Iamgold Realizes 86% Year over Year Increase IN Reserves 2017 Reserves of 14.5 Million Ounces and Measured and Indicated Resources of 24.7 Million Ounces

Resource Estimates

NEWS RELEASE

TSX: IMG NYSE: IAG

IAMGOLD REALIZES 86% YEAR OVER YEAR INCREASE IN RESERVES

2017 RESERVES OF 14.5 MILLION OUNCES

AND MEASURED AND INDICATED RESOURCES OF 24.7 MILLION OUNCES

All dollar amounts are in U.S. dollars unless otherwise indicated.

Measured and Indicated Resource Estimates are quoted Inclusive of Mineral Reserves for all sites and projects

Toronto, Ontario, February 12, 2018 – IAMGOLD Corporation (“IAMGOLD” or “the Company”) today announced

its 2017 year-end mineral reserve and resource statement. (See attached table for more details.)

Total attributable Proven and Probable gold Reserves increased by 86.0% to 14.5 million ounces at the end of 2017

from 7.8 million ounces of gold at the end of 2016. The addition of 6.7 million ounces was primarily due to conversion

of Resources to Reserves at the Côté Gold Project in Ontario, Canada and at the Boto Gold Project in eastern

Senegal, West Africa following positive results from the Pre-feasibility Studies, coupled with the previously

announced Reserve increase at the Rosebel Gold Mine. These increases were partially offset by depletion during

the year given the Company's attributable gold production of 882,000 ounces. There was no change in the $1,200

per ounce gold price assumption for estimating Mineral Reserves at the Company’s owned and operated

mines.

Total attributable Measured and Indicated gold Resources (inclusive of Reserves) increased overall by 6% or

1.4 million ounces to 24.7 million ounces of gold at the end of 2017. Additionally, total attributable Inferred gold

Resources increased overall by 44% or 2.7 million ounces to 8.8 million ounces of gold at the end of 2017. There

were also no changes in the valuation assumptions for estimating mineral resources at Essakane and

Rosebel ($1,500 per ounce of gold) or at Westwood ($1,200 per ounce of gold using a 6.0 g/t Au cut-off over a

minimum width of 2 metres).

Steve Letwin, President and CEO of IAMGOLD, commented, “In 2017, we were able to crystallize significant gains in

reserve ounces within the company, carrying on from our great work in 2016 to advance our high potential targets

through both exploration successes and improved cost performance. All of our owner-operated mines reported year-

on-year increases in reserves after depletion, demonstrating the strength of our core operations. Additionally, the

completion of Prefeasibility Studies at Côté and Boto has allowed us to declare initial re serves for both projects,

setting up IAMGOLD with a growing, long-life production profile at a time when many are struggling with reserve life .

Even taking into account the sale of 30% of the large resource at Côté Gold to Sumitomo Metal Mining last June, we

have demonstrated net gains in both Measured & Indicated Resources and Inferred Resources. The maiden

Resource declaration for Saramacca is a strong start for Rosebel’s transformation.”

Mr. Letwin continued, “We are very excited about 2018 as it is setting up to be another year for significant growth in

our reserve and resource base. Drilling to expand Saramacca continues and we are working to incorporate the

existing and new resources into a consolidated Life-of-Mine plan for Rosebel and Saramacca which will allow us to

declare an initial reserve estimate for Saramacca in the second half of this year. Drilling being carried out as part of

the Côté Gold Feasibility Study will not only improve our confidence in the existing reserves, but is also expected to

permit the upgrade of inferred material to a higher resource category and ultimately support conversion into reserves.

The completion of the Heap Leach Prefeasibility Study for Essakane in the second quarter is expected to catalyze

the declaration of new Heap Leach reserves as well as increases in our CIL reserves and resources through the

justification of a further pit pushback. Essakane is also working on declaring a maiden resource estimate for the

Gossey satellite deposit later this year. We will be drilling another 110 kilometres at Westwood with the ongoing

objective to expand our planning reserves through conversion of inferred resources. An updated resource estimate

is planned for Diakha-Siribaya in Mali, West Africa, and maiden resource estimates are being initiated in 2018 for

Monster Lake and Nelligan in Quebec, Canada, and Eastern Borosi in Nicaragua.”

