Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

IMG.TO ·

Initial Drilling Results Testing the Underground Mining Potential at Its Saramacca Project, Surinam

Drill Results

NEWS RELEASE

TSX:

IMG

NYSE:

IAG

IAMGOLD

ANNOUNCES

INITIAL DRILLING RESULTS

TESTING

THE

UNDERGROUND MINING POTENTIAL AT

ITS

SARAMACCA PROJECT, SURINAM

E

Toronto, Ontario,

August

7

,

201

9

–

IAMGOLD Corporation

(“IAMGOLD” or the “Company”) today

announced

results from

an

exploration drilling program

completed

on the

Saramacca

Joint Venture

P

roject

(the “Saramacca Project”)

,

located

25

k

ilometres

south

west

of

its

Rosebel

operation

and

125

k

ilometres

south

of

Paramaribo

,

Suriname

.

The

Saramacca

Project is a

70:30

joint venture between

IAMGOLD’s

Rosebel Gold Mines

N.V.

(“

RGM

”

)

and

the

Government of Suriname

.

The

C

ompany is reporting assay results from

fifteen

diamond drill holes

totaling

9,843

meters

completed to

test

the main fault corridor

as part of its 201

8

–

2019

exploration drilling

program

to

evaluat

e

the

underground resource potential

of the Saramacca deposit

.

Along with these results, the Co

mpany

is

highlighting

assay results

from seven diamond drill holes totaling 2,233 metres which were completed as

part of previous

drilling campaign

s

to support various technical studies relating to the Saramacca

development. These

latter

drill holes

pierce

below the

current

Mineral R

eserve

d

esign

pit

and are

therefore

considered

relevant to the

evaluation of potential

underground

mineral resources

.

T

he Company is also reporting

results from

twelve

diamond and rev

e

rse circulation drill holes

totaling

2,

061

meters

which

intersected

near surface mineralization

on

a

secondary mineralized corridor

to the

northwest along strike of the Saram

a

cca deposit

. This area is being considered as a

potential

location for

a portal for underground access

.

The assay results

are provided in

Tables 1

to 3

below and include the following highlights

(

drill hole

long

itudinal

section

s

are

attached to this news release

):

Saramacca Underground

P

otential

:

Drill hole

SMD

-

0067

:

21.0

metres grading

6.

05

g/t Au

includes

:

10.5

metres grading

9.72

g/t Au

Drill hole

SMD

-

0068

:

19.5

metres grading 5.

62

g/t Au

Drill hole

SMD

-

0069

:

20.0

metres grading

5.77

g/t Au

includes

:

4.5

metres grading

10.86

g/t Au

Drill hole

SMD

-

0071B

:

22.7

metres

grading

8.54

g/t Au

includes

:

9.0 metres grading 15.23

g/t Au

Drill hole

SMRC

-

0008

:

24.0

metres

grading 9.67

g/t Au

includes: 6.0 metres grading 26.41 g/t Au

Saramacca

Secondary Structure:

Drill hole SM

RC

-

00

08

:

6

.0 metres grading

26.41

g/t Au

and

6.0 metres grading

11.46

g/t Au

Drill hole SMD

-

00

82

:

4

.5 metres grading

19.99

g/t Au

Drill hole SMD

-

00

90A

:

6.0

metres grading

10.19

g/t Au

Craig MacDougall, Senior Vice President, Exploration for IAMGOLD, stated:

“

T

he initial results from

the

drilling program

to evaluate

the

potential

for

underground resources

are very encouraging and justify

additional diamond drilling to delineate

mineral resources

which could be extracted by underground mining

methods

.

The

drilling

results

along strike

of the Saramacca deposit

also continue to highlight the

exploration potential to further expand the mineral resources at and along the Saramacca mi

neralized

trend.

