Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

INFM.V ·

Burin Gold starts drilling 10,000 m exploration program at Hickey’s Pond Gold Project, Newfoundland

Exploration Programs

Burin Gold starts drilling 10,000 m exploration program at Hickey’s

Pond Gold Project, Newfoundland

Vancouver, Canada, February 3rd, 2022 – Burin Gold Corp. (“Burin Gold” or the “Company”) (TSX-V:BURG)

is pleased to announce that drilling operations have commenced at its Hickey’s Pond – Paradise Gold Project (“HPP

Project”) on the Burin Peninsula in southeastern Newfoundland. The first of two planned diamond drills has been

mobilised to site and has started drilling at the Hickey’s Pond prospect. A minimum of 10,000 m of diamond drilling

is planned for the property in 2022. This will include the first phase of a resource definition program at Hickey’s

Pond, as well as exploration drilling of several of the other high priority, yet to be drill tested targets on the property.

The program is fully funded, with approximately CAD 5.6 million currently in the Company treasury.

Hickey’s Pond drilling program

Drilling has commenced on the historical Hickey’s Pond showing. The Company’s initial scout drilling in 2020

obtained a best result of 10.8 m of 4.43 g/t Au within a larger interval of 58.25 m of 1.12 g/t Au in hole HP-20-002

(see Bonavista Resources news release of February 24, 2021). Overall, the footprint of the alteration system around

Hickey’s Pond is over 7 km in strike length, and less than 10% of this has received even cursory drill testing.

The first ten drill holes of the 2022 program will be located on the Hickey’s Pond showing, as follow-up drilling to

the Company’s 2020 scout drill holes. The new holes are designed to both expand the footprint of mineralisation

along strike , provide infill drilling for resource modelling, and test down-dip of the mineralised structure for

continuity of mineralisation to depth. A map of planned drilling on the Hickey’s Pond knob is given in Figure 1,

showing systematic drill testing of the mineralised outcrop. A total of 1,900 m in ten diamond drill holes are planned

for the area of the historical showing, drilled on four 50 m spaced sections.

Burin Gold’s Chief Executive Officer, David Clark PGeo, said: “I am pleased that our exploration team in

Newfoundland has mobilised a diamond drill quickly to start our 2022 drill program. We have many excellent

targets to test, so an early start will maximise the amount of drilling we can complete this year at Hickey’s Pond

and elsewhere on the property. We anticipate that, with current assay laboratory backlogs, gold assay results for

the first drill holes should be available in mid- April. However, our 2020 drill program has given us a good

understanding of the appearance of the mineralised units at Hickey’s Pond, so while gold assay results are pending,

we should be able to keep our shareholders updated with geological descriptions of alteration and mineralisation

observed in the drill holes.”

Second diamond drill mobilisation

A second diamo nd drill is planned for mobilisation in the next two weeks. The selection of drill targets for the

second drill will be dependent on the long-term weather forecast for the remainder of winter on the Burin Peninsula.

Along-strike drilling at Hickey’s Pond t o quickly expand the footprint of alteration and mineralisation and early

testing of other undrilled high priority targets are both planned; the order of drilling will proceed in the most efficient

manner possible.

Figure 1: Plan map of currently planned drill hole traces on the Hickey’s Pond showing, also showing drill hole traces of the Company’s

2020 drill holes.

Airborne geophysical survey update

Geotech Ltd. continue their airborne geophysical survey over the property. Survey equipment failures and bad

weather have slowed production significantly. The Company expects the survey to be completed in the coming

weeks.

About Burin Gold Corp.

Burin Gold is a recently listed public company on the TSX Venture Exchange. The Company’s principal asset is

its Hickey’s Pond-Paradise Gold Project on the Burin Peninsula, Newfoundland. This project contains the Hickey’s

Pond gold prospect, drill tested with an initial 1,000 m drill program in 2020 with best results of 10.8 m of 4.43 g/t

Au, as well as numerous other historical high-sulphidation epithermal gold showings that have yet to be drill tested.

With the successful completion of its IPO, the Company is well -positioned to commence a significant diamond

drilling campaign at the Hickey’s Pond prospect, planned to start Q1/2022.

Qualified Person

David Clark, MSc, PGeo, C hief Executive Officer of Burin Gold, is the Company’s designated Qualified Person

within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”). He

has prepared the technical content of this news release.

Acknowledgement

The Company acknowledges the financial assistance of the Mineral Development Division, Department of Industry,

Energy, and Technology, Government of Newfoundland & Labrador, via its Junior Exploration Assistance

Program. The program provides valuable financial rebates on exploration expenditures made in the province to

qualifying exploration companies. The Company has benefited from the program yearly since 2018.

On behalf of the Board

“David Clark”

CEO & Director

Further Information:

David Clark

CEO & Director

Burin Gold Corp.

1-877-620-4185 – toll free

[email protected]

Forward Looking Statements

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

This News Release includes certain “forward-looking statements” which are not comprised of historical facts. Forward looking statements

include estimates and statements that describe the Company’s future plans, objectives or goals, including words to the effect that the Company

or management expects a stated condition or result to occur. For ward looking statements may be identified by such terms as “believes”,

“anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. Since forward -looking statements are based on

assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these

statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet

management’s expectations. Risks, uncer tainties and other factors involved with forward-looking information could cause actual events,

results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information.

Forward looking information in this news release includes, but is not limited to, the Company’s objectives, goals or future plans, statements,

exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, t iming of the

commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially f rom such

forward-looking information include, but are not limited to failure to identify mineral resources, failure to convert estimated mineral

resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of

metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political

risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and

costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices,

delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks i nvolved in the

mineral exploration and development industry, an inability to predict and counteract the effects of COVID-19 on the business of the Company,

including but not limited to the effects of COVID -19 on the price of commodities, capital market conditions, restriction on labour and

international travel and supply chains, and those risks set out in the Company’s public documents filed on SEDAR. Although the Company

believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue

reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that

such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any

forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.