Summaries of the changes in the Reserves and Resources estimate and 2018 development plans for each of the key

assets are provided below.

page 2 of 7

Rosebel Gold Mine, Suriname: As announced on July 26, 2017, Rosebel was able declare significant increases in

both Reserves and Resources, even before including the Saramacca satellite deposit. Incorporating those additions

and mine depletion since that declaration date, Rosebel has realized a net, year-on-year increase in attributable

Reserves of 1.4 million ounces or 69% to 3.3 million ounces, which was the result of: (i) new resource models for

most of the Rosebel orebodies; (ii) positive impact of changes in the cost model for Rosebel, based on major cost

improvements; (iii) a revised mine planning approach based on a detailed pit phasing scheme complemented by an

optimized mine sequencing algorithm; and (iv) improved confidence in the pit slope design angles. Attributable

Measured and Indicated Resources increased year-on-year by 2.9 million ounces or 51% to 8.6 million ounces due

to those same factors. Inferred Resources increased from 0.6 million ounces to 2.6 million ounces year-on-year.

Little definition drilling and exploration work is planned for 2018 on the Rosebel Mine concessions as the mine

geology team focusses on Saramacca. Drilling done later in 2017, including in the Saddle Zones, will be

incorporated into the resource models and mine designs during 2018.

Essakane Gold Mine: Essakane attributable Reserves for 2017 increased by 2%, net of depletion, to 3.1 million

ounces versus the year prior, due to conversion of resource ounces at the Essakane Main Zone (EMZ) and

Falagountou. Attributable Measured and Indicated Resources declined by 313,000 ounces or 7.5% to 3.8 million

ounces mainly due to depletion. Attributable Inferred Resources declined by 91,000 ounces to 348,000 ounces. In

the second quarter 2018, Essakane expects to complete a Prefeasibility Study on Heap Leach processing of EMZ

marginal grade material. Once completed, the operation is expecting to declare additional Heap Leach Reserves, as

well as to potentially add to the existing CIL Reserves for EMZ through justification of an additional pushback.

Essakane also conducted exploration drilling of the Gossey satellite zone, 15 kilometers to the northwest of the

Essakane processing plant, during 2016 and 2017. A maiden Resource estimate for Gossey should be completed in

2018. Exploration is ongoing on a number of other regional targets at Essakane.

Westwood Gold Mine, Canada: A net increase in Reserves of 130,000 ounces or 12% to 1.18 million ounces

converted from resources, after depletion. Measured and Indicated Resources increased by 227,000 ounces or 19%

to 1.4 million ounces as the 2017 delineation and valuation drilling (112 km) triggered a significant conversion from

Inferred Resources, which also drove the conversion of Resources to Reserves. Inferred Resources declined by 0.4

million ounces to 1.8 million ounces as a result of the same conversion exercise. Westwood is planning a further 110

kilometres of drilling during 2018 to continue building the planning reserves through conversion of resources.

Sadiola Gold Mine, Mali: At Sadiola, there was a net decrease year-on-year in attributable Reserves of 100,000

ounces or 6% to 1.7 million ounces due to depletion. Attributable Measured and Indicated Resources were

effectively unchanged at 2.9 million ounces as depletion was offset by newly identified resources and conversion of

Inferred material. Inferred Resources declined by 33,000 ounces to 0.4 million ounces. No significant exploration

activity is planned for Sadiola in 2018 as we continue to work to reach an agreement with the Government of Mali for

the path forward for the Sadiola Sulphide Project.

Côté Gold Project, Canada: An initial Reserve of 3.84 million attributable ounces, converted from resources as an

outcome of positive results from a Prefeasibility Study, was announced on June 5, 2017. Attributable Indicated and

Inferred Resources at Côté are now 5.2 million ounces and 0.8 million ounces respectively. Resources are lower

than the resources announced last year, primarily as a result of the sale of 30% of the IAMGOLD interest in Côté to

Sumitomo Metal Mining as announced concurrently with the Prefeasibility Study results. A Feasibility Study is

currently underway for the Côté Gold Project, with expected completion in the first half of 2019, at which time a

construction decision will be taken. As part of the feasibility work, a drilling program has been undertaken to: (i)

improve the confidence classification of the existing Reserves and Resources; (ii) convert Inferred Resources from

the Prefeasibility Study for inclusion in the Feasibility Study Reserves and mine plan; (iii) further geotechnical

investigation of the pit and infrastructure areas; and (iv) condemnation of infrastructure, tailings storage and mine

rock dump areas. An updated Reserve and Resource declaration, incorporating the new drilling and refined cost

models, will be produced as an outcome of this feasibility work.

