Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

IPT.V ·

IMPACT Silver Announces Results of Greenfields Drilling

Corporate Updates

IMPACT Silver Announces Results of

Greenfields Drilling

Vancouver, British Columbia--(Newsfile Corp. - January 4, 2023) - IMPACT Silver Corp. (TSXV: IPT)

(OTC Pink: ISVLF) (FSE: IKL) ("IMPACT" or the "Company") announces the completion its' 2022 Royal

Mines of Zacualpan area surface exploration drill program in central Mexico. Significant results for the

last sets of assays for 2022 were returned from greenfields targets at La Luz and San Antonio.

The

drilling was carried out with IMPACT's man portable hydraulic surface diamond drill rigs.

The historic La Luz mine is located to the west and along strike of the Pachuqueno mine workings in

IMPACT's operating Guadalupe Mine and also hosts a northeast trending vein, both of which were

tested by sixteen surface drill holes. Significant results from La Luz are listed below.

HOLE No.

FROM

(m)

TO (m)

INTERVAL

(m)

TRUE

WIDTH

(m)

Ag_g/t

Au_g/t

Pb_%

Zn_%

Z22-24

8.40

10.10

1.70

True

Widths

TBD

227.18

0.02

0.17

0.21

Z22-25

147.95

149.65

1.70

0.77

113.10

0.05

0.96

2.83

Z22-32

26.55

28.23

1.68

True

Widths

TBD

239.48

0.02

0.03

0.06

The San Antonio Zinc vein system is located 4km southeast of IMPACT's operating Guadalupe

Processing Plant and on trend with the Cuchara mine vein system.

The increase in the zinc price led to

testing the extent and continuity of San Antonio's known mineralized system which was last explored in

2007.

A total of seventeen holes were drilled to test the system at depth and along strike of historic mine

workings and previous drilling.

Significant San Antonio zinc results are listed below.

HOLE

No.

FROM

(m)

TO (m)

INTERVAL

(m)

TRUE_WIDTH

(m)

Ag g/t

Au g/t

Pb %

Zn %

Z22-40

56.65

58.25

1.60

True Widths

TBD

9.24

0.09

0.65

2.49

Z22-43

115.00

118.85

3.85

True Widths

TBD

18.16

0.51

0.60

2.30

Z22-43

153.10

154.35

1.25

True Widths

TBD

85.10

0.15

0.53

1.72

Z22-45

115.92

118.10

2.18

True Widths

TBD

38.40

0.30

0.35

1.99

Z22-45

157.10

160.60

3.50

True Widths

TBD

22.40

1.59

0.10

1.04

Z22-46

116.15

118.45

2.30

True Widths

TBD

11.34

0.42

0.22

6.25

Z22-46

166.00

166.30

0.30

True Widths

TBD

24.40

1.66

1.35

5.62

Z22-47

132.50

134.45

1.95

True Widths

TBD

30.62

0.08

2.60

1.86

Z22-49

188.00

189.35

1.35

True Widths

TBD

34.85

0.03

2.84

4.21

Z22-50

210.75

212.85

2.10

True Widths

TBD

32.00

0.73

0.19

1.48

Z22-55

103.80

105.34

1.54

True Widths

TBD

23.71

0.24

0.39

2.77

Z22-55

50.25

53.25

3.00

True Widths

TBD

11.13

1.90

0.26

0.69

Other drill results from these and other targets were low grade. Drilling is continuing with IMPACT's

underground rig in the Mina Grande mine located in the Cuchara area and field exploration is continuing

on multiple targets. Plans are being made for a large drill program in 2023.

ABOUT IMPACT SILVER

IMPACT Silver Corp. is a successful silver-gold explorer-producer with two processing plants on

adjacent districts within its 100% owned mineral concessions covering 211km

2

in central Mexico with

excellent infrastructure and labor force. Over the past 16 years, IMPACT has produced over 11.5 million

ounces of silver, generating revenues over $230 million, with no long-term debt.

At the Royal Mines of Zacualpan Silver District, three underground silver mines and one open pit mine

feed the central Guadalupe processing plant. To the south, in the Mamatla District, the Capire Project

includes a 200 tpd processing pilot plant adjacent to an open pit silver mine with an NI 43-101 inferred

mineral resource of over 4.5 million oz silver, 48 million lbs zinc and 21 million lbs lead (see IMPACT

news release dated January 18, 2016

for details and QP statement); Company engineers are reviewing

Capire for a potential restart of operations. With 16 years of exploration successes leading to production

cash flows, IMPACT has shown the Zacualpan Silver-Gold District to be endowed with many high-grade

silver and gold zones and has placed multiple zones into commercial production.

Additional information about IMPACT and its operations can be found on the Company website at

www.IMPACTSilver.com

. Follow us on Twitter

@IMPACT_Silver

and LinkedIn at

https://www.linkedin.com/company/impactsilver

.

Qualified Person and NI 43-101 Disclosure

Silvia Kohler, P.Geo. is a "qualified person" within the meaning of NI 43-101 and has approved the

technical information contained in this news release.

On behalf of IMPACT Silver Corp.

"Frederick W. Davidson"

President & CEO

For more information, please contact:

Jerry Huang

CFO | Investor Relations

(604) 681 0172 or

[email protected]

(778) 887 6489 Direct

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-Looking and Cautionary Statements

This IMPACT News Release may contain certain "forward-looking" statements and information relating

to IMPACT that is based on the beliefs of IMPACT management, as well as assumptions made by and

information currently available to IMPACT management. Forward-looking information is often, but not

always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned",

"expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar

expressions, or describes a "goal", or variation of such words and phrases or state that certain actions,

events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Such

statements include, but are not limited to, statements with respect to the expected use of proceeds of the

Private Placement.

Such forward-looking information involves known and unknown risks and assumptions, including with

respect to, without limitations, exploration and development risks, expenditure and financing

requirements, title matters, operating hazards, metal prices, political and economic factors, competitive

factors, general economic conditions, relationships with vendors and strategic partners, governmental

regulation and supervision, seasonality, technological change, industry practices, and one-time events.

Should any one or more risks or uncertainties materialize or change, or should any underlying

assumptions prove incorrect, actual results and forward-looking statements may vary materially from

those described herein. IMPACT does not assume the obligation to update any forward-looking

statement.

The Company's decision to place a mine into production, expand a mine, make other production related

decisions or otherwise carry out mining and processing operations, is largely based on internal non-

public Company data and reports based on exploration, development and mining work by the

Company's geologists and engineers. The results of this work are evident in the discovery and building

of multiple mines for the Company and in the track record of mineral production and financial returns of

the Company since 2006. Under NI 43-101 the Company is required to disclose that it has not based its

production decisions on NI 43-101 compliant mineral resource or reserve estimates, preliminary

economic assessments or feasibility studies, and historically such projects have increased uncertainty

and risk of failure.

303-543 Granville Street

Vancouver, BC, Canada V6C 1X8

Telephone 604 664-7707

www.impactsilver.com

Twitter

LinkedIn

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/150252