Ivanhoe Mines reports Mineral Resources for Makoko and Kiala discoveries in the Western Foreland

Corporate Updates

November 13, 2023

Ivanhoe Mines reports Mineral Resources for Makoko and

Kiala discoveries in the Western Foreland

■

Makoko contains Indicated Mineral Resource of 16 million

tonnes at 3.55% copper plus Inferred Mineral Resource of 154

million tonnes at 1.97% copper using a 1.5% copper cut-off

■

Kiala contains Indicated Mineral Resource of 5 million tonnes

at 3.56% copper using a 1.5% copper cut-off

■

Makoko ranks as the world’s third-largest and highest-grade

copper discovery since Kakula in 2016

■

Ivanhoe has now discovered 38.7 million tonnes of contained

copper in Measured & Indicated Resources and a further 9.4

million tonnes in Inferred Resources across the Western

Foreland shelf, including Kamoa and Kakula

■

Mining rights covering Makoko and Kiala discoveries awarded

for an initial period of 25 years

■

Western Foreland to benefit from improving DRC

infrastructure, including power and the Lobito Rail Corridor,

which passes through the licences

■

Western Foreland exploration update on new targets

expected before year-end

KOLWEZI, DEMOCRATIC REPUBLIC OF CONGO – Ivanhoe Mines (TSX: IVN;

OTCQX: IVPAF) Executive Co-Chair Robert Friedland and President Marna Cloete

are pleased to announce the independently verified, maiden Mineral Resource

estimates for the high-grade Makoko and Kiala deposits within Ivanhoe’s Western

Foreland Exploration Project.

2

Makoko and Kiala are two distinct discoveries adjacent to the Kamoa-Kakula

Copper Complex and continue Ivanhoe’s distinguished track record of making

greenfield discoveries in this uniquely endowed geological terrain. The two

deposits occur within the 2,407-square-kilometre Western Foreland Exploration

Project, which lies adjacent to the 400-square-kilometre Kamoa-Kakula Copper

Complex in the Democratic Republic of Congo (DRC). The Western Foreland

licences are 80% to 100%-owned by Ivanhoe Mines.

Ivanhoe Founder and Executive Co-Chairman Robert Friedland commented:

“These outstanding results are the culmination of over twenty years of effort,

starting with grassroots, frontier exploration to define a previously unknown

mineral horizon with the potential to host huge copper deposits with spectacular

grades.

“The theory was proven to be correct, as our team of visionary geoscientists

discovered Kamoa in 2008, followed by the monumental Kakula discovery in 2016.

In little over five years, Kakula went from drill core samples to one of the five

largest copper mines in the world, with by far the highest grade, thanks to the hard

work of our outstanding project and operations teams.

“Ivanhoe Mines’ geologists are rarely quiet for long, and these Mineral Resource

estimates for Makoko and Kiala are just the beginning of demonstrating the

immense copper mineral potential of the entire Western Foreland basin.

Remarkably, this team is now responsible for the largest copper discovery of the

last ten years, the ultra-high-grade giant Kakula discovery, as well as the giant

Kamoa discovery and now the fourth largest discovery in Makoko.

“We will be looking into whether Makoko’s near surface mineralized zone is

amenable to heap leaching, which if possible, would be both a very low capital

intensive, as well as a very low carbon intensive way of producing copper

cathode.

“There is much more to come as this story unfolds … we continue to perfect our

knowledge of the geological controls of this globally significant copper district …

and we are adding to our carefully chosen land position in the region.”

Ivanhoe President Marna Cloete added: “Makoko and Kiala will benefit from

significant infrastructure advantages compared to when we developed Kakula,

which was built in record time. We are working tirelessly to improve hydropower

generation capacity in DRC through the refurbishment of Turbine #5 at the Inga II

facility, which is expected to be supplying green hydroelectric power to the grid by

the fourth quarter of 2024, as well as ongoing improvements to the grid

transmission network.

“The redevelopment of the Lobito Rail Corridor, built with Chinese assistance and

now supported by the United States, European Union and G7 nations, passes

3

within a few kilometres of both the Makoko and Kiala deposits. The corridor will

dramatically reduce turnaround times, both for inbound construction materials

and equipment, as well as for outbound copper products, and will reduce

development and operating costs, as well as carbon emissions.

“We look forward to advancing the development of Makoko and Kiala in

partnership with our Congolese shareholders, and also to further exploration

success from our major drill campaign this year across the Western Foreland land

package.”