Boto Gold Project, Senegal: The addition of 1.42 million attributable ounces of Reserves, converted from

Resources as an outcome of positive results from a Prefeasibility Study, which was announced on February 12,

2018. IAMGOLD is continuing exploration of the Boto concession during 2018 with the goal of identifying additional

resources to enhance the Boto project economics and mine life.

Saramacca Gold Project, Suriname. On September 5, 2017, a maiden resource was declared for the Saramacca

deposit, 25 km south of the Rosebel Gold Mine. Attributable Indicated Resources were estimated to be 680,000

ounces and attributable Inferred Resources were estimated to be 344,000 ounces. Exploration and resource

definition drilling continues at Saramacca, and an initial Reserve declaration is expected in the second half of 2018

page 3 of 7

upon completing development studies and an integrated Rosebel plus Saramacca mine plan and incorporating any

new drilling results that are available at that time. On January 24, 2018 IAMGOLD announced that it had been

granted rights to the Brokolonko exploration concession, on trend to the northwest of Saramacca and the previously

optioned Sarafina exploration concession creating a new gold district. Airborne geophysics, exploration field work,

and drilling will be undertaken in earnest throughout this new gold district during 2018.

Advance Exploration Projects: The Inferred Resources at the Pitangui Project in Minas Gerais, Brazil increased

year-on-year by 21% to 819,000 ounces as the result of orebody extensions identified through step out drilling.

Exploration at Pitangui will continue for 2018. Both Indicated and Inferred Resources at the Diakha-Siribaya

Project in Mali doubled versus the prior year (to 0.1 million ounces and 1.1 million ounces respectively) with the

acquisition of the 50% joint partner Merrex Gold as announced February 28, 2017. An updated resource estimate is

planned later in 2018 to incorporate significant additional drilling on strike from the originally identified resource,

including drilling from 2017 and 2018 on an expanded exploration concession. In past periods, IAMGOLD has

announced ongoing drill results from the Monster Lake and Nelligan joint venture projects in northeastern Quebec,

Canada and the Eastern Borosi joint venture project in Nicaragua. Work is underway to produce maiden resource

estimates for all of these projects during 2018.

Notes to Investors Regarding the Use of Resources

Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources

This news release uses the terms "measured resources" and "indicated resources". We advise investors that while those terms

are recognized and required by Canadian regulations, the United States Securities and Exchange Commission (the “SEC”) does

not recognize them. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be

converted into reserves.

Cautionary Note to Investors Concerning Estimates of Inferred Resources

This news release also uses the term "inferred resources". We advise investors that while this term is recognized and required by

Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their

existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred

mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may

not form the basis of feasibility or pre-feasibility studies, except in rare cases. Investors are cautioned not to assume that part or

all of an inferred resource exists, or is economically or legally mineable.

Scientific and Technical Disclosure

IAMGOLD is reporting mineral resource and reserve estimates in accordance with the CIM guidelines for the estimation,

classification and reporting of resources and reserves.

Note: Mineral reserves and mineral resources for IAMGOLD’s gold mines for the 2017 year-end statement were estimated using

a $1,200 per ounce gold price (unless otherwise indicated in the notes in Table 1) for mineral reserves and a $1,500 per ounce

price for mineral resources (unless otherwise indicated in the notes in Table 1). For open pit operations, gold resources are

constrained within an economic pit shell.

Cautionary Note to U.S. Investors

The SEC limits disclosure for U.S. reporting purposes to mineral deposits that a company can economically and legally extract or

produce. IAMGOLD uses certain terms in this news release, such as "measured," "indicated," or "inferred," which may not be

consistent with the reserve definitions established by the SEC. U.S. investors are urged to consider closely the disclosure in the

IAMGOLD Annual Reports on Forms 40-F. You can review and obtain copies of these filings from the SEC's website at

http://www.sec.gov/edgar.shtml or by contacting the Investor Relations department.

