Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

IPT.V ·

IMPACT Silver Announces the Start of Drilling on the El Canelo Vein System at Santa Teresa project

Exploration Programs

IMPACT Silver Announces the Start of Drilling

on the El Canelo Vein System at Santa Teresa

project

Trading Symbol: "IPT: TSX.V"

VANCOUVER

,

Feb. 19, 2019

/CNW/ - IMPACT Silver Corp. ("IMPACT" or the "Company") is

pleased to announce that diamond drilling has commenced on the El Canelo gold silver vein in the

Santa Teresa

area. Trench sampling along the strike of the vein at

10m

intervals returned an

average gold grade of 6.5 g/t over a true width of

1.66m

and a length of

50m

(News Release Dated

25 Sept. 2018

). The initial six hole program will test the vein system along strike and to a down dip

depth of

100m

at

50m

intervals.

"This small initial program follows our successful 2018 sampling program and allows IMPACT to test

potential continuity of veins we first encountered over a decade ago at much lower gold prices.

Given the proximity of the project to IMPACT's operation mills, potential large enough tonnage of

gold and copper could warrant near-term production prospects."

The strong gold potential of the general area was first recognized by IMPACT geologists between

2008 and 2013 while drilling the Carlos Pacheco and

San Juan

areas 1.5km to the north which

yielded high grade gold drilling values including 19.6 g/t gold across 2.9 meters and 3.84 g/t gold

across 6.7 meters. It's plausible that Carlos Pacheco are probably northern extensions of the

Santa

Teresa

mineralizing system. Detailed results can be viewed from previous reports by IMPACT dated

December 4, 2008

;

July 11, 2012

;

October 30, 2013

;

January 7, 2014

):

Exploration programs are ongoing in the San Ramon Sur area to the south of the San Ramon mine

which on

July 17, 2018

, the IMPACT team announced a new zone discovery with drilling results of

2.04 meters of 661 g/t silver and 4.97 meters of 354 g/t silver. Lastly – exploration is ongoing also

at Manto America area located about 4km to the south of

Santa Teresa

.

About IMPACT Silver:

IMPACT Silver Corp. is a successful silver explorer-producer with two processing plants on adjacent

districts within its 100% owned mineral concessions covering 357km

2

in central

Mexico

with

excellent infrastructure and labor force. Over the past thirteen years over 8.5 Moz of Silver has been

produced, generating revenues of

$175 million

, with no long-term debt. In the historic

Royal Mines

of

Zacualpan Silver District three underground silver mines feed the central 535 TPD Guadalupe

processing plant. To the south, in the

Mamatla

District the Capire processing plant is currently rated

at 200 tpd, but is expandable. It is adjacent to an open pit silver mine with a National Instrument 43-

101 ("NI 43-101") compliant resource of over 4.5

Moz Silver

, 48 million lbs Zinc and 21 million lbs

Lead (see IMPACT news release dated

January 18, 2016

) that is awaiting higher silver prices to be

restarted. Since acquiring the project, IMPACT has compiled an exhaustive database with over

5,000 old mine workings, assayed over 34,000 rock samples and over 54,000 drill core samples,

analysed over 50,000 soil samples, and put six mines into production. Additional information about

IMPACT and its operations can be found on the Company website at

www.IMPACTSilver.com

.

Qualified Person and NI 43-101 Disclosure

Wojtek Jakubowski

, P.Geo. is a "qualified person" within the meaning of NI 43-101 and has

reviewed, verified and approved the technical information disclosure contained in this press release.

On behalf of IMPACT Silver Corp.

"Frederick W. Davidson"

President & CEO

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-Looking and Cautionary Statements

This IMPACT News Release may contain certain "forward-looking" statements and information

relating to IMPACT that is based on the beliefs of IMPACT management, as well as assumptions

made by and information currently available to IMPACT management. Forward-looking information is

often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue",

"planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and

similar expressions, or describes a "goal", or variation of such words and phrases or state that

certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur

or be achieved. Such statements include, but are not limited to, statements with respect to the

expected use of proceeds of the Private Placement.

Such forward-looking information involves known and unknown risks and assumptions, including with

respect to, without limitations, exploration and development risks, expenditure and financing

requirements, title matters, operating hazards, metal prices, political and economic factors,

competitive factors, general economic conditions, relationships with vendors and strategic partners,

governmental regulation and supervision, seasonality, technological change, industry practices, and

one-time events. Should any one or more risks or uncertainties materialize or change, or should any

underlying assumptions prove incorrect, actual results and forward-looking statements may vary

materially from those described herein. IMPACT does not assume the obligation to update any

forward-looking statement.

The Company's decision to place a mine into production, expand a mine, make other production

related decisions or otherwise carry out mining and processing operations, is largely based on

internal non-public Company data and reports based on exploration, development and mining work

by the Company's geologists and engineers. The results of this work are evident in the discovery

and building of multiple mines for the Company and in the track record of mineral production and

financial returns of the Company since 2006. Under NI 43-101 the Company is required to disclose

that it has not based its production decisions on NI 43-101 compliant mineral resource or reserve

estimates, preliminary economic assessments or feasibility studies, and historically such projects

have increased uncertainty and risk of failure.

SOURCE

IMPACT Silver Corp.

View original content:

http://www.newswire.ca/en/releases/archive/February2019/19/c7263.html

%SEDAR: 00001640E

For further information:

Jerry Huang, CFO | Investor Relations, (604) 681 0172 or

[email protected]

CO: IMPACT Silver Corp.

CNW 11:37e 19-FEB-19