate

sedimentary units that form the country rock. A series of outcrops, subcrops as well as float material found

at surface during mapping suggest that the nephrite bearing zone extends over some 140 meters in length

(and remains open), with widths varying between roughly 50 centimeters to in excess of 1.5 meters where

exposed. The zone remains open for further expansion and will be investigated by hand trenching in the

next phase of work.

Samples collected from surface at the Lode 1 showings vary in appearance from opaque to semi

translucent, with colors varying between dark green to light greenish blue.

The area known as Lode 2 is a hand trenched nephrite jade body that is exposed semi-continuously over

11.2 meters in strike length with an average width of approximately 1 meter. The nephrite jade body is part

of a larger jade bearing fault/contact zone between calc-silicate units and serpentinites, which has been

investigated at surface and where jade has now been identified in outcrop and float over some 50 meters

of strike length. The zone remains open for further extension, and will be investigated by hand trenching in

the next phase of work.

Samples collected from surface at Lode 2 include semi to highly translucent, dark to light green and locally

light green with bluish tinges, as well as creamy white material.

As part of this first phase of work, test geophysical survey lines including ground magnetics, Electrical

Resistivity Imaging (ERI) and Induced polarization (IP) were run over both known Lode zones. The

purpose of the exercise was to determine if such geophysical testing and imagery could be further used to

determine the presence of unexposed lodes hidden under vegetation cover, as well as extend known ones

and determine if the techniques could also provide indication of depth and width potential to orient future

drill testing. The data collected is currently being processed.

Page 2

September 11, 2017

Samples are being cut and prepared for testing and evaluation. Although surface weathering and

alteration can be observed to have locally strongly affected the Jade’s translucency, color and texture,

some relatively unaltered material was collected from both main targets. Confirmation of the samples’

nature will rely on a combination of visual examination, microscope work, hardness tests, specific gravity

tests as well as X-Ray investigation of the sample’s chemical composition, as required. Photo galleries of

cut samples will be posted on our website once this phase of work is completed.

Mr. Jean-Pierre Jutras, P.Geol., President of the Company, is the Qualified Person for the DJ project as

defined by National Instrument 43-101 and has approved the technical disclosure contained in this news

release.

On Behalf of the Board of Directors,

“Jean-Pierre Jutras”

Jean-Pierre Jutras

President/Director

The TSX Venture Exchange has neither approved nor disapproved of the contents of this press release.

Except for the historical and present factual information contained herein, the matters set forth in this news release, including words

such as “expects”, “projects”, “plans”, “anticipates” and similar expressions, are forward-looking information that represents

management of Manson Creek’s internal projections, expectations or beliefs concerning, among other things, future operating results

and various components thereof or the economic performance of Manson Creek. The projections, estimates and beliefs contained in

such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause Manson Creek’s

actual performance and financial results in future periods to differ materially from any projections of future performance or results

expressed or implied by such forward-looking statements. These risks and uncertainties include, among other things, those described

in Manson Creek’s filings with the Canadian securities authorities. Accordingly, holders of Manson Creek shares and potential

investors are cautioned that events or circumstances could cause results to differ materially from those predicted. Manson Creek

disclaims any responsibility to update these forward-looking statements.