Ivanhoe Mines issues 2023 fourth quarter and annual financial results, overview of construction and exploration activities

Mine Development & Operations Financials Exploration Programs

February 26, 2024

Ivanhoe Mines issues 2023 fourth quarter and annual financial

results, overview of construction and exploration activities

■

Ivanhoe Mines recognized profit of $303 million,

record normalized profit of $388 million and record adjusted

EBITDA of $604 million in 2023

■

Kamoa-Kakula recognized record annual revenue of $2.70

billion and record EBITDA of $1.68 billion in 2023

■

Kamoa-Kakula milled a record 8.54 million tonnes in 2023 at an

average grade of 5.23% copper

■

Kamoa-Kakula produced 393,551 tonnes of copper in

concentrate in 2023, achieving its production guidance range

despite intermittent grid instability

■

Kamoa-Kakula reported cash cost (C1) of $1.45 per lb. copper

in 2023, at the mid-point of guidance range

■

Phase 3 concentrator project 82% complete and ahead of

schedule for targeted ramp-up in June 2024; smelter complex

76% complete and on schedule for commissioning in Q4 2024

■

Kamoa-Kakula best-in-class carbon emissions per unit of

copper (Scope 1, 2 and 3) set to reduce by further 46%

following completion of 500,000 tonne-per-annum, on-site

smelter from Q4 2024

■

Refurbishment of Turbine #5 at Inga II dam 60% complete;

on-schedule and on-budget to produce 178 MW of green

hydroelectric power from Q4 2024

■

2

Ongoing drilling of the high-grade Kitoko Discovery in the

Western Forelands expands strike length to 2 km

■

Kipushi concentrator approximately 85% complete and

ahead of schedule for first production in Q2 2024

■

Optimized Platreef development plan to bring forward Phase

2 production at 4 Mtpa by equipping Shaft 3 for hoisting

■

PEA underway for new Phase 3 expansion to 10 Mtpa to rank

Platreef as one of the world’s largest and lowest cost PGM

and base metal producers

■

Ivanhoe Mines to host conference call for investors on

February 26

HOLLYWOOD, FLORIDA – Ivanhoe Mines’ (TSX: IVN; OTCQX: IVPAF) President

Marna Cloete and Chief Financial Officer David van Heerden are pleased to

present today, ahead of the 33rd BMO Global Metals, Mining & Critical Minerals

Conference in Hollywood, Florida, the company’s financial results for the year

ended December 31, 2023, and provide an operations and project development

update.

Ivanhoe Mines is a leading Canadian mining company developing and operating

its four principal mining and exploration projects in Southern Africa: expanding

operations at the world-class Kamoa-Kakula Copper Complex (Kamoa-Kakula) in

the Democratic Republic of Congo (DRC); building the tier-one Platreef palladium,

nickel, platinum, rhodium, copper and gold development in South Africa;

restarting the historic, ultra-high-grade Kipushi zinc-copper-lead-germanium

mine in the DRC; as well as exploring the expansive exploration licences of

Ivanhoe’s Western Forelands for copper discoveries adjacent to Kamoa-Kakula.

All figures are in U.S. dollars unless otherwise stated.

Watch a February 2024 video highlighting Ivanhoe Mines’

construction and exploration activities:

https://vimeo.com/916425207/bc28308e24?share=copy

3

Ivanhoe Founder and Executive Co-Chairman Robert Friedland commented ahead

of delivering his keynote speech at the 33rd BMO Global Metals, Mining & Critical

Minerals Conference in Hollywood, Florida, on February 26 at 12:30pm ET:

"Kamoa-Kakula continues to exceed expectations in terms of overall

performance, with Phase 1 and 2 mill throughput, copper recoveries and

underground mining operations registering strong results in 2023 – and in many

cases outperforming nameplate capacity. Delivering a project of this calibre and

scale on budget and ahead of schedule is a true anomaly in the mining industry,

which is often plagued by cost overruns and delays. This track record of success

will continue as we ramp-up the Phase 3 concentrator and underground mines

significantly ahead of schedule late in the second quarter of 2024 … which will

position Kamoa-Kakula as the world's third-largest copper mining complex just

eight years after Ivanhoe geologists reported the initial discovery hole at the

Kakula deposit.

