Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ILI.V ·

Infinite Lithium Announces Additional Channel Sample Results Including 65.10 Metres of 1.10% Li2O from Jackpot Lithium Project

Drill Results Exploration Programs Sampling & Geoscience Results

Suite 1240, 789 West Pender St., Vancouver, British Columbia

Phone: 604-683-3995/ Toll Free: 888-945-4770/Fax: 604-683-3988

INFINITE LITHIUM ANNOUNCES ADDITIONAL CHANNEL SAMPLE RESULTS

INCLUDING 65.10 METRES OF 1.10% Li2O FROM JACKPOT LITHIUM PROJECT

November 22, 2018, Vancouver, BC, Canada – INFINITE LITHIUM CORP. (“Infinite” or the

“Company”) (TSX-V:ILI) (37NN –FRANKFURT) is pleased to announce results from its 2018 channel

sampling program at the Jackpot Lithium Property (the “Property” or “Jackpot”), located in the Georgia Lake

Area, Thunder Bay Mining Division, Ontario. Jackpot is located about 42 km north-northeast of Nipigon and

approximately 105 km east-northeast of the Great Lakes port City of Thunder Bay, Ontario.

To date, the Company’s channel sampling program has generated a total of 26 channel cuts (essentially surface

drill holes) from spodumene-bearing pegmatite outcrops (cleared mechanically and washed) over nine cleared

areas, comprising 372 individual channel samples (355.40 metres). Channel sample results from channels A3-

CH1, CH2, CH3 , and A5 -CH1 were released previously (see News Release dated August 16, 2018) but are

repeated here for completeness of results.

Highlights of channel sample results collected from five (5) cleared areas in the Jackpot Main area:

Area Channel From (m) To (m) Int (m) Li2O (%) Ta (ppm)

A1 A1-CH3 0.00 8.50 8.50 1.14 30.6

incl. 0.00 3.00 3.00 1.63 20.0

A1-CH4 0.00 9.10 9.10 1.15 33.4

incl. 5.00 9.10 4.10 1.61 19.9

A1-CH5 0.00 6.30 6.30 1.15 25.7

incl. 3.50 5.50 2.00 1.32 19.3

A3 A3-CH4 0.00 10.10 10.10 1.11 78.3

incl. 0.00 4.00 4.00 1.56 47.2

A3-CH5 0.00 10.30 10.30 1.39 55.5

incl. 0.00 4.00 4.00 1.75 23.4

A4 A4-CH1 0.00 65.10 65.10 1.10 82.2

incl. 29.00 39.00 10.00 1.87 35.7

A4-CH3 0.00 21.00 21.00 1.40 44.3

incl. 1.00 6.00 5.00 1.91 31.5

A4-CH4 0.00 6.00 6.00 1.05 46.9

incl. 4.00 5.00 1.00 2.43 21.0

A6 A6-CH1 0.00 7.70 7.70 2.42 46.5

incl. 4.70 7.70 3.00 4.11 12.6

A6-CH2 0.00 9.40 9.40 1.30 70.8

incl. 0.00 5.40 5.40 1.89 54.4

A11 A11-CH1 0.00 34.30 34.30 1.45 40.3

incl. 9.00 15.00 6.00 2.00 29.1

Channel samples were cut through exposed pegmatite at right angles to interpreted strike and importantly

represent minimum widths as the channel cuts were not sampled from contact to contact. As winter weather

conditions do not allow for further channel sa mpling, a short hole drilling program is underway, aimed at

delineating the geometry of the surface dikes and providing enough information to complete a future mineral

resource estimation of the surface dike system.

Michael England, President of Infinite Lithium, commented: "This year’s exploration program was a complete

success, with t he discover y of multiple surface and near-surface pegmatites being a game changer for the

development of the Jackpot project. The trenching, channel sampling, and prospecting programs uncovered what

appears to be at least four spodumene -mineralized surface dikes that will be the subject of a future mineral

resource estimation. Our current exploration program is focused on discovering the extent of these surface dikes

through a combination of channel sampling and shallow drilling that will help us understand the length, width ,

and depth of the surface pegmatite dikes. The grade of the surface mineralization is very encouraging, averaging

+1% Li 2O with numerous high -grade intercepts of +2% Li 2O and individual samples up to 6.85% Li 2O. This

grade compares very favourably to global hard rock lithium projects and I believe the surface potential at Jackpot

is a n important differentiator for our project as there is potential to build significant low -cost tonnage at an

excellent grade. The next step is to continue the exploration pro gram with a goal of building r esources on the

multiple surface dikes and the shallow-dipping Main Zone Dike. I am very confident in our ability to build a

significant asset at Jackpot which is close to existing infrastructure including roads, electricity, shipping ports,

and a skilled workforce."

