IMPACT Silver Corp. (“IMPACT” or the “Company”) is pleased to announce its financial and
production results for the first quarter of 2017.
Fred Davidson, President and CEO, stated, “We started 2017 with a clean balance sheet and no debt along
with news that IMPACT was named to the 2017 TSX Venture 50. Operationally, revenues increased by
22% to $4.6 million in Q1-2017 from $3.8 million. The Company continues to improve its mine operating
earnings, achieving income of $0.5 million in Q1-2017 compared to $0.3 million in Q1-2016. Earnings
before interest, taxes, depreciation and amortizati on (EBITDA)1 improved to $0.3 million in Q1-2017
from $0.2 million in Q1-2016. W hile we cannot control the price of silver, we are committed to
maximizing efficiencies and cost control through managing our operations in a disciplined manner.
Building on a successful 2016, we have ongoing exploration plans at high potential targets and continue
to evaluate strategic transactions to continue growing value for our shareholders.”
Financial Overview
• Mine operating earnings increased to $0.5 million in Q1-2017 from $0.3 million in Q1-2016.
• Revenues increased 22% to $4.6 million in the first quarter of 2017 from $3.8 million in the same
period in 2016, due mainly to higher silver prices throughout the quarter.
• Net loss for the quarter was $0.4 million which inc luded $0.7 million of non- cash items in
amortization, depletion and share based compensation. This compared to a $0.3 million net loss in
the first quarter of 2016, which included $0.5 million of non-cash items in amortization and depletion.
Excluding non- cash items, adjusted net earnings in Q1 -2017 were $0.3 million compared to $0.2
million in Q1-2016.
• EBITDA improved 44% to $0.3 million for the first three months of 2017 from $0.2 million in the
same period of 2016.
• The Company’s cash position at March 31, 2017 remains strong at $7.6 million, with net working
capital of $9.8 million (Q1-2016 - $2.0 million).
Production Overview
• Production at the Guadalupe mill during the first quarter of 2017 came primarily from the San Ramon
Deeps Mine (40% of the mill feed), the Cuchara Mine (39% of the mill feed), and the Mirasol Mine
(17% of the total mill feed). The grade at San Ramon is highly variable and Mirasol is experiencing
declining grade as it is reaching the end of its mine life. Both of these factors contributed to a lower
grade mill feed in Q1-2017 compared to Q1-2016.
1 Earnings before interest, taxes, depreciation and amortization (EBITDA) is a non- IFRS measure which the Company believes prov ides meaningful
information about the Company’s financial performance.
• Average mill feed grade for silver was 177 grams per tonne (g/t) in the first three months of 2017,
down from 185 g/t in the same period of 2016.
• Silver production decreased slightly to 230,299 ounces in first quarter of 2017 from 240,414 ounces
in first quarter of 2016 due to lower grade coming from the Cuchara and Mirasol Mines, and
temporarily lower silver recovery during the quarter.
• The ongoing upgrades at Gaudalupe production center has increased throughput to 542 tonnes per day
(TPD) from 496 TPD a year ago.
Revenues in 2017 were positively impacted by stronger silver prices, which resulted in revenue per tonne
of $94.13 in the first quarter of 2017, a 7% increase from $88.14 in the first quarter of 2016.
Health and Safety Awards
IMPACT’s mining team recently received recognition The A ward for Excellence in health and safety
standards by the Secretary of Labour and Social Welfare in Mexico . This recognition acknowledges the
Company’s effective working environment, strong relationships with its employees , and reduced
workplace accidents, illnesses and absenteeism.
This award and others like it are testaments to IMPACT’s dedication to an industry leading standard in
health and safety of our staff and contractors.
Exploration
The Company will continue exploration with the goal of putting some of the 4,8 00+ compiled old mine
workings in the Zacualpan and Capire districts on a faster track to potential production and build miner al
inventories for mining. Fieldwork in the form of detailed geological mapping and rock sampling in old
mine workings was mainly focused on larger and higher grade target areas at Guadalupe South, Alacran
North and San Felipe. Utilizing new funds receive d in Q2-2016, the Company has initiated surface and
underground drilling programs to expand resources. Surface drilling is currently in progress at the
Cuchara Mine extensions . Drilling will also commence later this year at the San Felipe vein and other
prospects, located near the Guadalupe plant access road.