”

The Saramacca

Project

(on a 100% basis),

based on an open pit mining scenario

,

hosts estimated

Proven

and Probable Mineral Reserves totaling

1.5

million ounces of contained

g

old

and Measured and Indicated

Mineral Resources (inclusive of Reserves) totaling 1.8 million ounces of contained gold, and Inferred

p

age

2

of

7

Mineral Resources

totaling 0.3 million ounces of contained gold

(see news releases dated September 23,

2018 and February 19, 20

19). The Saramacca underground mining potential drilling program focused on

confirming continuity of mineralization below the current Mineral Reserve

design

pit and

to

advance the

delineation of potential underground mineral resources which could enhance

the future economic upside of

the project and the RGM operation.

In addition, a

secondary mineralization corridor was also discovered

approximately

300 meters

to the n

orth

w

est

of the design

pit, in an area considered favorable for a potential

portal instal

lation due to a relatively thin saprolitic profile.

201

8

–

201

9

Exploration Program

The 201

8

–

2019 underground potential exploration drilling program was designed to test

whether

high

grade

gold

mineralization’s

intersected

within

or

in the

immediate proximity of

the

current

Saramacca

pit

design extends at depth.

The drilling program has confirmed the presence of a wide corridor of mineralization with approximate

dimensions of 2

0

0

met

r

es

(strike), 15

met

r

es

(width) and 200

met

r

es

(depth)

located below the reserve

design

pit

(see Table 1

& 2

).

The

discovery of a

secondary mineralized corridor

in an area being

considered for the location of a portal also demonstrates the potential for further resource expansion

(see

Table 3).

This

secondary

zone has been intersected in drilling for

300 meters

along

strike,

over a

variable

width of

1 to

10

meters

(width),

extend

ing

to a depth of

200 meters (depth)

,

and

remains open

in all

directions.

The main mineralization corridor was targeted using drill

hole

spacing of approximately 70 met

r

es,

although the actual spacing var

ies

from 15 met

re

s to 100 met

re

s

(see

Figure 1:

long

itudinal

section below).

The gold mineralization

is

generally

confined

within the main fault area, which is continuous from surface

to a depth of

more than 500

met

r

es vertically, including about 400

m

et

r

es

into hard rock (

below

the

Saprolitic profile).

T

he secondary corridor

has been

drilled with a spacing varying from 50 to 100 meters

(see Figure 2)

. The

geometry, orientation and continuity

of the secondary corridor

is still under evaluation

,

but appears to follow the same

n

orth

w

est

trend as the main

deposit

,

with a sub

-

vertical dip.

The Saramacca

main

deposit

has

been delineated for at least

two kilomet

res

along strike

(

as constrained

within the

current resource

pit

design

),

and

only a 300

meters

strike length

ha

s

been investigat

ed

at depth

for

potential

underground

resources

.

Next Steps

Based on

the

encouraging

results,

the Company

will

continue

a

surface

delineation

drilling

program

in

2019

to better

defin

e

the Saramacca

deposit

at depth in an effort to increase the geological model

definition and

evaluate the potential for

underground mining

at Saramacca

.

The Company will use the

results of the drilling programs to support a concept study to demonstrate the economic

viability of a

potential underground development.

Technical Information and Quality Control Notes

The drilling results contained in this news release have been prepared in accordance with National

Instrument 43

-

101 Standards of Disclosure for Mineral Proj

ects.

The "Qualified Person" responsible for the supervision of the preparation, verification and review of the

technical information in this release is

Raphael Dutaut

, P.

Geo

.

,

Manager Resources Geology

for

IAMGOLD

. He is considered a "Qualified

Person" for the purposes of National Instrument 43

-

101 with

respect to the technical information being reported on

and is

responsible for the planning, supervision and

execution of

the diamond drilling program.

The technical information has been included h

erein with the

consent and prior review of the above noted Qualified Person.

The information in this news release was reviewed and approved by Craig MacDougall, P.Geo., Senior

Vice President, Exploration for IAMGOLD. Mr. MacDougall is a Qualified Person

as defined by National

Instrument 43

-

101.