The Canadian Securities Administrators' National Instrument 43-101 ("NI 43-101") requires mining companies to disclose reserves

and resources using the subcategories of "proven" reserves, "probable" reserves, "measured" resources, "indicated" resources

and "inferred" resources. Mineral resources that are not mineral reserves do not demonstrate economic viability.

A mineral reserve is the economically mineable part of a measured or indicated mineral resource demonstrated by at least a

preliminary feasibility study. This study must include adequate information on mining, processing, metallurgical, economic and

other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A mineral reserve

includes diluting materials and allows for losses that may occur when the material is mined. A proven mineral reserve is the

economically mineable part of a measured mineral resource demonstrated by at least a preliminary feasibility study. A probable

page 4 of 7

mineral reserve is the economically mineable part of an indicated, and in some circumstances, a measured mineral resource

demonstrated by at least a preliminary feasibility study.

A mineral resource is a concentration or occurrence of natural, solid, inorganic material, or natural, solid fossilized organic material

including base and precious metals in or on the Earth's crust in such form and quantity and of such a grade or quality that it has

reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a mineral

resource are known, estimated or interpreted from specific geological evidence and knowledge. A measured mineral resource is

that part of a mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well

established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic

parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on

detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such

as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade

continuity. An indicated mineral resource is that part of a mineral resource for which quantity, grade or quality, densities, shape

and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical

and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based

on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as

outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be

reasonably assumed. An inferred mineral resource is that part of a mineral resource for which quantity and grade or quality can be

estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and

grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from

locations such as outcrops, trenches, pits, workings and drill holes. Mineral resources which are not mineral reserves do not have

demonstrated economic viability.

Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or

legally mineable.

A feasibility study is a comprehensive technical and economic study of the selected development option for a mineral project that

includes appropriately detailed assessments of realistically assumed mining, processing, metallurgical, economic, marketing,

legal, environmental, social and governmental considerations together with any other relevant operational factors and detailed

financial analysis, that are necessary to demonstrate at the time of reporting that extraction is reasonably justified (economically

mineable). The results of the study may reasonably serve as the basis for a final decision by a proponent or financial institution to

proceed with, or finance, the development of the project. The confidence level of the study will be higher than that of a Pre-

Feasibility Study.

A Pre-Feasibility Study is a comprehensive study of a range of options for the technical and economic viability of a mineral project

that has advanced to a stage where a preferred mining method, in the case of underground mining, or the pit configuration, in the

case of an open pit, is established and an effective method of mineral processing is determined. It includes a financial analysis

based on reasonable assumptions on mining, processing, metallurgical, economic, marketing, legal, environmental, social and

governmental considerations and the evaluation of any other relevant factors which are sufficient for a qualified person, acting

reasonably, to determine if all or part of the Mineral Resource may be classified as a Mineral Reserve.

Gold Technical Information and Qualified Person/Quality Control Notes

The mineral resource estimates contained in this news release have been prepared in accordance with National Instrument 43-

101 Standards of Disclosure for Mineral Projects (“NI 43-101”). The “Qualified Person” responsible for the supervision of the

preparation and review of all resource and reserve estimates for IAMGOLD is Lise Chenard, Eng., Director, Mining Geology. Lise

has worked in the mining industry for more than 35 years, mainly in operations, project development and consulting. She joined

IAMGOLD in April 2013 and acquired her knowledge of the Company’s operations and projects through site visits, information

reviews and ongoing communication and oversight of mine site technical service teams or consultants responsible for resource

and reserve modeling and estimation.

She is considered a “Qualified Person” for the purposes of NI 43-101 with respect to the mineralization being reported on. The

technical information has been included herein with the consent and prior review of the above noted Qualified Person. The

Qualified person has verified the data disclosed, and data underlying the information or opinions contained herein.

The information in this news release was reviewed and approved by Craig MacDougall, P.Geo., Senior Vice President,

Exploration for IAMGOLD. Mr. MacDougall is a Qualified Person as defined by National Instrument 43-101.

