IPT.V ·

IMPACT Silver Announces Q3 2022 Results Revenue of $3.8 Million, Mine Operating Loss of $0.5 Million

Financials

IMPACT Silver Announces Q3 2022 Results

Revenue of $3.8 Million, Mine Operating Loss of $0.5 Million

Vancouver, British Columbia--(Newsfile Corp. - November 24, 2022) - IMPACT Silver Corp. (TSXV: IPT)

(OTC Pink: ISVLF) (FSE: IKL) ("IMPACT" or the "Company") announces its financial and operating

results for the third quarter ended September 30, 2022.

Despite both higher tonnage of ore processed and higher grade at the mill, the Company recorded $3.8

million in revenue for the third quarter of 2022, a drop of 8% from $4.1 million year before due to

significantly lower and fluctuating silver prices down 21% same period. Silver production and grade were

higher in Q3 2022 compared to Q3 2021.

After non-cash costs, the Company incurred a mine operating

loss of $0.5 million.

Fred Davidson, President & CEO of IMPACT, stated, "Within this quarter we witnessed a global

retraction in economic activities, surging inflation, a drastic rise in interest rates globally, and lower silver

price resulting in lower revenues compared to 2021 and higher costs, cumulating in a loss. With this near

unprecedented speed and timing of this interest rate hike, risk assets and non-yielding investments such

as precious metals fell precipitously over the last few months resulting in challenging liquidity for junior

resources sector.

"To rectify the financial challenges in the short term, the Company initiated a hiring freeze as well as an

initial round of layoffs. Having invested $1.6 million in exploration expenditures and mining assets during

the quarter ($4.3 million so far 2022), the Company has decided to defer a number of non-critical

projects and reduce the budget for exploration for the balance of 2022 to rein in costs to maximize

revenue with better grades and higher output. The Company remains optimistic about silver's long-term

pricing outlook as well as rising demand for renewable energy (photovoltaic cells) and is well positioned

to capitalize as one of the purest silver miners with 90% of revenue exposure to the silver metal.

"The cash position remains strong at $16.5 million with working capital of $17.6 million.

"IMPACT is a primary silver producer and is highly leveraged to silver prices. It is our plan for the

remaining months of 2022 to focus on operational efficiency and cost reduction strategies to advance

into 2023 with strength. With a strong pipeline of project exploration programs underway, strong working

capital, no long-term debt, and an efficient and nimble operation, IMPACT is well positioned to weather

the short-term volatilities."

Q3 2022 FINANCIAL REVIEW

Despite higher grades and silver production, lower silver prices of 15% resulted in a drop in

revenue to $3.8 million in Q3 2022, down from $4.1 million in Q3 2022.

The Company invested $1.6 million in exploration and mining assets during the quarter ($4.3

million year to date 2022).

Mine operating loss before amortization and depletion for Q3 2022 was $0.1 million compared to

$0.8 million income in Q3 2021, due to lower silver prices and higher costs.

Net loss for Q3 2022 was $1.2 million compared to net income of $0.04 million in Q3 2021.

Net working capital for the Company at September 30, 2022 was $17.6 million with cash on hand

of $16.5 million.

The Company continues to have no long-term debt.

Q3 2022 PRODUCTION REVIEW

Throughput at the mill was 39,816 tonnes in Q3 2022 compared to 34,587 tonnes in Q3 2021.

Q3 2022 silver sales were 169,835 ounces (Q3 2021 - 147,597 ounces), an increase of 15%.

In spite of higher grades, revenue per tonne sold in the current quarter dropped to $99.98 (Q3

2021 - $114.52).

During the quarter the price of silver was lower than the same period in 2021 by

approximately US$5 per ounce, impacting both revenue and earnings.

Average mill head grade improved 5% to 165g/t Silver Q3 2022 (156 g/t Q3 2021)

Direct costs per production tonne were $104.45 in Q3 2022, an increase of 16% from 2021's

comparative period of $91.31 due to a recent Union settlement and ongoing development and

drilling at the operating mines, some of which should translate to future cost reduction.