Figure 1: Top copper discoveries over the past 10 years, plus Kamoa (2008).

Makoko and Kiala rank as the world’s third-largest copper discovery since

Kamoa-Kakula, and the highest-grade.

*The Kamoa discovery, within the larger Kamoa-Kakula Copper Complex, was made in 2008. It has been

inserted for reference.

Source: Company filings, S&P Global Market Intelligence. Based on public disclosure as of August 1,

2023. The Makoko and Kiala mineral resources (1.0% cut-off grade) have not been reviewed by S&P

Global.. The mineral resource at La Huifa (Codelco) is stated in public disclosures as a geological

resource, which is assumed to be an Inferred resource in this chart. Notes: Chart ranks the largest copper

discoveries made globally in the last ten years (from January 1, 2013) based on contained copper in

resources. Measured and indicated resources are inclusive of reserves and are on a 100% basis.

--

1.0

2.0

3.0

4.0

--

5.0

10.0

15.0

20.0

25.0

30.0

Copper Grade in Resources (%)

Contained Copper in Resources (Mt)

Contained, M&I

Contained, Inferred

Grade, M&I (%)

Grade, Inferred (%)

4

Figure 2. Map highlighting the Makoko and Kiala discoveries on the Western

Foreland licences.

Makoko emerges as the world’s fourth-largest copper discovery over

the past decade

Makoko, first discovered in 2018, is situated approximately 20 kilometres west of

the Kakula deposit, along strike of the regional structure controlling high-grade

copper mineralization at Kakula. Drilling at Makoko has defined a flat-lying,

stratiform copper deposit that is geologically similar to the Kamoa and Kakula

deposits. The primary mineralized zone at Makoko relates to an east-southeast

trending growth fault structure that maintains the sulfur-rich host unit in close

proximity to the underlying aquifer. These two key factors for mineralization are

combined at Makoko over a width of 700 metres and strike extent of 3,800 metres.

A second sub-parallel zone of shallower mineralization occurs up-dip across a

strike extent of approximately 11 kilometres, where a stratigraphically higher,

sulfur-rich host is in contact with the underlying aquifer. Both zones of

mineralization remain open along strike.

5

Ivanhoe Mines’ exploration team with core from the 2023 Western Foreland

drill campaign, which has generated 28,550 metres of diamond drill core

through Q3 2023.

During the third quarter, contractor diamond drill rigs across Western

Foreland increased to seven, in addition to the Ivanhoe Landcruiser

diamond drill rig.

6

The highest-grade section of the Makoko deposit occurs between 300 and 600

metres in depth and coincides with the Indicated Resource area shown in Figure 5.

Highlights of the maiden Makoko Mineral Resource estimate, prepared by Ivanhoe

Mines under the direction of the MSA Group (MSA), of Johannesburg, South

Africa, in accordance with the 2014 CIM Definition Standards for Mineral

Resources and Mineral Reserves:

■ Indicated Resources total 16 million tonnes at a grade of 3.52% copper,

containing 1.3 billion pounds of copper at a 1% copper cut-off. At a higher

1.5% copper cut-off, Indicated Resources total 16 million tonnes at a 3.55%

copper, containing 1.3 billion pounds of copper.

■ Inferred Resources total 243 million tonnes at a grade of 1.71% copper,

containing 9.2 billion pounds of copper at a 1% copper cut-off. At a higher

1.5% copper cut-off, Inferred Resources total 154 million tonnes at a 1.97%

copper grade, containing 6.7 billion pounds of copper.

■ The average vertical thickness of the selective mineralized zone at a 1.0%

cut-off is 5.2 metres in the Indicated Resource area and 6.0 metres in the

Inferred Resource area. At a higher 1.5% cut-off, the average vertical

thickness of the selective mineralized zone is 5.2 metres in the Indicated

Resource area and 6.6 metres in the Inferred Resource area.

The Makoko Mineral Resource has been defined by drilling covering a total area of

15.9 square kilometres within the much larger Makoko exploration area. The total

area extent of Indicated Resource is 1.1 square kilometres at a 1.0% cut-off and

14.8 square kilometres for the Inferred Resource at a 1.0% cut-off. The average dip

of the mineralized zone in the Mineral Resource area is 14 degrees.

The Mineral Resource estimate is based on the results from approximately 50,000

metres of drilling in 148 holes. An additional 20 holes totaling more than 2,800

metres have been completed since the closure of the database for resource

estimation purposes.

