Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ISO.TO ·

IsoEnergy Intersects Strong Radioactivity at the Hurricane Uranium Zone First drill hole LE20‐30 intersects 5.5m of Strong Radioactivity, extends zone 25m to the west

Drill Results

IsoEnergy Intersects Strong Radioactivity at the Hurricane Uranium 

Zone 

First drill hole LE20‐30 intersects 5.5m of Strong Radioactivity, extends zone 25m to the west 

Vancouver, BC, February 4, 2020  – IsoEnergy Ltd. (“ IsoEnergy” or the “ Company”) (TSXV: ISO; OTCQX: ISENF ) is 

pleased to report an intersection of strong radioactivity in the first drill hole of the winter program at the Hurricane 

zone.  The Hurricane zone is a new discovery of high‐grade uran ium mineralization on the Company’s 100% owned 

Larocque East property (the “Property”) in the Eastern Athabasca Basin of Saskatchewan (Figure 1). 

Highlights: 

 Drill hole LE20‐30 is located 25m west of the 2019 Hurricane zone footprint 

 The near‐vertical drill hole intersected 5.5m of strong radioactivity from 329.5‐335.0m 

 Mineralization  is  located  primar ily  in  the  basal  sandstone  imme diately  above  the  sub‐Athabasca 

unconformity at 334.8m 

Steve Blower, Vice President of Exploration commented: “I’m pleased that we’ve been able to extend the Hurricane 

zone  with  the first  drill  hole  of  the  winter program.    This  drill  will  continue  to  expand  the  zone  to  the  west  and 

complete several infill drill holes within the current Hurricane zone footprint.  We also eagerly await the results from 

the second drill, which has been tasked with evaluating the potential to expand the zone to the east.  That drill has 

now started its first hole, which is an undercut of 2019 step‐out drill hole LE19‐26.”   

Drill Hole LE20‐30 Details 

Drilled to evaluate the potential to expand the Hurricane zone footprint to the west, drill hole LE20‐30 was collared 

25m west of 2019 drill hole LE19‐12, which intersected 3.2% U3O8 and 2.1% Ni over 8.5m (Figure 2).  Drill hole LE20‐

30 encountered strongly altered sandstone before intersecting 5 .5m of strong radioactivity averaging greater than 

14,000  CPS  (RS‐125  hand‐held  spectrometer)  from  329.5‐335.0m  (F igure  3).    The  mineralization  is  located 

immediately above the sub‐Athabasca unconformity, which was intersected at 334.8m.  As the drill hole continued 

into the basement rocks beneath the unconformity, several strong faults were intersected, suggesting that additional 

targets remain to the south on t his section (Figure 4).  Sample s have been submitted to the analytical laboratory.  

Chemical assay results are expected within three to four weeks. 

Next Steps 

The LE20‐30 drill will remain on t he west end of the Hurricane  zone, infilling the current f ootprint of the zone and 

continuing to expand it to the w est, where a 50m gap still rema ins between drill hole LE20‐30 and the property 

boundary to the west.   

The second drill will evaluate the  potential to ex pand the zone  to the east.  This will include following up on the 

strong  alteration,  anomalous  geochemistry,  and  elevated  radioactivity  in  drill  hole  LE19‐26,  the  only  drill  hole 

completed  by the  Company to  date  that  is  beyond  the 500m  long  Hurricane zone  footprint.   Results  from  a  DC‐

Resistivity geophysical survey completed in the summer of 2019  support the highly prospective nature of the area, 

which extends for several kilometres to the east.  Meters and h oles are expected to be sp lit approximately equally 

between both drills.  Further results of the program will be reported periodically throughout the winter drill season.   

The Larocque East Property and the Hurricane Zone 

The 100% owned Larocque East property consists of 20 mineral claims totaling 8,371 ha and is not encumbered by 

any  royalties  or  other  interests.    Larocque  East  is  immediately a d j a c e n t  t o  t h e  n o r t h  e n d  o f  I s o E n e r g y ’ s  G e i g e r  

property and is 35 km northwest of Orano Canada’s McClean Lake uranium mine and mill.   

Along with other target areas, the Property covers a 15‐kilomet re‐long northeast extension of the Larocque Lake 

conductor system; a trend of graphitic metasedimentary basement rocks that is associated with significant uranium 

mineralization at the Hurricane zone, and in several occurrence s on Cameco Corp.’s neighbouring property to the 

southwest of Larocque East.  The Hurricane zone was discovered  in July, 2018 and was followed up with a 12‐hole 

drilling  campaign  in  the  winter  of  2019  and  a  recently  complete d  17‐hole  summer  2019  drilling  campaign.  

Dimensions are currently 500m along‐strike, 40m wide and up to 10m thick.  The zone is open for expansion along‐

strike and on most sections.  Mineralization is polymetallic and commonly straddles the sub‐Athabasca unconformity 

320 m below surface.  The best intersection to date is 5.4% U3O8 over 7.0m in drill hole LE19‐16A.  Drilling at Cameco 

Corp.’s Larocque Lake zone on the neighbouring property to the  southwest has returned historical intersections of 

up to 29.9% U3O8 over 7.0 m in drill hole Q22‐040.  Like the nearby Geiger property, Larocque East is located adjacent 

to the Wollaston‐Mudjatik transition zone ‐ a major crustal suture related to most of the major uranium deposits in 

the eastern Athabasca Basin.  Importantly, the sandstone cover on the Property is thin, ranging between 140 m and 

330 m in previous drilling.  In addition to the Hurricane zone  discovery, four historical d rill holes have intersected 

weak uranium mineralization at other locations on the Property to date.   