EXPLORATION & DEVELOPMENT PLANS

The 2022 exploration program of over 21,000m of drilling is wrapping up across the Company's

extensive land package utilizing four Company owned drills (2 surface rigs, 2 underground rigs).

Exploration targets are defined and prioritized using a very large computer database including over

5,000+ old mine workings, compiled over many years from historical maps, Company exploration

results, and other technical data on the project. During the first quarter, IMPACT announced drill results

from the Veta Negra Mine area and extensions including 257 g/t silver over 19.8 metres and 487 g/t

silver over 12.97 metres (see IMPACT news release dated February 7, 2022 for details). In the 2022

second and third quarters, drilling was carried out at Capire, Aurora 2, San Antonio and the northwest

parts of the Guadalupe/Pachuqueno Mine and fieldwork continued in the Veta Negra Mine area, San

Jorge, south extension of the San Ramon Mine, and the Noche Norte area.Drilling and exploration work

is planned for the Veta Negra Mine area, San Ramon Mine south extensions, the Alacran area, and the

San Jorge area.

Tailings dams at the Guadalupe production center are engineered to current standards and 100% of

(non-acidic) mine water is either recycled or lost to evaporation.

In 2021, the Company, as part of a

periodic review, engaged independent engineers to conduct a study on the status of the current

Guadalupe tailing's impoundment and are following the recommendations for improved operations.

Construction of tailings dam number 3 is almost complete and will accommodate approximately 9 years

of production tailings from the Guadalupe mill complex.

Subject to prevailing market conditions and current technical studies including ore sorting, expanding the

current pilot plant and infrastructure, in 2023 IMPACT is looking to potentially initiate the program to

restart production at the Capire open pit mine .

ENVIRONMENAL SOCIAL GOVERNANCE POLICIES (ESG)

IMPACT recognizes the paramount expectations that stakeholders and investors place on ESG and has

been proactive in ESG activities well before this became a requirement from financiers globally.

Environmental

IMPACT recognizes that exploration and mining create a physical change within the area of work.

The

Company believes in its responsibility to ensure that it minimizes the environmental impact of its efforts

and carries out reclamation on sites disturbed by its activities. As primarily an underground mining

situation, surface disturbance from mining has been minimal in the past.

In 2021, the trees planted as part of preparation for the new tailings facility number 3, were part of a

larger program to improve areas of past historical district wide physical disturbance.

For each tree

removed the Company planted a further 7 trees.

In conjunction with the municipality and the

Technological Baccalaureate Center, the Company planted approximately 6,000 trees of various

indigenous species in 2021. Planting of a further 10,000 trees is planned for 2022/2023.

The exploration drills used and owned by IMPACT are modular diamond drill rigs which minimize the

area of disturbance due to their small size and mobility. These drills rig require little in the way of drill

pads or access trails, no building of new roads, and the Company engages the local community for

logistical support and assistance as part of the drill crew.

On the Guadalupe Mine property surrounding the current tailings facilities and the complex's support

facilities, the Company, working with local farmers, planted 833 agave plants. The Company maintains a

greenhouse for nurturing the initial plants before being transferred to the field. Plans for the next 12

months are for a further 3,000 agaves to be planted. According to the Company's consultants, agave

plants have the ability to reduce and isolate large quantities of atmospheric CO2. They produce more

biomass above and below ground than most other plant species. Estimates are they can absorb and

store the dry weight equivalent of 30 to 60 tons of CO2 per hectare per year. Once established they do

not require irrigation and are relatively insensitive to rising global temperatures and drought.

Agave also

provides a cash crop for the local farmers as well as livestock feed.

Social

The Company keeps community members informed of its activities and works with the communities to

address local concerns. The employment of most workers from the local communities' fosters

understanding, and direct involvement in the Company's operations. The Company continues to provide

tools, materials and supplies to local communities, and contributes to local festivals. During the year it

has upgraded roads, and built a new school, as well as a badly needed health clinic. The Company has

also built soccer fields, basketball courts and other facilities for local communities.

