Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ISO.TO ·

IsoEnergy Intersects Strong Uranium Mineralization in the First Two Follow-Up Drill Holes at the Hurricane Zone

Drill Results

IsoEnergy Intersects Strong Uranium Mineralization in the First Two

Follow-Up Drill Holes at the Hurricane Zone

Vancouver, BC, January 28, 2019 – IsoEnergy Ltd. (“IsoEnergy” or the “Company”) (TSXV: ISO; OTCQX: ISENF)

is pleased to announce that it has intersected intervals of strong (>20,000 total cps on an RS -125 hand-held

spectrometer) uranium mineralization at the Hurricane zone in the first two drill holes following-up last

summer’s intersection in drill hole LE18-01A. The Hurricane zone is a new discovery of high -grade uranium

mineralization on the Company’s 100% owned Larocque East property in the eastern Athabasca Basin of

northern Saskatchewan.

Drilling Highlights

• Both of the first two follow-up drill holes have intersected strong uranium mineralization

• The Hurricane zone is continuous and at least 25 metres wide on the discovery cross-section

• Eight drill holes remain to be drilled in the current program

Craig Parry, Chief Executive Officer commented: “I’m pleased to announce this very successful start to follow-

up drilling at our Hurricane Zone discovery in the prolific Eastern Athabasca Basin of Saskatchewan. With the

uranium price continuing to show strength and catalysts for rising prices continuing to develop we are in an

ideal position – drilling high-grade uranium in an environment of improving market conditions.”

Steve Blower, Vice President of Exploration commented: “The uranium intersections in drill holes LE19-02 and

LE19-03 demonstrate that the Hurricane zone is continuous across at least three drill holes on the discovery

section and is at least 25 metres wide, with much room for growth. We will continue to systematically evaluate

the potential for expansion with additional step-outs on this section followed by drilling along-strike.”

Drill Hole LE19-02

Drill hole LE1 9-02 was designed to evaluate the potential for expansion of the Hurricane zone 12.5 metres

north of the discovery drill hole LE18-01A. After penetrating 44 metres of overburden, drill hole LE19-02 cored

Athabasca sandstone to 329 metres and then basement metasedimentary gneiss to the end of the hole at 425

metres. Substantial uranium mineralization was intersected in the drill hole, demonstrating that the zone

extends at least 12.5 metres to the north of LE18-01A. The radioactive intervals (>1000 total cps on an RS-125

hand-held spectrometer) are summarized in Table 1 and are shown on a cross section in Figure 2. They include

a 2.0-metre-long zone of uranium mineralization perched in the sandstone and centered about 10 metres

above the unconformity, and a 3.5-metre-long zone of uranium mineralization that straddles the sub -

Athabasca unconformity . Mineralization includes fracture controlled and disseminated pitchblende with

hematite and clay. Within the lower interval is a 1.5-metre-long subinterval of strong radioactivity from 328.5-

330.0 metres that measures >20,000 cps on the RS-125. Within the 1.5-metre-long subinterval is a 0.5-metre-

long zone of dark grey to black semi -massive uranium mineralization that measures >50,000 cps (RS-125).

Basement rocks immediately beneath the mineralization consist of bleached and clay-rich graphitic cordierite

augen gneiss with two major fault zones that correlate well with large cataclasite faults intersected in drill hole

LE18-01A.

Drill Hole LE19-03

Designed to evaluate the potential for expansion of the Hurricane zone 12.5 metres south of the discovery

intersection, drill hole LE19-03 penetrated similar lengths of overburden and Athabasca sandstone as drill hole

LE19-02, described above. LE19-03 also intersected substantial amounts of uranium mineralization comprised

of two intervals that are listed in Table 1 and are shown on Figure 2. These include a 3.0 metre intersection

immediately above the sub-Athabasca unconformity that correlates with the main intersections in drill holes

LE18-01A and LE19 -02 and includes a 0.5-metre-long interval of strong radioactivity at the base of the

intersection that measures >20,000 cps (RS-125). These results demonstrate that the Hurricane zone extends

at least 12.5 metres south of drill hole LE18-01A and has a minimum width on this cross-section of 25 metres.

Table 1 – Radioactive Intervals

Hole-ID From (m) To (m) Length (m) RS-125 Total CPS

LE19-02 316.5 318.5 2.0 >1000

and 319.5 320.0 0.5 >1000

and 326.5 330.0 3.5 >1000

incl. 328.5 330.0 1.5 >20,000

incl. 329.0 329.5 0.5 >50,000

LE19-03 324.0 324.5 0.5 >1,000

and 326.5 329.5 3.0 >1,000

Incl. 328.5 329.5 1.0 >5,000

incl. 329.0 329.5 0.5 >20,000

Larocque East

Larocque East consists of 6 mineral claims totaling 3,200 hectares and was recently purchased in May, 2018.

The Property is owned 100% by IsoEnergy and is not encumbered by any royalties or other interests. Larocque

East is immediately adjacent to the north end of IsoEnergy’s Geiger property and is 35 kilometres northwest of

Orano Canada’s McClean Lake uranium mine and mill.

The Property covers a 15-kilometre-long northeast extension of the Larocque Lake conductor system; a trend

of graphitic metasedimentary basement rocks that is associated with significant uranium mineralization in

several occurrences to the southwest of the Larocque East property . The closest of th ese are Cameco’s

Larocque Lake and Larocque North zones, which are located 6.5 kilometres and 0.4 kilometres, respectively, to

the southwest of the western Larocque East p roperty boundary. Drilling at the Larocque Lake zone has

returned historic intersections of up to 29.9% U 3O8 over 7.0 metres in drill hole Q22 -040. Drilling at the

Larocque North zone has returned intersections of up to 2.05% U3O8 over 0.8 metres in drill hole Q22-16. Like

the nearby Geiger property, Larocque East is located adjacent to the Wollaston -Mudjatik transition zone - a

major crustal suture related to most of the major uranium deposits in the eastern Athabasca Basin.