IMPACT has control of the majority of two entire mineral districts in central Mexico: the Royal Mines of
Zacualpan Silver District and the Capire- Mamatla Mineral District adjacent to and southwest of
Zacualpan.
IMPACT has a track record of successful exploration and rapid mine development. The Company’s long
term vision sees potential for establishing mills throughout the two districts, each fed by multiple mines
producing silver-lead-zinc as well as gold and copper.
The Company continues to look for expansion either through ongoing exploration programs and/or
strategic acquisitions and transactions.
A recorded conference call reviewing the financial and production results of the first quarter of 2017, will
be available on the Company website on May 29, 2017, at www.impactsilver.com/s/ConferenceCalls.asp.
The information in this news release should be read in conjunction with the Company’s unaudited
condensed consolidated interim financial statements and Management’s Discussion and Analysis,
available on the Company website at www.impactsilver.com and on SEDAR at www.sedar.com . All
amounts are stated in Canadian dollars unless otherwise specified.
Additional information about the Company and its operations can be found on the website,
www.impactsilver.com.
On behalf of the Directors of IMPACT Silver Corp.,
“Frederick W. Davidson”
President & CEO
For more information, please contact:
Frederick Davidson – President & Chief Executive Officer
(604) 681-0172 or [email protected]
Or
Jerry Huang, Investor Relations Manager
(604) 681-0172 or [email protected]
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward-Looking and Cautionary Statements
This IMPACT News Release contains certain “forward -looking” statements and information relating to
IMPACT that are based on the beliefs of, and assumptions made by, IMPACT management, following
consideration of the information currently available to IMPACT management. Such statements include
statements regarding the discovery and commercialization of commercial quantities of minerals,
improvements in profitability, increases to processing capacity, expansion of resource quality and
quantity, exploration goals, future results, the operational goals and outcomes in the Zacualpan and
Capire di stricts and generally, and future production as a result, expected 2017 drilling and testing
operations, IMPACT's exploration program for 2017, the completion and effectiveness of the mining
database project and other statements that are not historical fac ts. Readers are cautioned not to place
undue reliance on forward- looking statements, as there can be no assurance that the plans, intentions or
expectations upon which they are based will occur. By their nature, forward- looking statements involve
numerous assumptions, known and unknown risks and uncertainties, both general and specific, that
contribute to the possibility that the predictions, forecasts, projections and other forward- looking
statements will not occur, which may cause actual performance and r esults in future periods to differ
materially from any estimates or projections of future performance or results expressed or implied by
such forward-looking statements. These assumptions, risks and uncertainties include, without limitation,
exploration and development risks, expenditure and financing requirements, title matters, operating
hazards, metal prices, political and economic factors, competitive factors, general economic conditions,
relationships with vendors and strategic partners, governmental r egulation and supervision, seasonality,
technological change, industry practices, and one- time events. Should any one or more risks or
uncertainties materialize or change, or should any underlying assumptions prove incorrect, actual results
and forward -looking statements may vary materially from those described herein. IMPACT does not
assume any obligation to update any forward-looking statement contained herein other than in accordance
with applicable law.
The Company’s decision to place a mine into production, expand a mine, make other production related
decisions or otherwise carry out mining and processing operations, is largely based on internal non-public
Company data and reports based on exploration, development and mining work by the Company’s
geologists and engineers. The results of this work are evident in the discovery and building of multiple
mines for the Company and in the track record of mineral production and financial returns of the
Company since 2006. Under National Instrument 43-101, the Company is required to disclose that it has
not based its production decisions on NI 43 -101 compliant mineral resource or reserve estimates,
preliminary economic assessments or feasibility studies, and historically such projects have increased
uncertainty and risk.