The sampling of, and assay data from,

the

drill core is monitored through the implementation of a quality

assurance

-

quality control (QA

-

QC) program designed to follow industry best practice. Drill core

(NQ size

within mineralized envelop

) s

amples are selected by

the

RGM

-

IAMGOLD

geologists and sawn in half with

a diamond saw at the project site. Half of the core is retained at the site for reference purposes

. Sample

intervals may vary from

6

0

centimeters

to

thee m

et

r

es, with the vast majority being

one and a half metre

s

in length depending on the geological observations.

Samples were

stored in sealed plastic bags and

p

age

3

of

7

packed into

fiber

backs onto a pallet where they were shrink wrapped for transport.

A formal chain

-

of

-

custody procedure

was

adopted for security of samples until their delivery at the laboratory.

The internal

RGM

l

aboratory (the

“I

nternal

L

aboratory

”

) was used

to

complete the

assay analyses.

The

Internal

L

aboratory (certification ISO/IEC 17025:2005) completed the following: Samples are coarse

crushed to 75% passing 2.35 mm screen (8 mesh screen), riffle split (700 gram) and (mild steel) to 95%

passing 88µm (170 mes

h). Cleaner sand is included. Samples were analyzed using a standard 30 gram

fire assay (30 g aliquot) with an Atomic Absorption (AA) finish. For samples that returned assay values

over 0.3 grams per tonne (g/t), a second cut is taken from the original

pulp and fire assayed a second time.

IAMGOLD inserts blanks and certified reference standards in the sample sequence for quality control.

External check

s

are

performed

at

Filab Suriname Laboratory

(“Filab

”), which is an ALS Limited

representative in Suriname.

Filab

is a commercial certified laboratory (

ISO 9001:

2015)

which is

using

a

very similar procedure comprising the following:

Samples are coarse crushed to 75% passing 2.35 mm

screen (8 mesh screen), riffle split (700 gram) and pulverize to 85% passing 88µm (170 mesh).

Cleaner

sa

nd included. Samples were analyzed using a stand

ard 30 gram fire assay (30 g aliquot) with an Atomic

Absorption (AA) finish.

For samples that return assay values over 3.0 gram

s per tonne (g/t), another cut

was

taken from the original pulp and fire assayed with a gravimetric finish

was performed

.

IAMGOLD

inserts blanks and certified reference standards in the sampl

e sequence for quality control. External QA

-

QC checks

done since two years

confirmed the reliability of

the Internal Laboratory results

, although the

latest assays results were not yet sent

for

external

checks

.

Forward Looking Statement

This news release contains forward

-

looking statements. All statements, other than of historical fact, that address

activities, events or developments that the Company believes, expects or anticipates will or may

occur in the future

(including, without limitation, statements regarding expected, estimated or planned gold production, cash costs, margin

expansion, capital expenditures and exploration expenditures and statements regarding the estimation of mineral

reso

urces, exploration results, potential mineralization, potential mineral resources and mineral reserves) are forward

-

looking statements. Forward

-

looking statements are generally identifiable by use of the words “will”, “should”,

“continue”, “expect”, “antic

ipate”, “estimate”, “believe”, “intend”,

“to earn”, “to have’,

“plan” or “project” or the negative of

these words or other variations on these words or comparable terminology. Forward

-

looking statements are subject to

a number of risks and uncertainties, m

any of which are beyond the Company’s ability to control or predict, that may

cause the actual results of the Company to differ materially from those discussed in the forward

-

looking

statements.

Factors that could cause actual results or events to differ

materially from current expectations include,

among other things, without limitation, failure to meet expected, estimated or planned gold production, cash costs,

margin expansion, capital expenditures and exploration expenditures and failure to establish e

stimated mineral

resources, the possibility that future exploration results will not be consistent with the Company's expectations,

changes in world gold markets and other risks disclosed in IAMGOLD’s most recent Form 40

-

F/Annual Information

Form on file w

ith the United States Securities and Exchange Commission and Canadian provincial securities

regulatory authorities. Any forward

-

looking statement speaks only as of the date on which it is made and, except as

may be required by applicable securities laws, t

he Company disclaims any intent or obligation to update any forward

-

looking statement.