"We are working proactively to address power intermittency and expect this to be

a short-term issue. Kamoa-Kakula will have full back-up generator redundancy for

the Phase 1 and Phase 2 operations in July, and we are well advanced in

discussions with our partners in the Democratic Republic of Congo, as well as

the government of Zambia, to address the situation permanently, as we bring

Phase 3 operations and the smelter complex online. Kamoa-Kakula will be fully

powered by green hydroelectricity over its generationally long life, and we are

excited to work with the Congolese government to develop all the infrastructure

that will support the world's newest major copper mining district, which extends

onto Ivanhoe's majority-owned Western Forelands licenses.

"We are looking forward to another transformative, industry-leading year at

Ivanhoe Mines. Seven drill rigs, and counting, are currently turning across the

Western Forelands, including expanding the high-grade Kitoko discovery.

Discovering and developing new world-scale copper resources on the Western

Forelands represents the highest possible return on capital that Ivanhoe Mines

can drive for our shareholders. Our geology team just drilled a wedge from hole

DD008 that re-confirms the extremely significant discovery of sedimentary

bonanza-grade copper over 11% grade directly on the Kibaran basement.

“We are also just a few months away from first production at Kipushi, bringing

this legendary mine back to life a century on from when it first produced as the

world’s highest-grade open pit copper mine. At Platreef, we will complete the

construction of the proof-of-concept, ‘baby’ Phase 1 mine this year; however, we

now have even greater focus on quickly unlocking the Phase 2 expansion of this

remarkable resource endowment. Our team is razor focused on delivering these

major milestones for our stakeholders and shareholders, as we take the next vital

steps on our journey to emerge as the world's most dynamic, new major

diversified mining company.”

4

FINANCIAL HIGHLIGHTS

• Ivanhoe Mines recorded a profit of $303 million in 2023, equivalent to $0.26 per

share, and normalized profit of $388 million, equivalent to $0.33 per share. The

normalized profit excludes an $85 million loss on fair value on the convertible

notes following the 20% appreciation in the share price from C$10.70 to

C$12.85 during the year.

• Ivanhoe’s profit for the year includes Ivanhoe Mines’ share of profit and

finance income from the Kamoa-Kakula joint venture of $482 million for 2023,

up from $405 million in 2022.

• Ivanhoe Mines’ Adjusted EBITDA was $604 million in 2023, up from $491

million in 2022, which includes an attributable share of EBITDA from Kamoa-

Kakula of $664 million.

• Kamoa-Kakula recognized record revenue of $2.70 billion, operating profit of

$1.45 billion and EBITDA of $1.68 billion for 2023.

• Cash cost (C1) per lb. of payable copper produced in 2023 totaled $1.45/lb.,

compared to $1.39/lb. in 2022. This achieved the mid-point of the guidance

range of $1.40/lb. to $1.50/lb.

• Kamoa-Kakula sold 375,779 tonnes of copper (net of payability) in 2023 at a

cost of sales per pound (lb.) of payable copper of $1.33/lb., compared with

$1.09/lb. in 2022. At year-end, approximately 9,100 tonnes of finished copper in

concentrate remained in the warehouse or was in the process of being tolled

at a nearby smelter, with a carrying value at cost, for accounting purposes, of

$22 million. These 9,100 tonnes of copper have a significantly higher net

realizable value based on current copper prices of approximately $8,580 per

tonne.

• Since entering Phase 1 commercial production on July 1, 2021, the Kamoa-

Kakula joint venture has generated $3.6 billion of EBITDA.

• Ivanhoe Mines completed a private placement offering of 47,917,050 Class A

common shares for aggregate gross proceeds of C$575 million (approximately

$430 million) in December 2023. Ivanhoe has a strong balance sheet with cash

and cash equivalents of $574 million on hand as at December 31, 2023.

• Ivanhoe Mines announces Kamoa-Kakula’s full-year cash cost (C1) guidance

for 2024 of $1.50/lb. to $1.70/lb of payable copper produced.