Following the closure of the database for resource estimation, further drilling was

completed to test shallow mineralization and to join the two Inferred zones. This

drilling, and results available thus far, are shown in Figure 3 and Figure 5. There is

currently one active rig drilling the western extension of Makoko, while other

exploration has shifted to test other targets in the broader Western Foreland

Exploration Project during the remainder of the dry season, which typically ends

in mid-to-late November.

The Makoko Mineral Resource estimate was prepared by Ivanhoe Mines under the

direction of Jeremy Witley of the MSA Group. Mr. Witley is the Qualified Person for

the estimate and is considered independent of Ivanhoe for purpose of NI 43-101.

The Makoko Mineral Resource estimate has an effective date of September 4, 2023.

7

The Makoko Mineral Resources, along with sensitivities at various cut-offs, are

shown in Tables 1 and 2.

Table 1. Makoko Discovery Indicated and Inferred Mineral Resources at a

1.0% cut-off grade.

Category Tonnage

(millions)

Area

(km2)

Copper

Grade

(%)

Vertical

Thickness

(m)

Contained

Copper

(ktonnes)

Contained

Copper

(billion lbs)

Indicated 16 1.1 3.52 5.2 577 1.3

Inferred 243 14.8 1.71 6.0 4,170 9.2

Notes:

1. Ivanhoe’s Senior Exploration Geologist, Tim Dunnett, a Member of the Geology Society of South Africa and

Professional Natural Scientist (Pr. Sci. Nat) with the South African Council for Natural Scientific Professions

(SACNASP), estimated the Mineral Resources that were reviewed by Jeremy Witley, Pr.Sci.Nat SACNASP,

FGSSA, who is the Qualified Person for the Mineral Resource estimate. The effective date of the estimate is 4

September 2023, and the cut-off date for drill data is 28 February 2023. Mineral Resources are reported using

the CIM 2014 Definition Standards for Mineral Resources and Mineral Reserves. Mineral Resources are reported

on a 100% basis. Ivanhoe holds an indirect 80% interest in the Makoko SA mining licences and 100% interest in

the Lufupa exploration licences (see Table 6).

2. Mineral Resources are reported for Makoko using a total copper (TCu) cut-off grade of 1% TCu and a minimum

vertical thickness of 3m. There are reasonable prospects for eventual economic extraction under the following

assumptions: copper price $4.00/lb; employment of underground mechanized drift-and-fill mining methods;

copper concentrates will be sold to the Kakula smelter or toll treated; average metallurgical recovery is 87.5%;

mining costs are assumed to be $38/t; concentrator, tailings treatment, and general and administrative costs are

assumed to be $15/t; smelter, refining and transport costs are assumed to be $13.5/t of ore at the cut-off grade;

royalty of 3.5%, export tax of 1% and concentrate tax of $100/t NSR concentrate.

3. Reported Mineral Resources contain no allowances for hanging wall or footwall contact boundary loss and

dilution. No mining recovery has been applied.

4. Approximate drill hole spacings are 400 m to 600 m for Inferred Mineral Resources and 200 m for Indicated

Mineral Resources.

5. Rounding as required by reporting guidelines may result in apparent summation differences between tonnes,

grade and contained metal content.

Table 2. Makoko Discovery Indicated and Inferred Mineral Resources,

sensitivity cases.

Category Cut-off

Grade

(% Cu)

Tonnage

(millions)

Area

(km2)

Copper

Grade

(%)

Vertical

Thickness

(m)

Contained

Copper

(ktonnes)

Contained

Copper

(billion

lbs)

Indicated 3.0 11 0.7 4.04 5.5 460 1.0

2.5 13 0.9 3.85 5.3 515 1.1

2.0 16 1.1 3.63 5.2 561 1.2

8

1.5 16 1.1 3.55 5.2 574 1.3

1.0 16 1.1 3.52 5.2 577 1.3

Inferred 3.0 4 0.4 4.63 3.9 192 0.4

2.5 15 0.8 3.17 6.6 469 1.0

2.0 50 2.7 2.50 6.8 1,260 2.8

1.5 154 8.5 1.97 6.6 3,030 6.7

1.0 243 14.8 1.71 6.0 4,170 9.2

Freshly cut drill core from Makoko, during the ongoing Western Foreland

exploration program. The core shows chalocite and bornite copper

sulphide minerals. Diamond drilling is on track to exceed 40,000 metres for