About IAMGOLD

IAMGOLD (

www.iamgold.com

) is a mid

-

tier mining company with four operating gold mines on three

continents. A solid base of strategic assets in North and South America and West Africa is complemented

by development and exploration projects and continued assessment of accretive acq

uisition opportunities.

IAMGOLD is in a strong financial position with extensive management and operational expertise.

For further information please contact

:

Indi Gopinathan

,

Investor Relation

s

Lead

, IAMGOLD Corporation

Tel: (416) 360

-

4743 Mobile: (416) 388

-

6883

Martin Dumont

, Senior Analyst Investor Relations, IAMGOLD Corporation

Tel: (416) 933

-

5783

Mobile: (647) 967

-

9942

Toll

-

free: 1

-

888

-

464

-

9999

[email protected]

Please note:

This entire news release may be accessed via fax, e

-

mail, IAMGOLD's website at www.iamgold.com and through Newsfile’s website

at

www.newsfilecorp.com

. All material information on IAMGOLD can be found at

www.sedar.com

or at

www.sec.gov

.

Si vous désirez obtenir la version française de ce communiqué, veuillez consulter le

http://www.iamgold.com/French/accueil/default.aspx

.

p

age

4

of

7

Table 1 Saramacca Underground Mining Project Drilling Results

-

2018

-

2019 Drilling

P

rogram

Hole No.

UTM WGS84

Zone 21N

AZ

DIP

EOH

From

To

Core

Interval

(1)

Au

(2)

Easting

Northing

Elevation

(°)

(°)

(m)

(m)

(m)

(m)

(g/t)

SMD

-

0066A

678,519

544,724

209

213

-

55

651

540.0

559.5

19.5

3.08

Including (3)

552.0

558.0

6.0

4.82

SMD

-

0067

678,480

544,752

207

213

-

55

600

514.5

535.5

21.0

6.05

Including (3)

525.0

535.5

10.5

9.72

SMD

-

0068

678,519

544,636

215

211

-

55

552

465.0

484.5

19.5

5.62

SMD

-

0069

678,552

544,681

210

213

-

55

600

532.5

552.5

20.0

5.77

Including (3)

546.0

550.5

4.5

10.86

SMD

-

0070B

678,601

544,791

176

212

-

55

801

636.5

639.5

3.0

2.70

SMD

-

0071B

678,462

544,767

204

212

-

57

597

525.0

547.7

22.7

8.54

Including (3)

531.0

540.0

9.0

15.23

SMD

-

0072

678,578

544,590

209

212

-

52

501

470.0

472.9

2.9

2.39

SMD

-

0075

678,420

544,758

206

212

-

55

552

no significant

results

SMD

-

0078

678,616

544,710

194

212

-

57

702

no significant

results

SMD

-

0080B

678,674

544,860

165

212

-

60

954

727.5

730.5

3.0

3.02

SMD

-

0083

A

678,619

544,708

194

217

-

55

750

619.0

622.0

3.0

3.32

SMD

-

0085

678,543

544,848

171

215

-

53

762

no significant

results

SMD

-

0086

678,477

544,888

167

204

-

58

744

no significant

results

SMD

-

0088

678,521

544,720

209

213

-

52

576

531

.0

547.5

16.5

2.05

SMD

-

0089A

678,540

544,618

213

213

-

52

501

442.5

462.0

19.5

3.12

Including (3)

460.5

462.0

1.5

15.50

Table 2 Saramacca Underground Mining Project Drilling Results

-

2017

-

2018 Drilling

P

rogram

Hole No.