5

• Increased cash cost guidance in 2024, relative to 2023, reflects in part the

favorable early commissioning of the Phase 3 concentrator late in the second

quarter of 2024. The early commissioning of the Phase 3 concentrator will

require additional backup power generation for the remainder of 2024, until the

Inga II dam hydroelectric dam refurbishment is complete at year-end. Phase 3

and associated backup power generation will temporarily increase cash costs

by up to $0.20/lb. for the remainder of this year. Kamoa-Kakula is on a path to

full hydroelectric power generation and anticipates lower cash costs after

2024, following the commissioning of the direct-to-blister smelter.

• Ivanhoe Mines continued its excellent record of project execution in 2023, with

capital expenditure of $1.52 billion at Kamoa-Kakula on the Phase 2 and 3

expansions, $234 million at Platreef and $226 million at Kipushi. Projects

remain on or ahead of schedule and on budget, with any underspending in

2023 expected to be caught up in 2024.

• Ivanhoe Mines executed a $150 million senior debt facility for Platreef Phase 1

mine with its mandated lead arrangers, Société Générale and Nedbank.

• Kamoa-Kakula secured and drew down on unsecured financing facilities of

$400 million from DRC financial institutions at an attractive cost of capital to

augment cash generated from operations for its continued expansion and

working capital.

OPERATIONAL HIGHLIGHTS

• The Kamoa-Kakula Copper Complex produced 393,551 tonnes of copper in

concentrate in 2023, inside the 2023 production guidance range of 390,000 to

430,000 tonnes. Kamoa-Kakula’s 2023 production achievement represents a

year-over-year increase of 18%.

• Production at Kamoa-Kakula for the fourth quarter of 2023 was 92,215 tonnes

of copper in concentrate, compared to 103,947 tonnes in Q3 2023 and 92,761

tonnes in Q4 2022. Quarterly production was impacted by ongoing intermittent

grid instability, most acutely in November, with disruptions ongoing in 2024

year-to-date. The phased roll-out of over 200MW of on-site, backup generation

capacity, as well as concurrent grid infrastructure improvements are

advancing well.

• During 2023, Kamoa-Kakula Phase 1 and 2 concentrators milled a record of

approximately 8.54 million tonnes of ore at an average feed grade of 5.23%

copper, producing 824,382 dry metric tonnes of copper concentrate.

• Kamoa-Kakula’s Phase 3 concentrator is now 82% complete and ahead of

schedule for first production in late Q2 2024. The Phase 3 smelter complex is

now 76% complete and remains on schedule for commissioning in Q4 2024.

The refurbishment of Turbine #5 of the Inga II hydropower dam is 60%

complete and on schedule for commissioning in Q4 2024. Concentrate

6

production from the early commissioning of Phase 3 will be partially

stockpiled in anticipation of smelter commissioning.

• With the anticipated early commissioning of Phase 3, full-year production

guidance for Kamoa-Kakula was announced on January 8, 2024, at 440,000 to

490,000 tonnes of copper in concentrate.

• Ivanhoe announces “Project 95” at Kamoa-Kakula – an initiative targeting an

increase of copper recoveries to 95% by liberating copper from the tailings

stream at the concentrator, as well as re-treatment of tailings deposited to

date. Basic engineering for Project 95 is underway and is expected to be

complete in early Q2 2024.

• Kamoa-Kakula commenced trial exports of concentrate along the Lobito

Atlantic Railway Corridor in late 2023. More recently, Kamoa-Kakula has

signed a term sheet outlining the key terms for a Reserved Capacity

Agreement for the transportation of up to 240,000 tonnes of copper products

along the Lobito Corridor from 2025. As such, Kamoa-Kakula will be the first

industrial customer of the Lobito Corridor in the modern era.

• Industry peer data compiled by Skarn Associates ranks the Kamoa-Kakula

Copper Complex comfortably within the bottom decile of the greenhouse gas

(GHG) emissions intensities on a Scope 1, 2 and 3 (partial) basis. Following

the completion of the Phase 3 expansion and the smelter, the emissions

intensity of Kamoa-Kakula on a Scope 1, 2 and 3 basis is estimated to almost

halve to 1.31 tonnes of carbon dioxide equivalent per tonne (t CO2-e / t Cu) of

copper produced.