Importantly, the sandstone cover is thin, ranging between 140 metres and 330 metres in previous drilling.

A total of 23 historical drill holes have been completed on the Property along approximately 22 kilometres of

graphitic conductors. Five of the histo rical holes have intersected weak uranium mineralization on the

Larocque East property to date, including drill holes KER-07 (0.12% U 3O8 over 0.1 metre) and K ER-11 (0.06%

U3O8 over 0.5 metre) near the western property boundary, within the general vicinity of the Hurricane zone.

Next Steps

Drill holes LE19-02 and LE19-03 are the first of a planned 10 drill holes that will be completed over the next

four to five weeks. Geochemical results from these drill holes are expected within six weeks. The remainder

of the current drill program will consist of additional fence holes on the LE18-01A cross-section followed by

step-outs along-strike. Off the back of a $5.5M financing completed in December, 2018, the company is fully

funded for the current drill program and subsequent follow-up in 2019.

Figure 1 – Larocque East Property Location Map

Figure 2 – Cross-Section Through Drill Holes LE19-02, LE19-03 and LE18-01A

Qualified Person Statement

The scientific and technical information contained in this news release was prepared by Steve Blower, P.Geo.,

IsoEnergy’s Vice President, Exploration, who is a “qualified person” (as defined in National Instrument 43-101

– Standards of Disclosure for Mineral Projects). Mr. Blower has verified the data disclosed. This news release

refers to properties other than those in which the Company has an interest. Mineralization on those other

properties is not necessarily indicative of mineralization on the Company’s properties. An RS-125 hand-held

spectrometer was used to verify that the radioactivity is due to uranium. As drill hole s LE19-02 and LE19-03

were drilled vertically and the mineralization is interpreted to be horizontal, the true thickness is expected to

equal the cored intervals.

About IsoEnergy

IsoEnergy is a well -funded uranium exploration and development company with a portfolio of prospective

projects in the eastern Athabasca Basin in Saskatchewan, Canada and a historic inferred mineral resource

estimate at the Mountain Lake uranium deposit in Nunavut. IsoEnergy is led by a Board and Management

team with a track record of success in uranium exploration, development and operations. The Company was

founded and is supported by the team at its major shareholder, NexGen Energy Ltd.

Craig Parry

Chief Executive Officer

IsoEnergy Ltd.

+1 778 379 3211

[email protected]

www.isoenergy.ca

Investor Relations

Kin Communications

+1 604 684 6730

[email protected]

www.isoenergy.ca

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This news release shall not constitute an offer to sell or a solicitation of any offer to buy any securities,

nor shall there be any sale of any securities in any jurisd iction in which such offer, solicitation or sale

would be unlawful. The securities referenced herein have not been, nor will they be, registered under the

United States Securities Act of 1933, as amended (the “U.S. Securities Act”), and such securities may not

be offered or sold within the United States absent registration under the U.S. Securities Act or an

applicable exemption from the registration requirements thereunder.

Forward-Looking Information

The information contained herein contains “forward-looking statements” within the meaning of the

United States Private Securities Litigation Reform Act of 1995 and “forward -looking information” within

the meaning of applicable Canadian securities legislation. “Forward-looking information” includes, but is

not limited to, statements with respect to the activities, events or developments that the Company

expects or anticipates will or may occur in the future, including, without limitation, planned exploration

activities. Generally, but not always, fo rward-looking information and statements can be identified by

the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”,

“forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation thereof or variat ions of

such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might”

or “will be taken”, “occur” or “be achieved” or the negative connotation thereof.

Such forward-looking information and statements are based on numerous assumptions, including among

others, that the results of planned exploration activities are as anticipated, the price of uranium, the

anticipated cost of planned exploration activities, that general business and economic conditions will not

change in a material adverse manner, that financing will be available if and when needed and on

reasonable terms, that third party contractors, equipment and supplies and governmental and other

approvals required to conduct the Company’s planned exploration acti vities will be available on

reasonable terms and in a timely manner. Although the assumptions made by the Company in providing

forward-looking information or making forward -looking statements are considered reasonable by

management at the time, there can be no assurance that such assumptions will prove to be accurate.

Forward-looking information and statements also involve known and unknown risks and uncertainties

and other factors, which may cause actual events or results in future periods to differ materially from any

projections of future events or results expressed or implied by such forward -looking information or

statements, including, among others: negative operating cash flow and dependence on third party

financing, uncertainty of additional financing , no known mineral reserves or resources, the limited

operating history of the Company, the influence of a large shareholder, alternative sources of energy and

uranium prices, aboriginal title and consultation issues, reliance on key management and other

personnel, actual results of exploration activities being different than anticipated, changes in exploration

programs based upon results, availability of third party contractors, availability of equipment and

supplies, failure of equipment to operate as anticipated; accidents, effects of weather and other natural

phenomena and other risks associated with the mineral exploration industry, environmental risks,

changes in laws and regulations, community relations and delays in obtaining governmental or other

approvals.

Although the Company has attempted to identify important factors that could cause actual results to

differ materially from those contained in the forward-looking information or implied by forward-looking

information, there may be other factors th at cause results not to be as anticipated, estimated or

intended. There can be no assurance that forward -looking information and statements will prove to be

accurate, as actual results and future events could differ materially from those anticipated, estimated or

intended. Accordingly, readers should not place undue reliance on forward -looking statements or

information. The Company undertakes no obligation to update or reissue forward -looking information

as a result of new information or events except as required by applicable securities laws