UTM WGS84 Zone 21N

AZ

DIP

EOH

From

To

Core

Interval

(1)

Au

(2)

Easting

Northing

Elevation

(°)

(°)

(m)

(m)

(m)

(m)

(g/t)

SMD

-

0004

678,413

544,661

223

215

-

55

450

349.5

358.0

8.5

11.07

SMD

-

0005

678,450

544,625

225

215

-

51

411

366.5

395.0

28.5

5.96

Including (3)

383.0

392.0

9.0

8.38

SMD

-

0030

678,408

544,697

220

215

-

55

453

396.0

406.5

10.5

4.09

SMD

-

0031

678,526

544,562

213

215

-

50

402

351.0

360.0

9.0

3.06

SMDD17

-

213

678,478

544,616

219

215

-

50

432

360.5

393.3

32.8

4.72

Including (3)

371.0

381.5

10.5

7.47

SMDD17

-

227

678,490

544,708

215

215

-

50

483

460.5

481.0

20.5

3.25

Including (3)

468.0

472.0

4.0

6.29

SMDD17

-

255

678,509

544,567

215

215

-

50

402

348.5

362.5

14.0

17.77

Including (3)

348.5

350.0

1.5

147.60

p

age

5

of

7

Table 3 Saramacca Underground Mining Project Drilling Results

–

Secondary

Mineralized

Z

one

Hole No.

UTM WGS84 Zone 21N

AZ

DIP

EOH

From

To

Core

Interval

(1)

Au

(2)

Easting

Northing

Elevation

(°)

(°)

(m)

(m)

(m)

(m)

(g/t)

SMD

-

0079

678,123

545,259

55

215

-

50

150

113.2

114.2

1

.0

23.36

SMD

-

0081

677,998

545,249

57

215

-

51

150

79.5

84.0

4.5

7.85

SMD

-

0082

678,011

545,448

56

35

-

40

150

109.5

114

.0

4.5

19.99

Including (3)

109.5

112.5

3.0

27.77

SMD

-

0090A

677,885

545,459

90

35

-

50

165

231

.0

237.0

6

.0

10.19

Including (3)

231.0

235.5

4.5

12.04

SMD

-

0091

677,885

545,459

90

35

-

50

165

60.0

67.5

7.5

2.54

SMD

-

0092

677,945

545,211

62

35

-

52

249

181.5

183.0

1.5

111.40

SMD

-

0093

678,023

545,150

88

35

-

50

228

178.3

179.3

1

.0

58.21

SMRC

-

0016

678,035

545,415

53

215

-

50

150

100

.0

110

.0

10

.0

3.09

SMRC

-

0008

678,100

545310

55

213

-

48

150

72

.0

96

.0

24

.0

9.67

Including (3)

72

.0

78

.0

6

.0

11.46

90

.0

96

.0

6

.0

26.41

SMRC

-

0023

677,994

545,496

62

215

-

50

150

92.0

96.0

4.0

5.10

Including (3)

92.0

94.0

2.0

9.33

SMRC

-

0025

678,147

545,216

78

215

-

50

150

58

.0

60

.0

2

.0

3.34

SMD

D

18

-

276

677,992

545,194

68

35

-

49

204

133.5

135

.0

1.5

9.76

Notes:

1.

E

stimate

d

true

widths

are

approx

imately

6

5

to 9

0

% of the Core Interval.

2.

Drill hole intercepts are calculated with a

lower cut

-

off grade of 2.0 g/t Au

.

3.

Assay intervals are reported uncut, but higher grade sub intervals are shown.

4.

Reverse Circulation

(RC)

hole

s

from 2016 campaign.

p

age

6

of

7

Figure 1

:

Saramacca

–

Underground potential

drill hole

long section

and highlighted

2018

-

2019

assay results

for the main Fault

corridor

.

p

age

7

of

7

Figure

2

: Saramacca

–

Underground potential

drill hole

long section

and highlighted

2018

-

2019

assay results

for secondary

mineralized corridor

.