Figure 1 – Larocque East Property Map 

Figure 2 – Hurricane Zone Drill Hole Location Map 

Figure 3 – Drill Hole LE20‐30 Mineralization  

Figure 4 – Vertical Cross‐Section 4460E (Looking East) 

Qualified Person Statement 

The scientific and technical information contained in this news  release was prepared by Andy Carmichael, P.Geo., 

IsoEnergy’s  Senior  Geologist,  who  is  a  “Qualified  Person”  (as  defined  in  NI  43‐101  – Standards  of  Disclosure  for 

Mineral Projects).  Mr. Carmichael has verified the data disclosed.  As mineral ized drill holes at the Hurricane zone 

are oriented very steeply (‐80 to ‐90 degrees) into a zone of m ineralization that is interpreted to be horizontal, the 

true thickness of the intersections is expected to be greater t han or equal to 90% of the core lengths.  This news 

release refers to properties other than those in which the Comp any has an interest.  Mineralization on those other 

properties is not necessarily indicative of mineralization on t he Company’s properties.  For additional information 

regarding  the  Company’s  Larocque E a s t  P r o j e c t ,  i n c l u d i n g  i t s  q uality  assurance  and  quality  control  procedures, 

please see the Technical Report dated effective May 15, 2019 on the Company’s profile at www.sedar.com. 

About IsoEnergy 

IsoEnergy is a well‐funded uranium exploration and development company with a portfolio of prospective projects 

in the eastern Athabasca Basin in Saskatchewan, Canada and a hi storical inferred mineral resource estimate at the 

Mountain Lake uranium deposit in Nunavut.  IsoEnergy is led by a Board and Management team with a track record 

of success in uranium exploration, development and operations.   The Company was founded and is supported by 

the team at its major shareholder, NexGen Energy Ltd.   

Craig Parry 

Chief Executive Officer  

IsoEnergy Ltd. 

+1 778 379 3211 

[email protected] 

www.isoenergy.ca 

Investor Relations 

Kin Communications 

+1 604 684 6730 

[email protected]  

www.isoenergy.ca  

Neither the TSX Venture Exchange nor its Regulations Services Provider (as that term is defined in the policies of 

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

This news release shall not constitute an offer to sell or a so licitation of any offer to buy any securities, nor shall 

there be any sale of any securities in any jurisdiction in which such offer, solicitation or sale would be unlawful. The 

securities referenced herein hav e not been, nor will they be, r egistered under the United  States Securities Act of 

1933, as amended (the “U.S. Securities Act”), and such securities may not be offered or sold within the United States 

absent  registration  under  the  U.S. Securities  Act or  an applicable  exemption  from  the  registration  requirements 

thereunder.  

Forward‐Looking Information 

The information contained herein contains “forward‐looking statements” within the meaning of the United States 

Private Securities Litigation Reform Act of 1995 and “forward‐looking information” within the meaning of applicable 

Canadian  securities  legislation.  “Forward‐looking  information” i n c l u d e s ,  b u t  i s  n o t  l i m i t e d  t o ,  s t a t e m e n t s  w i t h  

respect to the activities, events or developments that the Comp any expects or anticipates will or may occur in the 

future,  including,  without  limitation,  planned  exploration  activities.  Generally,  but  not  always,  forward‐looking 

information  and  statements  can  be  identified  by  the  use  of  words  such  as  “plans”,  “expects”,  “is  expected”, 

“budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or the negative connotation 

thereof  or  variations  of  such  words  and  phrases  or  state  that  certain  actions,  events  or  results  “may”,  “could”, 

“would”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation thereof. 

Such forward‐looking information and statements are based on nu merous assumptions, including among others, 

that the results of planned exploration activities are as antic ipated, the price of uranium, the anticipated cost of 

planned exploration activities, that general business and economic conditions will not change in a material adverse 

manner, that financing will be available if and when needed and on reasonable terms, that third party contractors, 

equipment  and  supplies  and  governmental  and  other  approvals  required  to  conduct  the  Company’s  planned 

exploration activities will be available on reasonable terms and in a timely manner. Although the assumptions made 

by the Company in providing forward‐looking information or maki ng forward‐looking statements are considered 

reasonable by management at the time, there can be no assurance that such assumptions will prove to be accurate. 

Forward‐looking information and s tatements also involve known a nd unknown risks and uncertainties and other 

factors, which may cause actual events or results in future periods to differ materially from any projections of future 

events or results expressed or implied by such forward‐looking information or statements, including, among others: 

negative  operating  cash  flow  and  dependence  on  third  party  financing,  uncertainty  of  additional  financing,  no 

known  mineral  reserves  or  resources,  the  limited  operating  history  of  the  Company,  the  influence  of  a  large 

shareholder,  alternative sources of energy and uranium prices, aboriginal title and consultation issues, reliance on 

key  management  and  other  personnel,  actual  results  of  exploration  activities  being  different  than  anticipated, 

changes in exploration programs based upon results, availability of third party contractors, availability of equipment 

and  supplies,  failure  of  equipment  to  operate  as  anticipated;  accidents,  effects  of  weather  and  other  natural 

phenomena and other risks associated with the mineral exploration industry, environmental risks, changes in laws 

and regulations, community relations and delays in obtaining governmental or other approvals. 

Although  the  Company  has  attempted  to  identify  important  factors  that  could  cause  actual  results  to  differ 

materially  from  those  contained  in  the  forward‐looking  information  or  implied  by  forward‐looking  information, 

there  may  be  other  factors  that  cause  results  not  to  be  as  anticipated,  estimated  or  intended.  There  can  be  no 

assurance that forward‐looking information and statements will prove to be accurate, as actual results and future 

events could differ materially from those anticipated, estimated or intended. Accordingly, readers should not place 

undue reliance on forward‐looking statements or information.  T he Company undertakes no obligation to update 

or reissue forward‐looking information as a result of new infor mation or events except as required by applicable 

securities laws