• In the Western Forelands, Ivanhoe announced on November 28, 2023, the

geologically significant, high-grade Kitoko copper discovery on a new joint

venture licence, as well as the maiden Mineral Resource estimates for the

Makoko and Kiala high-grade copper discoveries, as announced on November

13, 2023.

• Ivanhoe’s exploration budget for 2024 has quadrupled to approximately $90

million, with exploration activities primarily focused on the 2,654-square-

kilometre Western Forelands Exploration Project, including the expansion of

the Kitoko discovery. Seven drill rigs are currently active, with two more

arriving by quarter-end.

• At Kipushi, construction of the 800,000 tonnes-per-annum concentrator is

approximately 85% complete and ahead of schedule for commissioning in Q2

2024. Mining of the ultra-high-grade Big Zinc orebody has commenced ahead

of schedule. Approximately, 220,000 tonnes of lower-grade ore from

development is stockpiled on surface at an average grade of 22% zinc,

including approximately 30,000 tonnes of “medium-grade” at 30% zinc.

7

• Ivanhoe Mines and Gécamines signed a revised joint venture to restart the

ultra-high-grade Kipushi mine. Terms are unchanged from when initially

announced on February 14, 2022.

• At Platreef, an updated independent feasibility study (FS) is planned for the

second half of 2024 on an optimized development plan for Phase 2. The

optimized development plan accelerates the development of Phase 2 at a total

processing capacity of 4 million-tonnes-per-annum (Mtpa) by equipping Shaft

#3 for hoisting.

• Construction activities for the Platreef Phase 1 concentrator are on track for

completion in Q3 2024. Hot commissioning and ramp-up of production are

now planned to be deferred until early 2025. This decision was taken to

prioritize the increased underground development, including critical-path

Shaft #3 and Shaft #2 raise-boring, while hoisting capacity is constrained to

Shaft #1 only.

• An independent preliminary economic assessment (PEA) is planned

concurrently with the FS on a significantly larger Phase 3 expansion, once the

major 8 Mtpa Shaft #2 is available for hoisting. A Phase 3 expansion to 10

Mtpa processing capacity is expected to rank Platreef as one of the world’s

largest platinum-group metal, nickel, copper and gold producers.

• Ivanplats has signed a Purchase of Concentrate Agreement with Sibanye-

Stillwater for Phase 2 concentrate. The agreement is for 8 years from first

production and is for an initial annual volume of 60,000 tonnes of concentrate,

approximately one-third of anticipated Phase 2 volume.

8

Construction of the Phase 3 concentrator plant remains on budget and is

approx. 82% complete and ahead of schedule for first production as early

as June 2024. Once complete the production capacity of the Kamoa-Kakula

Copper Complex will increase to over 600,000 tonnes of copper per annum.

Conference call for investors on Monday, February 26

Ivanhoe Mines will hold an investor conference call to discuss its fourth quarter

and full year 2023 financial results at 3:30 p.m. London time / 10:30 a.m. Eastern

time / 7:30 a.m. Pacific time on Monday, February 26. The conference call will

conclude with a question-and-answer (Q&A) session. Media are invited to attend

on a listen-only basis.

To view the webcast use the link: https://edge.media-server.com/mmc/p/w8oyz543

Analysts are invited to join by phone for the Q&A using the following link:

https://register.vevent.com/register/BI1f49e4c5613b4c77916b60d88ac612f9

An audio webcast recording of the conference call, together with supporting

presentation slides, will be available on Ivanhoe Mines’ website at

www.ivanhoemines.com.

After issuance, the consolidated financial statements and Management’s

Discussion and Analysis will be available at www.ivanhoemines.com and under

the company’s SEDAR+ profile at www.sedarplus.ca:

Follow Robert Friedland (@robert_ivanhoe) and Ivanhoe Mines (@IvanhoeMines_)

on X.