Governance

Good governance is a priority for the Board of Directors. The Company has a strong, experienced

Board where a majority of Directors are independent and oversee governance of the Company through

Compensation and Audit Committees. The average years of experience of IMPACT's board members

in mining industry is 30 years and good governance is critical to earn the confidence of our stakeholders

as the Board continues to guide IMPACT through recent tumultuous times.

For further details and media of our various ESG initiatives please visit website:

https://impactsilver.com/corporate/esg/

or MD&A at

https://impactsilver.com/investors/financials/

.

A recorded conference call reviewing the financial and production results of the quarter ended Sept 30,

2022 will be available on the Company website on November 24

th

, 2022 at

https://impactsilver.com/media/conference-calls/

.

The information in this news release should be read in conjunction with the Company's unaudited

condensed consolidated interim financial statements and Management's Discussion and Analysis,

available on the Company website at

https://impactsilver.com

and on SEDAR at

www.sedar.com

. All

amounts are stated in Canadian dollars unless otherwise specified.

ABOUT IMPACT SILVER

IMPACT Silver Corp. is a successful silver-gold explorer-producer with two processing plants on

adjacent districts within its 100% owned mineral concessions covering 211km2 in central Mexico with

excellent infrastructure and labor force. Over the past 16 years, IMPACT has produced over 11 million

ounces of silver, generating revenues over $234 million, with no long-term debt.

At the Royal Mines of Zacualpan Silver District, three underground silver mines and one open pit mine

feed the central Guadalupe processing plant. To the south, in the Mamatla District, the Capire Project

includes a 200 tpd processing pilot plant adjacent to an open pit silver mine with a mineral resource of

over 4.5 million oz silver, 48 million lbs zinc and 21 million lbs lead (see IMPACT

news release dated

January 18, 2016

for details); Company engineers are reviewing Capire for potential restart of

operations. With 15 years of exploration successes leading to production cash flows, IMPACT has

shown the Zacualpan Silver-Gold District to be endowed with many high-grade silver-gold zones and has

placed multiple zones into commercial production.

Additional information about IMPACT and its operations can be found on the Company website at

https://impactsilver.com/

. Follow us on Twitter

@IMPACT_Silver

and LinkedIn at

https://www.linkedin.com/company/impactsilver

Qualified Person and NI 43-101 Disclosure

George Gorzynski, P.Eng., is a "qualified person" within the meaning of NI 43-101 and has approved the

technical information contained in this news release.

On behalf of IMPACT Silver Corp.

"Frederick W. Davidson"

President & CEO

For more information, please contact:

Jerry Huang

CFO | Investor Relations

(604) 664-7707 or

[email protected]

(778) 887 6489 Direct

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-Looking and Cautionary Statements

This IMPACT News Release may contain certain "forward-looking" statements and information relating to IMPACT that is based on the beliefs of

IMPACT management, as well as assumptions made by and information currently available to IMPACT management. Forward-looking information is

often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict",

"potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or

state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Such statements

include, but are not limited to, statements with respect to the expected use of proceeds of the Private Placement.

Such forward-looking information involves known and unknown risks and assumptions, including with respect to, without limitations, exploration and

development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive

factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervision, seasonality,

technological change, industry practices, and one-time events. Should any one or more risks or uncertainties materialize or change, or should any

underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein. IMPACT

does not assume the obligation to update any forward-looking statement.

The Company's decision to place a mine into production, expand a mine, make other production related decisions or otherwise carry out mining and

processing operations, is largely based on internal non-public Company data and reports based on exploration, development and mining work by the

Company's geologists and engineers. The results of this work are evident in the discovery and building of multiple mines for the Company and in the

track record of mineral production and financial returns of the Company since 2006. Under NI 43-101 the Company is required to disclose that it has

not based its production decisions on NI 43-101 compliant mineral resource or reserve estimates, preliminary economic assessments or feasibility

studies, and historically such projects have increased uncertainty and risk of failure.

303-543 Granville Street Telephone

(604) 664-7707

Vancouver, BC, Canada V6C 1X8

www.impactsilver.com

Twitter

LinkedIn

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/145621