Surface map of the central area, Jackpot Main property. The currently reported 25 channel cuts were collected from the eight

(8) areas shown as numbered green circles, with the remaining 12 areas shown as numbered blue squares. The four surface

pegmatite dikes (North, Central #1, Central #2, and South) and their interpreted extents are also shown (pink), along with

the interpreted surface outcropping of the Main Zone Dike (furthest south). [grey=sediments; orange=diabase]

Current interpretation of the pegmatite dike system suggests there are at least four approximately east - to west-

trending surface LCT pegmatite dikes, each interpreted to extend between 500 and 1,000 metres along strike

(open in both directions) and to be as much as 80 metres in width. The terrain north, ea st, and southeast of the

exposed surface dikes is extensively covered with alluvium and till, and is therefore better explored under frozen

winter conditions.

All channel sample results collected from eight (8) cleared areas in the Jackpot Main area:

*previously reported

Area Channel From (m) To (m) Int (m) Li2O (%) Ta (ppm)

A1 A1-CH1 0.00 12.60 12.60 0.60 53.9

incl. 2.00 6.00 4.00 1.13 26.4

A1-CH2 0.00 10.40 10.40 0.90 38.7

incl. 0.00 3.40 3.40 1.47 21.9

A1-CH3 0.00 8.50 8.50 1.14 30.6

incl. 0.00 3.00 3.00 1.63 20.0

A1-CH4 0.00 9.10 9.10 1.15 33.4

incl. 5.00 9.10 4.10 1.61 19.9

A1-CH5 0.00 6.30 6.30 1.15 25.7

incl. 3.50 5.50 2.00 1.32 19.3

A3 *A3-CH1 0.00 6.00 6.00 1.03 57.6

incl. 3.00 6.00 3.00 1.77 34.9

*A3-CH2 0.00 8.00 8.00 1.34 41.1

incl. 3.00 8.00 5.00 1.80 45.1

incl. 4.00 7.00 3.00 2.70 38.8

*A3-CH3 0.00 10.50 10.50 1.88 33.9

incl. 0.50 9.50 9.00 2.19 32.1

incl. 4.50 6.50 2.00 3.35 30.8

A3-CH4 0.00 10.10 10.10 1.11 78.3

incl. 0.00 4.00 4.00 1.56 47.2

A3-CH5 0.00 10.30 10.30 1.39 55.5

incl. 0.00 4.00 4.00 1.75 23.4

A3-CH6 0.00 8.20 8.20 0.90 76.9

incl. 5.00 6.00 1.00 2.39 25.1

A4 A4-CH1 0.00 65.10 65.10 1.10 82.2

incl. 0.00 8.00 8.00 1.96 56.2

incl. 29.00 39.00 10.00 1.87 35.7

incl. 42.00 48.00 6.00 1.60 49.3

A4-CH2 0.00 40.00 40.00 0.79 90.5

incl. 0.00 8.00 8.00 1.28 66.3

incl. 29.00 37.00 8.00 1.21 63.6

incl. 29.00 30.00 1.00 2.54 31.7

A4-CH3 0.00 21.00 21.00 1.40 44.3

incl. 1.00 6.00 5.00 1.91 31.5

incl. 11.00 16.00 5.00 1.84 29.3

A4-CH4 0.00 6.00 6.00 1.05 46.9

incl. 4.00 5.00 1.00 2.43 21.0

A5 *A5-CH1 0.00 4.60 4.60 1.09 18.5

incl. 2.00 3.00 1.00 1.81 36.6

All channel sample results collected from eight (8) cleared areas in the Jackpot Main area (cont.):

Quality Control

Channel samples are delivered to AGAT Laboratories in Thunder Bay, Ontario by one of the project personnel.