Forward Looking Statement

This news release contains forward-looking statements. All statements, other than of historical fact, that address activities, events

or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation,

statements regarding expected, estimated or planned gold production, cash costs, margin expansion, capital expenditures and

exploration expenditures and statements regarding the estimation of mineral resources, exploration results, potential

mineralization, potential mineral resources and mineral reserves) are forward-looking statements. Forward-looking statements are

generally identifiable by use of the words “may”, “will”, “should”, “continue”, “expect”, “expected”, “anticipate”, “estimate”, “believe”,

page 5 of 7

“intend”, “plan” or “project” or the negative of these words or other variations on these words or comparable terminology. Forward-

looking statements are subject to a number of risks and uncertainties, many of which are beyond the Company’s ability to control

or predict, that may cause the actual results of the Company to differ materially from those discussed in the forward-looking

statements. Factors that could cause actual results or events to differ materially from current expectations include, among other

things, without limitation, failure to meet expected, estimated or planned gold production, cash costs, margin expansion, capital

expenditures and exploration expenditures and failure to establish estimated mineral resources, the possibility that future

exploration results will not be consistent with the Company's expectations, changes in world gold markets and other risks

disclosed in IAMGOLD’s most recent Form 40-F/Annual Information Form on file with the United States Securities and Exchange

Commission and Canadian provincial securities regulatory authorities. Any forward-looking statement speaks only as of the date

on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation

to update any forward-looking statement.

About IAMGOLD

IAMGOLD (www.iamgold.com) is a mid-tier mining company with four operating gold mines on three continents. A

solid base of strategic assets in North and South America and West Africa is complemented by development and

exploration projects and continued assessment of accretive acquisition opportunities. IAMGOLD is in a strong

financial position with extensive management and operational expertise.

For further information please contact:

Ken Chernin, VP Investor Relations

Tel: (416) 360-4743 Mobile: (416) 388-6883

Laura Young, Director Investor Relations

Tel: (416) 933-4952 Mobile: (416) 670-3815

Martin Dumont, Investor Relations Associate

Tel: (416) 933-5783 Mobile: (647) 967-9942

IAMGOLD Corporation Toll-free: 1 888 464-9999 [email protected]

Please note:

This entire news release may be accessed via fax, e -mail, IAMGOLD's website at www.iamgold.com and through CNW Group’s website at

www.newswire.ca. All material information on IAMGOLD can be found at www.sedar.com or at www.sec.gov.

Si vous désirez obtenir la version française de ce communiqué, veuillez consulter le http://www.iamgold.com/French/accueil/default.aspx

page 6 of 7

Mineral Reserves and Resources of Gold Operations as of December 31, 2017 (1)(2)(3)(4)(5)(6)(7)(8)(9)(10)(11)(12)

MINERAL RESERVES AND RESOURCES

GOLD OPERATIONS

Tonnes

(000s)

Grade

(g/t)

Ounces

Contained

(000s)

Attributable

Contained Ounces

(000s)

Rosebel(4), Suriname (95%)

Proven Reserves 23,122 0.6 479 455

Probable Reserves 84,358 1.1 3,034 2,882

Subtotal 107,480 1.0 3,513 3,337

Measured Resources 45,561 0.7 1,059 1,006

Indicated Resources 254,010 1.0 8,036 7,634

Inferred Resources 86,471 1.0 2,704 2,569

Essakane(5), Burkina Faso (90%)

Probable Reserves 93,126 1.1 3,390 3,051

Subtotal 93,126 1.1 3,390 3,051

Indicated Resources 113,809 1.2 4,269 3,842

Inferred Resources 9,720 1.2 386 348

Westwood(6), Canada (100%)

Proven Reserves 998 7.9 252 252

Probable Reserves 3,770 7.6 924 924

Subtotal 4,768 7.7 1,176 1,176

Measured Resources 788 13.2 335 335

Indicated Resources 2,808 11.9 1,078 1,078

Inferred Resources 5,189 11.0 1,838 1,838

Sadiola(7), Mali (41%)

Proven Reserves 245 2.1 17 7

Probable Reserves 69,106 1.9 4,124 1,691

Subtotal 69,352 1.9 4,140 1,698

Measured Resources 245 2.1 17 7

Indicated Resources 122,451 1.8 7,040 2,887

Inferred Resources 17,661 1.7 956 392

Côté Gold(8), Canada (64.75%)

Probable Reserves 196,079 0.9 5,926 3,837

Subtotal 196,079 0.9 5,926 3,837

Indicated Resources 281,171 0.9 8,037 5,024

Inferred Resources 76,471 0.5 1,231 797

Saramaca(12), Suriname (66.5%)

