Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

IMR.V ·

Imetal Resources Commences Phase 2 Graphite Drilling at the Carheil Project IN Quebec

Exploration Programs

iMETAL RESOURCES COMMENCES PHASE 2 GRAPHITE DRILLING AT

THE CARHEIL PROJECT IN QUEBEC

VANCOUVER, British Columbia – January 11th, 2023 – iMetal Resources Inc. (TSX.V: IMR) (OTCQB:

IMRFF) (FRANKFURT: A7V) (“iMetal” or the “Company”) announces commencement of drilling at the

Company’s Carheil project, which lies in the Northern Abitibi Greenstone Belt in Québec. This Phase will

follow up on the excellent Phase I results from spring 2023.

Saf Dhillon, President & CEO, stated: "We are excited to follow up on our productive 2023 drill campaign

which successfully confirmed the previously drilled graphite horizon and started delineating 2 further

graphite horizons. Quebec is an excellent jurisdiction for mining and we are pleased to have such a

promising project to operate there.”

The Company has re-engaged DIAFOR Inc., of Malartic, Québec for this phase of drilling at the Carheil

project. DIAFOR has already established winter access and drilling began on the first planned hole for

phase 2 as of January 10 th, 2024. The program is targeting the three previously encountered graphite

horizons, focusing on defining the extent of the graphite along strike and down dip. Regional structures

will also be tested in order to probe the property for any additional mineral potential.

Phase I 2023 drilling encountered a graphite-bearing sedimentary unit occurring between volcanic units.

The sedimentary unit hosts several multi-meter graphite-rich horizons: previously reported results (drill

length not true width) from these horizons are highlighted below (Cg = Graphitic Carbon):

Hole CA-23-01

• 3.90 m at 7.08% Cg, from 151.1 metres, including 11.5% Cg over 1.9 m (ZONE A)

• 8.45 m at 2.53% Cg, from 237.6 m, including 7.05% Cg over 1.5 m (ZONE C)

Hole CA-23-02

• 4.65 m at 5.11% Cg, from 138.8 m, including 12.9% Cg over 1.2 m (ZONE A)

• 10.55 m at 2.89% Cg, from 196.5 m (ZONE B)

• 5.30 m at 4.25% Cg, from 242.9 m, including 7.90% Cg over 1.2 m (ZONE C)

Hole CA-23-03

• 4.90 m at 1.93% Cg, from 156.1 m (ZONE A)

• 4.70 m at 2.76% Cg, from 263.3 m, including 4.70% Cg over 2.1 m (ZONE C) (See 2023-May-

31 News Release)

Carheil is an exploration- stage project with multi -metal potential and previous graphite results. The

project is about 170 km north of Rouyn- Noranda in the Northern Abitibi Greenstone Belt. The project is

under 20 km to the west from the past -producing Selbaie Copper-Zinc-Silver-Gold mine (1.1 billion lbs

Cu, 2.4 billion lbs Zn, 71 million oz Ag, 1 million oz Au produced from 1981- 2004i), under 20 km to the

north from Hecla’s Casa Berardi Mine (127.5 Koz Au and 28.2 Koz Ag produced in 2022ii), and under 40

km to the southeast from Agnico Eagle’s Detour Lake mine (713 Koz Au produced in 2021 iii). Directly

bordering the property to the north is Midland Exploration/Probe Metals’ La Peltrie project, which recently

intersected a 345.5 m of Cu- Mo-Au-Ag mineralization grading 0.21 CuEq iv. iMetal cautions investors

the presence of mineralization at Selbaie, Casa Berardi, and Detour Lake is not necessarily

indicative of similar mineralization on the Carheil property.

QA/QC control procedures included the systematic insertion of certified blanks, and two different graphite

certified reference materials (CRM) at regular intervals (one QAQC sample for every 20 core samples)

into the sampling stream. Geochemistry analyses consisted of Graphitic carbon by IR Spectroscopy (C-

IR18), which uses an HCl leach to remove carbonates and roasting to remove organic carbon in order to

only identify carbon in graphitic form in the samples. Select samples were checked for gold by fire assay

and atomic absorption spectrometry (Au- AA26) with overlimit values subsequently analyzed using the

gravimetric finish (Au-GRA22) technique.

The scientific and technical information contained in this news release has been reviewed and approved by

Scott Zelligan, P. Geo ( Ontario), VP Exploration of iMetal and a qualified person as defined in National

Instrument 43-101.

Updated Private Placement Information

Further to the Company’s news release dated 14 December 2023 announcing the closing of the $364,000

Offering and related finders’ fees, the correct date of resale restrictions is until April 14, 2024.

About iMetal Resources Inc.

iMetal is a Canadian based junior exploration company focused on the exploration and development of its

portfolio of resource properties in Ontario and Quebec. The Flagship propert y Gowganda West, is an

exploration-stage gold project with a recent discovery hole of 48.5m at 0.85 g/t gold that borders the Juby

Deposit and is located within the Shining Tree Camp area in the southern part of the Abitibi Greenstone

Gold Belt about 100 km south- southeast of the Timmins Gold Camp. The 665-hectare Kerrs Gold deposit

comprises a series of gold-bearing pyritized quartz vein replacement breccias with a 2011 historic resource,

90 kilometres ENE of Timmins. The 220 -hectare Ghost Mountain property, 42 kilometres NE of Kirkland

Lake, lies 5 kilometres W of Agnico Eagle’s Holt and Holloway Mine. Carheil is an exploration-stage project

with multi-metal potential and previous graphite results. The project is about 170 km north of Rouyn-Noranda

in the Northern Abitibi Greenstone Belt.

ON BEHALF OF THE BOARD OF DIRECTORS,

Saf Dhillon

President & CEO

iMetal Resources Inc.

[email protected]

Tel. (604-484-3031)

Suite 550, 800 West Pender Street, Vancouver, British Columbia, V6C 2V6.

https://imetalresources.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This news release may include forward-looking statements that are subject to risks and uncertainties. All

statements within, other than statements of historical fact, are to be considered forward looking. Although

the Company believes the expectations expr essed in such forward- looking statements are based on

reasonable assumptions, such statements are not guarantees of future performance and actual results

or developments may differ materially from those in forward-looking statements. Factors that could cause

actual results to differ materially from those in forward-looking statements include results of exploration,

variations in results of mineralization, relationships with local communities, market prices, continued

availability of capital and financing, and general economic, market or business conditions. There can be

no assurances that such statements will prove accurate and, therefore, readers are advised to rely on

their own evaluation of such uncertainties. We do not assume any obligation to update any forward-

looking statements except as required under the applicable laws.

i SIGEOM; Ressources naturelles et Forêts, © Gouvernement du Québec, 2023

ii Casa Berardi|Quebec, Canada|Hecla Mining; © Hecla Mining Company, 2022

(https://www.hecla.com/operations/casa-berardi-quebec-canada)

iii Agnico Eagle Mines Limited – Operations – Operations – Detour Lake; © Agnico Eagle Mines Limited, 2023

(https://www.agnicoeagle.com/English/operations/operations/Detour-Lake-Mine/default.aspx)

iv Midland Exploration news release dated December 6, 2022