Following sample preparation in Thunder Bay the samples are shipped to AGAT Laboratories in Mississauga,

Ontario to undergo analyses. AGAT Laboratories Ltd. is accredited, for specific tests, to ISO/IEC 17025:2005

standard and is certified to ISO 9001:2015. External quartz blanks and external lithium standard s are inserted

into the channel sample stream at regular intervals. Samples are prepared by sodium peroxide fusion with analysis

by ICP -OES/ICP-MS finish and a detection li mit of 10 ppm Li ( 0.002% Li 2O). An ongoing Quality

Assurance/Quality Control (QA/QC) program is in place to monitor the results of the blanks and standards against

the sample assays. Results of blanks and standards for this program have passed QA/QC review indicating the

assay results are accurate and that no contamination has occurred.

Qualified Person

The technical content of this news release were approved by Dr. Scott Jobin-Bevans, P.Geo., a Qualified Person

as defined by the National Instrument 43-101. The Property has not been the subject of a National Instrument 43-

101 Technical Report.

Area Channel From (m) To (m) Int (m) Li2O (%) Ta (ppm)

A6 A6-CH1 0.00 7.70 7.70 2.42 46.5

incl. 4.70 7.70 3.00 4.11 12.6

incl. 6.70 7.70 1.00 6.85 2.7

A6-CH2 0.00 9.40 9.40 1.30 70.8

incl. 0.00 5.40 5.40 1.89 54.4

incl. 2.40 3.40 1.00 2.33 34.4

A6-CH3 0.00 9.60 9.60 0.53 223.7

incl. 2.60 6.60 4.00 1.14 90.0

incl. 4.60 5.60 1.00 2.10 21.9

A11 A11-CH1 0.00 34.30 34.30 1.45 40.3

incl. 9.00 15.00 6.00 2.00 29.1

incl. 18.00 26.00 8.00 2.03 49.3

incl. 28.00 34.00 6.00 1.73 27.5

A12 A12-CH1 0.00 12.00 12.00 0.19 110.8

incl. 9.00 11.00 2.00 0.66 65.2

A12-CH2 0.00 10.60 10.60 0.80 54.5

incl. 0.00 7.60 7.60 1.11 49.6

incl. 2.60 4.60 2.00 2.12 35.3

A14 A14-CH1 0.00 19.40 19.40 0.97 34.2

incl. 9.40 10.40 1.00 3.25 29.7

incl. 12.40 18.40 6.00 1.80 26.1

A14-CH2 0.00 3.60 3.60 2.70 21.9

incl. 0.60 1.60 1.00 4.07 8.7

A14-CH3 0.00 9.00 9.00 0.93 27.0

incl. 0.00 7.00 7.00 1.15 27.6

About Infinite Lithium

Infinite Lithium (TSX-V: ILI) is a junior mining exploration company focused on seeking and acquiring lithium

projects globally. Infinite Lithium has four hard rock lithium projects as well as one clay lithium project , all

located in North America. While work has been done to advance all five projects, Infinite Lithium’s primary

focus is on the Jackpot property in Ontario. The Company is currently building on an historical resource, which

is de-risked exploration while defining a surface lithium resource on the Jackpot property. Both targets, new and

historical, have produced some exceptional high-grade lithium results hosted by LCT pegmatites.

We seek Safe Harbor.

ON BEHALF OF THE BOARD

“Michael England”

Michael England, President, Director

FOR FURTHER INFORMATION, PLEASE CONTACT:

Telephone: 1-604-683-3995

Toll Free: 1-888-945-4770

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

FORWARD LOOKING STATEMENTS: This news release contains forward -looking statements, which relate to future events or

future performance and reflect management’s current expectations and assumptions. Such forward -looking statements reflect

management’s current beliefs and are based on assumptions made by and information currently available to the Company. Investors

are cautioned that these forward looking statements are neither promises nor guarantees, and are subject to risks and uncerta inties

that may cause future results to differ materially from those expected. These forward-looking statements are made as of the date hereof

and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revi se them

to reflect new events or cir cumstances. All of the forward -looking statements made in this press release are qualified by these

cautionary statements and by those made in our filings with SEDAR in Canada (available at www.sedar.com).