Indicated Resources 14,444 2.2 1,022 680

Inferred Resources 13,632 1.2 518 344

Boto Gold(9), Senegal (100%)

Probable Reserves 26,841 1.6 1,415 1,415

Subtotal 26,841 1.6 1,415 1,415

Indicated Resources 37,408 1.6 1,922 1,922

Inferred Resources 10,981 1.7 594 594

Pitangui(10), Brazil (100%)

Inferred Resources 5,365 4.7 819 819

Diakha-Siribaya(11), Mali (100%)

Indicated Resources 2,102 1.9 129 129

Inferred Resources 19,816 1.7 1,092 1,092

TOTAL (13)

Proven & Probable Reserves 497,646 1.2 19,560 14,514

Measured and Indicated Resources 874,798 1.2 32,944 24,723

Inferred Resources 245,306 1.3 10,138 8,793

Notes:

(1) Measured and indicated resources are inclusive of proven and probable reserves.

page 7 of 7

(2) In mining operations, measured and indicated resources that are not mineral reserves are considered uneconomic at the price u sed for reserve estimations but are

deemed to have a reasonable prospect of economic extraction.

(3) Although “measured resources”, “indicated resources” and “inferred resources” are categories of mineralization that are recog nized and required to be disclosed

under Canadian regulations, the SEC does not recognize them. Disclosure of contained ounces is permitted under Canadian regulations; however, the SEC

generally permits resources to be reported only as in place tonnage and grade. See “Cautionary Note to U.S. Investors Regard ing Disclosure of Mineral Reserve

and Mineral Resource Estimates”.

(4) Rosebel mineral reserves have been estimated as of December 31, 2017 using a $1,200/oz gold price and mineral resources have been estimated as of

December 31, 2017 using a $1,500/oz gold price and have been estimated in accordance with NI 43-101.

(5) Essakane mineral reserves have been estimated as of December 31, 2017 using a $1,200/oz gold price and mineral resources have been estimated as of

December 31, 2017 using a $1,500/oz gold price and have been es timated in accordance with NI 43-101.

(6) Westwood mineral reserves have been estimated as of December 31, 2017 using a $1,200/oz gold price and mineral resources have been estimated as of

December 31, 2017 using a 6.0 g/t Au cut-off over a minimum width of 2 metres and have been estimated in accordance with NI 43-101.

(7) Mineral reserves at Sadiola have been estimated as of December 31, 2017 using an average of $1,200/oz gold price and mineral resources have been estimated

as of December 31, 2017 using a $1,400/oz gold price and have been estimated in accordance with the JORC code.

(8) Côté Gold mineral reserves have been estimated as of December 31, 2017 using a $1,200/oz gold price and the mineral resources have been estimated as of

December 31, 2017 using a $1,500/oz gold price and have been estimated in accordance with NI 43 -101.

(9) Boto Gold mineral reserves has been estimated as of December 31, 2017 using a $1,200/oz gold price and mineral resources have been estimated as of

December 31, 2017 using a $1,500/oz gold price and have been estimated in accordance with NI 43 -101.

(10) Pitangui mineral resources have been estimated as of December 31, 2017 using a $1,500/oz gold price and have been estimated i n accordance with NI 43-101.

(11) Diakha-Siribaya mineral resources have been estimated as of December 31, 2017 using $1,500/oz gold price and have been estimated in accordance with NI 43-

101.

(12) Saramacca mineral resources have been estimated as of December 31, 2017 using $1,500/oz gold pri ce and have been estimated in accordance with NI 43 -101.

(13 ) Due to rounding, numbers presented throughout this document may not add up precisely to the totals .

The Company’s reserve estimate is comprised of in -place material, i.e., contained ounces of gold and metallurgical

recovery factors must be taken into account in order to assess and quantify the recoverable material.

There are numerous parameters inherent in estimating proven and probable mineral reserves, including many factors

beyond the Compa ny’s control. The estimation of reserves is a subjective process, and the accuracy of any reserve

estimate is a function of the quality of available data and of engineering and geological interpretation and judgment.

Results from drilling, testing and production, as well as material changes in metal prices subsequent to the date of an

estimate, may justify a revision of such estimates.